PUBLIC NOTICE: The proposed project includes the expansion of I-94 to 8 lanes (one additional lane in each direction), reconstruction of the 7 Mile Road interchange, and new construction of an interchange at Elm Road.
PROJECT DESCRIPTION AND PURPOSE: The proposed project includes the expansion of I-94 to 8 lanes (one additional lane in each direction), reconstruction of the 7 Mile Road interchange, and new construction of an interchange at Elm Road. The project site is located along 7.5 miles of I-94 from the south end of the College Avenue interchange in Milwaukee County to the south end of the 7 Mile Road interchange in Racine County.
Public Notice
APPLICANT:
Wisconsin Department of
Transportation
REFER TO:
MVP-2018-00096-ANM
ISSUED: March 26, 2018
EXPIRES: April 26, 2018
SECTION: 404 - Clean Water Act
1. APPLICATION FOR PERMIT TO permanently discharge dredged and fill material in a total
of 25.24 acres of waters of the U.S. associated with the reconstruction of the Interstate 94 (I-94)
and 7 Mile Road interchange and the new construction of an interchange at Elm Road in the
Village of Caledonia, Town of Raymond, and Cities of Oak Creek and Milwaukee in Racine and
Milwaukee Counties.
2. SPECIFIC INFORMATION
PROJECT LOCATION: The project site is located along 7.5 miles of I-94 from the south end of
the College Avenue interchange in Milwaukee County to the south end of the 7 Mile Road
interchange in Racine County. The project site is located in Sections 6, 7, Township 4 North,
Range 22 East; Sections 1, 12, Township 4 North, Range 21 East; Sections 6, 7, 18, 19, 30, 31,
Township 5 North, Range 22 East; and Section 6, Township 5 North, Range 22 East; Racine
and Milwaukee Counties, Wisconsin. See the attached drawings MVP-2018-00096-ANM,
Figures 1 to 9, for more information.
DESCRIPTION OF PROJECT: The proposed project includes the expansion of I-94 to 8 lanes
(one additional lane in each direction), reconstruction of the 7 Mile Road interchange, and new
construction of an interchange at Elm Road. The 7 Mile Road interchange is being
reconstructed as a tight diamond interchange and includes crossroad reconstruction.
Throughout the project area, seven new culverts would be installed and three culverts would be
replaced with concrete of similar diameter along I-94 and would connect to pipes already
constructed on the frontage roads.
The Federal Highway Administration (FHWA) is the lead federal agency for project review.
Several environmental documents were previously completed for both the I-94 reconstruction
and interchange and crossroads reconstruction. An I-94 Corridor Interchange Improvements
Environmental Assessment (EA) was prepared in 1996 and re-evaluated in 2008
(ftp://ftp.dot.wi.gov/dtsd/hcci/projectdocuments/20171114036/Question%20%234/EA/eareevalall
-070302.pdf), which addressed all of the interchanges and crossroads within the project area,
including the 7 Mile Road interchange. The I-94 North-South Final Environmental Impact
Statement (EIS) was prepared in 2008 and addressed the I-94 mainline segments within the
project area (https://projects.511wi.gov/i94northsouth/wp-content/uploads/sites/105/feis.pdf). A
re-evaluation of both documents applicable to this project was initiated in 2017.
QUANTITY, TYPE, AND AREA OF FILL: The proposed project is currently estimated to result
in the filling and permanent loss of approximately 24.46 acres of wetland. The impacted
wetlands include 0.14 acre of wooded swamp, 0.36 acre of riparian forested, 0.99 acre of shrub
scrub, 1.76 acre of riparian emergent, 6.76 acre of wet meadow, and 14.45 acres of shallow
marsh. Approximately 0.78 acre of tributaries would be impacted by riprap and end walls.
VEGETATION IN AFFECTED AREA: The wooded swamp wetland is dominated by common
reed, narrow-leaf cattail, and red osier dogwood. The riparian forested wetland is dominated by
Regulatory Branch (File No. 2018-00096-ANM)
calico aster, silver maple, phragmites, and reed canary grass. The shrub scrub wetland
consists of green ash, sandbar willow, narrowleaf cattail, and reed canary grass. The
vegetation in the riparian emergent wetland and wet meadow wetland is primarily invasive
species, including phragmites, reed canary grass and narrow-leaf cattail. The shallow marsh
wetland is dominated by seaside goldenrod, narrowleaf cattail, and phragmites.
