PUBLIC NOTICE: The proposed project includes the expansion of I-94 to 8 lanes (one additional lane in each direction), reconstruction of the 7 Mile Road interchange, and new construction of an interchange at Elm Road.

PROJECT DESCRIPTION AND PURPOSE: The proposed project includes the expansion of I-94 to 8 lanes (one additional lane in each direction), reconstruction of the 7 Mile Road interchange, and new construction of an interchange at Elm Road. The project site is located along 7.5 miles of I-94 from the south end of the College Avenue interchange in Milwaukee County to the south end of the 7 Mile Road interchange in Racine County.

Public Notice APPLICANT:

Wisconsin Department of Transportation

REFER TO:

MVP-2018-00096-ANM

ISSUED: March 26, 2018 EXPIRES: April 26, 2018

SECTION: 404 - Clean Water Act

1. APPLICATION FOR PERMIT TO permanently discharge dredged and fill material in a total of 25.24 acres of waters of the U.S. associated with the reconstruction of the Interstate 94 (I-94) and 7 Mile Road interchange and the new construction of an interchange at Elm Road in the Village of Caledonia, Town of Raymond, and Cities of Oak Creek and Milwaukee in Racine and Milwaukee Counties. 2. SPECIFIC INFORMATION PROJECT LOCATION: The project site is located along 7.5 miles of I-94 from the south end of the College Avenue interchange in Milwaukee County to the south end of the 7 Mile Road interchange in Racine County. The project site is located in Sections 6, 7, Township 4 North, Range 22 East; Sections 1, 12, Township 4 North, Range 21 East; Sections 6, 7, 18, 19, 30, 31, Township 5 North, Range 22 East; and Section 6, Township 5 North, Range 22 East; Racine and Milwaukee Counties, Wisconsin. See the attached drawings MVP-2018-00096-ANM, Figures 1 to 9, for more information. DESCRIPTION OF PROJECT: The proposed project includes the expansion of I-94 to 8 lanes (one additional lane in each direction), reconstruction of the 7 Mile Road interchange, and new construction of an interchange at Elm Road. The 7 Mile Road interchange is being reconstructed as a tight diamond interchange and includes crossroad reconstruction. Throughout the project area, seven new culverts would be installed and three culverts would be replaced with concrete of similar diameter along I-94 and would connect to pipes already constructed on the frontage roads. The Federal Highway Administration (FHWA) is the lead federal agency for project review. Several environmental documents were previously completed for both the I-94 reconstruction and interchange and crossroads reconstruction. An I-94 Corridor Interchange Improvements Environmental Assessment (EA) was prepared in 1996 and re-evaluated in 2008 (ftp://ftp.dot.wi.gov/dtsd/hcci/projectdocuments/20171114036/Question%20%234/EA/eareevalall -070302.pdf), which addressed all of the interchanges and crossroads within the project area, including the 7 Mile Road interchange. The I-94 North-South Final Environmental Impact Statement (EIS) was prepared in 2008 and addressed the I-94 mainline segments within the project area (https://projects.511wi.gov/i94northsouth/wp-content/uploads/sites/105/feis.pdf). A re-evaluation of both documents applicable to this project was initiated in 2017. QUANTITY, TYPE, AND AREA OF FILL: The proposed project is currently estimated to result in the filling and permanent loss of approximately 24.46 acres of wetland. The impacted wetlands include 0.14 acre of wooded swamp, 0.36 acre of riparian forested, 0.99 acre of shrub scrub, 1.76 acre of riparian emergent, 6.76 acre of wet meadow, and 14.45 acres of shallow marsh. Approximately 0.78 acre of tributaries would be impacted by riprap and end walls. VEGETATION IN AFFECTED AREA: The wooded swamp wetland is dominated by common reed, narrow-leaf cattail, and red osier dogwood. The riparian forested wetland is dominated by

Regulatory Branch (File No. 2018-00096-ANM) calico aster, silver maple, phragmites, and reed canary grass. The shrub scrub wetland consists of green ash, sandbar willow, narrowleaf cattail, and reed canary grass. The vegetation in the riparian emergent wetland and wet meadow wetland is primarily invasive species, including phragmites, reed canary grass and narrow-leaf cattail. The shallow marsh wetland is dominated by seaside goldenrod, narrowleaf cattail, and phragmites. SOURCE OF FILL MATERIAL: Any off-site fill utilized for the project would come from an existing commercial source and would be free of any known contaminants. SURROUNDING LAND USE: Most of the land use adjoining I-94 in Milwaukee County is residential with some agricultural and commercial development throughout. The land use transitions to more agricultural fields in the southern part of the project located in Racine County. THE FOLLOWING POTENTIALLY TOXIC MATERIALS COULD BE USED AT THE PROJECT SITE: The project does not propose to use toxic materials, but fluid used in construction equipment may pose a slight risk. All equipment would be maintained and stored according to the Erosion Control Implementation Plan provided by the contractor. THE FOLLOWING PRECAUTIONS TO PROTECT WATER QUALITY HAVE BEEN DESCRIBED BY THE APPLICANT: The proposed project would be conducted in compliance with the state's erosion control and stormwater best management practices to prevent sediment from leaving the site during and after construction. MITIGATION: The applicant proposes to fulfill federal compensatory mitigation requirements by debiting 40.25 riparian emergent credits at the WisDOT Hope Marsh Phase II mitigation bank in Marquette County. 3. FEDERALLY-LISTED THREATENED OR ENDANGERED WILDLIFE OR PLANTS OR THEIR CRITICAL HABITAT None were identified by the applicant or are known to exist in the permit area. However, the proposed project is within the known or historic range of the following Federally-listed species: Northern Long-Eared Bat (Threatened)

