You can copy from here when filling out the rest of the page.
The applicant is proposing to stabilize approximately 500 linear feet along the Upper Yellowstone River. The project will consist of installing a rock riprap revetment and vegetated soils lifts long the side channel of the Yellowstone River.
The applicant is proposing to stabilize approximately 500 linear feet along the Upper Yellowstone River. The project will consist of installing a rock riprap revetment and vegetated soils lifts long the side channel of the Yellowstone River.