SOURCE OF FILL MATERIAL: Any off-site fill utilized for the project would come from an
existing commercial source and would be free of any known contaminants.
SURROUNDING LAND USE: Most of the land use adjoining I-94 in Milwaukee County is
residential with some agricultural and commercial development throughout. The land use
transitions to more agricultural fields in the southern part of the project located in Racine
County.
THE FOLLOWING POTENTIALLY TOXIC MATERIALS COULD BE USED AT THE PROJECT
SITE: The project does not propose to use toxic materials, but fluid used in construction
equipment may pose a slight risk. All equipment would be maintained and stored according to
the Erosion Control Implementation Plan provided by the contractor.
THE FOLLOWING PRECAUTIONS TO PROTECT WATER QUALITY HAVE BEEN
DESCRIBED BY THE APPLICANT: The proposed project would be conducted in
compliance with the state's erosion control and stormwater best management practices to
prevent sediment from leaving the site during and after construction.
MITIGATION: The applicant proposes to fulfill federal compensatory mitigation requirements by
debiting 40.25 riparian emergent credits at the WisDOT Hope Marsh Phase II mitigation bank in
Marquette County.
3. FEDERALLY-LISTED THREATENED OR ENDANGERED WILDLIFE OR PLANTS OR
THEIR CRITICAL HABITAT
None were identified by the applicant or are known to exist in the permit area. However, the
proposed project is within the known or historic range of the following Federally-listed species:
Northern Long-Eared Bat
(Threatened)
Hibernates in caves and mines swarming in
surrounding wooded areas in autumn. Roosts and
forages in upland forests during spring and summer.
The FHWA as the lead federal agency consulted with the U.S. Fish and Wildlife Service. Any
additional comments received as a result of this notice concerning Federally-listed threatened or
endangered species and their critical habitat will be considered in our final assessment of the
project.
4. JURISDICTION
This application is being reviewed in accordance with the practices for documenting Corps
jurisdiction under Sections 9 & 10 of the Rivers and Harbors Act of 1899 and Section 404 of the
Clean Water Act identified in Regulatory Guidance Letter 16-01.
Page 2 of 4
Regulatory Branch (File No. 2018-00096-ANM)
5. STATE SECTION 401 WATER QUALITY CERTIFICATION
WATER QUALITY CERTIFICATION. This Public Notice has been sent to the Wisconsin
Department of Natural Resources and is considered by the District Engineer to constitute valid
notification to that agency for Section 401 water quality certification. A permit will not be granted
until the Wisconsin Department of Natural Resources has issued or waived Section 401
certification.
6. HISTORICAL/ARCHAEOLOGICAL
FHWA is the lead federal agency for project review pursuant to Section 106 of the National
Historic Preservation Act. The 2017 re-evaluation of the EA and EIS included a field
investigation and review of aerial images to determine whether there are any new structures
eligible for the National Register of Historic Places (NRHP) that were not eligible in 2007 (during
the re-evaluation of the 1996 EA) or in 2008 (EIS). In addition, a search of the Wisconsin
Historic Preservation Database (WHPD) indicated that there are no newly recorded
archaeological sites located within the project area. On July 10, 2017 (Racine County) and
January 9, 2018 (Milwaukee County), the WisDOT Cultural Resources Team determined no
new impacts to cultural resources were identified, therefore, no additional Section 106
coordination was needed with the State Historic Preservation Office (SHPO).
7.
PUBLIC HEARING REQUESTS
Any person may request, in writing, within the comment period specified in this notice, that a
public hearing be held to consider this application. Requests for public hearings shall state, in
detail, the reasons for holding a public hearing. A request may be denied if substantive reasons
for holding a hearing are not provided or if there is otherwise no valid interest to be served.
8. PUBLIC INTEREST REVIEW
The decision whether to issue a permit will be based on an evaluation of the probable impact,
including cumulative impacts, of the proposed activity on the public interest. That decision will
reflect the national concern for both protection and utilization of important resources. The
benefit which reasonably may be expected to accrue from the proposal must be balanced
against its reasonably foreseeable detriments. All factors which may be relevant to the proposal
will be considered, including the cumulative effects. Among those are conservation, economics,
aesthetics, general environmental concerns, wetlands, cultural values, fish and wildlife values,
flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion,
recreation, water supply and conservation, water quality, energy needs, safety, food and fiber
production and, in general, the needs and welfare of the people. Environmental and other
documents will be available for review in the St. Paul District Office.
The Corps of Engineers is soliciting comments from the public; Federal, State, and local
agencies and officials; Indian tribes; and other interested parties in order to consider and
evaluate the impacts of this proposed activity. Any comments received will be considered by
the Corps of Engineers to determine whether to issue, modify, condition, or deny a permit for
this proposal. To make this decision, comments are used to assess impacts on endangered
species, historic properties, water quality, general environmental effects, and the other public
interest factors listed above. Comments are used in the preparation of an Environmental
Page 3 of 4
Regulatory Branch (File No. 2018-00096-ANM)
Assessment and/or an Environmental Impact Statement pursuant to the National Environmental
Policy Act. Comments are also used to determine the need for a public hearing and to
determine the overall public interest of the proposed activity.
10. COASTAL ZONE MANAGEMENT
The Wisconsin Coastal Management Program (WCMP) in the Department of Administration is
inviting public comment regarding this project. The WCMP may conduct a Federal consistency
review to verify that the project will comply with State policies in Wisconsin's coastal zone.
Further information may be obtained from the Federal Consistency Coordinator at: Wisconsin
Coastal Management Program, P.O. Box 7868, Madison, WI 53707-7868; (608) 267-7982.
Any comments on whether or not this proposed project complies with the State enforceable
policies should be received within 30 days by the Federal Consistency Coordinator.
9.
REPLIES/COMMENTS
Interested parties are invited to submit to this office written facts, arguments, or objections within
30 days of the date of this notice. These statements should bear upon the suitability of the
location and the adequacy of the project and should, if appropriate, suggest any changes
believed to be desirable. Comments received may be forwarded to the applicant.
Replies may be addressed to:
U.S. Army Corps of Engineers
Attn: April Marcangeli
250 N. Sunnyslope Road, Suite 296
Brookfield, Wisconsin 53005
Or, IF YOU HAVE QUESTIONS ABOUT THE PROJECT, call April Marcangeli at the Brookfield
office of the Corps, telephone number 651-290-5731.
To receive Public Notices by e-mail, go to: http://mvp-extstp/list_server/ and add your
information in the New Registration Box.
Todd Vesperman
Chief, Southeast Section
Enclosures: MVP-2018-00096-ANM Figures 1 through 9
Page 4 of 4
MVP-2018-00096-ANM Figure 1 of 9
North Project Limit
ZZ
V
BB
W. Drexel Ave
W. Puetz Rd
41
94
100
241
W. Elm Rd
94
41
W. Oakwood Rd
Elm Road Study Area
V
Milwaukee County
Racine County
7 Mile Rd
41
94
7 Mile Rd
South Project Limit
7 Mile Road Study Area
Mainline Study Area
I S C O N S IN
E
PO
D E PA R TM
NT
U.S. Department of Transportation
R T AT I O N
W
OF TR
S
AN
Federal Highway
Administration
Exhibit 3
I-94 North-South Corridor (Racine and Milwaukee Counties) Study Area
Re-evaluation of Environmental Document Validity
SL0518171025MKE 3_I94NS_RK_RacineCty_StudyArea_v4 11.30.2017
I-94 North-South Corridor Racine and Milwaukee Counties
MVP-2018-00096-ANM Figure 2 of 9
Leg end
Completed
Re-e aluation Study Area
(No e er
)
North Project Limit
ZZ
BB
41
94
W. Drexel Ave
7
O akwood Road to
Colleg e A v enue
Construction ID's
1030-20-84 I-94 Mainline
W. Puetz Rd
W. Ryan Rd
Elm Road I nterchang e
Construction ID's
6
1030-20-87 Bridge and Ramps
W. Oakwood Rd
7 Mile Road to
County Line
3 Construction ID's
4 1035-01-82 I-94 Mainline N/S
1035-01-83 I-94 NB Mainline (N)
Milwaukee County
Racine County
7 Mile Road I nterchang e
Construction ID's
1 1 0 3 5 - 0 1 - 74 Mainline and Ramp s
2 1 0 3 5 - 0 1 - 72 C ros s road
7 Mile Rd
South Project Limit
I S C O N S IN
E
PO
D E PA R TM
NT
U.S. Department of Transportation
R T AT I O N
W
OF TR
S
AN
Federal Highway
Administration
Exhibit 4
I-94 North-South Corridor (Racine and Milwaukee Counties) Study Area
Re-evaluation of Environmental Document Validity
SL0518171025MKE 4_I94NS_RK_RacineCty_StudyArea_v5 11.30.2017
5
County Line to
O akwood Road
Construction ID's
1030-20-80 I-94 Mainline
I-94 North-South Corridor Racine and Milwaukee Counties
MVP-2018-00096-ANM Figure 3 of 9
41
94
7 Mile Road
¯
E
O F TRAN
500
1,000
Feet
U.S. Department of Transportation
R T AT I O N
D E PA R TM
NT
I S C O N S IN
PO
W
0
S
Federal Highway
Administration
Re-evaluation of Environmental Document Validity
SL0518171025MKE 4_I94NS_RK_RacineCty_StudyArea_v5 11.30.2017
Legend
Wetlands
Exhibit 5A
Design and Wetland Overview
I-94 North-South Corridor Racine and Milwaukee Counties
27th Street
MVP-2018-00096-ANM Figure 4 of 9
Milwaukee County
Racine County
41
7 1/2 Mile Road
94
¯
E
O F TRAN
500
1,000
Feet
U.S. Department of Transportation
R T AT I O N
D E PA R TM
NT
I S C O N S IN
PO
W
0
S
Federal Highway
Administration
Re-evaluation of Environmental Document Validity
SL0518171025MKE 4_I94NS_RK_RacineCty_StudyArea_v5 11.30.2017
Legend
Wetlands
Exhibit 5B
Design and Wetland Overview
I-94 North-South Corridor Racine and Milwaukee Counties
MVP-2018-00096-ANM Figure 5 of 9
27th Street
Oakwood Road
41
94
Elm Road
¯
E
O F TRAN
500
1,000
Feet
U.S. Department of Transportation
R T AT I O N
D E PA R TM
NT
I S C O N S IN
PO
W
0
S
Federal Highway
Administration
Re-evaluation of Environmental Document Validity
SL0518171025MKE 4_I94NS_RK_RacineCty_StudyArea_v5 11.30.2017
Legend
Wetlands
Exhibit 5C
Design and Wetland Overview
I-94 North-South Corridor Racine and Milwaukee Counties
MVP-2018-00096-ANM Figure 6 of 9
13th Street
Ryan Road
41
94
¯
E
O F TRAN
500
1,000
Feet
U.S. Department of Transportation
R T AT I O N
D E PA R TM
NT
I S C O N S IN
PO
W
0
S
Federal Highway
Administration
Re-evaluation of Environmental Document Validity
SL0518171025MKE 4_I94NS_RK_RacineCty_StudyArea_v5 11.30.2017
Legend
Wetlands
Exhibit 5D
Design and Wetland Overview
I-94 North-South Corridor Racine and Milwaukee Counties
MVP-2018-00096-ANM Figure 7 of 9
41
94
¯
E
O F TRAN
500
1,000
Feet
U.S. Department of Transportation
R T AT I O N
D E PA R TM
NT
I S C O N S IN
PO
W
0
13th Street
Puetz Road
S
Federal Highway
Administration
Re-evaluation of Environmental Document Validity
SL0518171025MKE 4_I94NS_RK_RacineCty_StudyArea_v5 11.30.2017
Legend
Wetlands
Exhibit 5E
Design and Wetland Overview
I-94 North-South Corridor Racine and Milwaukee Counties
MVP-2018-00096-ANM Figure 8 of 9
41
13th Street
94
Drexel Avenue
¯
E
O F TRAN
500
1,000
Feet
U.S. Department of Transportation
R T AT I O N
D E PA R TM
NT
I S C O N S IN
PO
W
0
S
Federal Highway
Administration
Re-evaluation of Environmental Document Validity
SL0518171025MKE 4_I94NS_RK_RacineCty_StudyArea_v5 11.30.2017
Legend
Wetlands
Exhibit 5F
Design and Wetland Overview
I-94 North-South Corridor Racine and Milwaukee Counties
13th Street
MVP-2018-00096-ANM Figure 9 of 9
41
94
Rawson Avenue
¯
E
O F TRAN
500
1,000
Feet
U.S. Department of Transportation
R T AT I O N
D E PA R TM
NT
I S C O N S IN
PO
W
0
S
Federal Highway
Administration
Re-evaluation of Environmental Document Validity
SL0518171025MKE 4_I94NS_RK_RacineCty_StudyArea_v5 11.30.2017
Legend
Wetlands
Exhibit 5G
Design and Wetland Overview
I-94 North-South Corridor Racine and Milwaukee Counties