Hibernates in caves and mines ­ swarming in surrounding wooded areas in autumn. Roosts and forages in upland forests during spring and summer.

The FHWA as the lead federal agency consulted with the U.S. Fish and Wildlife Service. Any additional comments received as a result of this notice concerning Federally-listed threatened or endangered species and their critical habitat will be considered in our final assessment of the project. 4. JURISDICTION This application is being reviewed in accordance with the practices for documenting Corps jurisdiction under Sections 9 & 10 of the Rivers and Harbors Act of 1899 and Section 404 of the Clean Water Act identified in Regulatory Guidance Letter 16-01.

Page 2 of 4

Regulatory Branch (File No. 2018-00096-ANM)

5. STATE SECTION 401 WATER QUALITY CERTIFICATION WATER QUALITY CERTIFICATION. This Public Notice has been sent to the Wisconsin Department of Natural Resources and is considered by the District Engineer to constitute valid notification to that agency for Section 401 water quality certification. A permit will not be granted until the Wisconsin Department of Natural Resources has issued or waived Section 401 certification. 6. HISTORICAL/ARCHAEOLOGICAL FHWA is the lead federal agency for project review pursuant to Section 106 of the National Historic Preservation Act. The 2017 re-evaluation of the EA and EIS included a field investigation and review of aerial images to determine whether there are any new structures eligible for the National Register of Historic Places (NRHP) that were not eligible in 2007 (during the re-evaluation of the 1996 EA) or in 2008 (EIS). In addition, a search of the Wisconsin Historic Preservation Database (WHPD) indicated that there are no newly recorded archaeological sites located within the project area. On July 10, 2017 (Racine County) and January 9, 2018 (Milwaukee County), the WisDOT Cultural Resources Team determined no new impacts to cultural resources were identified, therefore, no additional Section 106 coordination was needed with the State Historic Preservation Office (SHPO). 7.

PUBLIC HEARING REQUESTS

Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for public hearings shall state, in detail, the reasons for holding a public hearing. A request may be denied if substantive reasons for holding a hearing are not provided or if there is otherwise no valid interest to be served. 8. PUBLIC INTEREST REVIEW The decision whether to issue a permit will be based on an evaluation of the probable impact, including cumulative impacts, of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered, including the cumulative effects. Among those are conservation, economics, aesthetics, general environmental concerns, wetlands, cultural values, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production and, in general, the needs and welfare of the people. Environmental and other documents will be available for review in the St. Paul District Office. The Corps of Engineers is soliciting comments from the public; Federal, State, and local agencies and officials; Indian tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Page 3 of 4

Regulatory Branch (File No. 2018-00096-ANM) Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. 10. COASTAL ZONE MANAGEMENT The Wisconsin Coastal Management Program (WCMP) in the Department of Administration is inviting public comment regarding this project. The WCMP may conduct a Federal consistency review to verify that the project will comply with State policies in Wisconsin's coastal zone. Further information may be obtained from the Federal Consistency Coordinator at: Wisconsin Coastal Management Program, P.O. Box 7868, Madison, WI 53707-7868; (608) 267-7982. Any comments on whether or not this proposed project complies with the State enforceable policies should be received within 30 days by the Federal Consistency Coordinator. 9.

REPLIES/COMMENTS

Interested parties are invited to submit to this office written facts, arguments, or objections within 30 days of the date of this notice. These statements should bear upon the suitability of the location and the adequacy of the project and should, if appropriate, suggest any changes believed to be desirable. Comments received may be forwarded to the applicant.

Replies may be addressed to: U.S. Army Corps of Engineers Attn: April Marcangeli 250 N. Sunnyslope Road, Suite 296 Brookfield, Wisconsin 53005 Or, IF YOU HAVE QUESTIONS ABOUT THE PROJECT, call April Marcangeli at the Brookfield office of the Corps, telephone number 651-290-5731. To receive Public Notices by e-mail, go to: http://mvp-extstp/list_server/ and add your information in the New Registration Box.

Todd Vesperman Chief, Southeast Section

Enclosures: MVP-2018-00096-ANM Figures 1 through 9

Page 4 of 4

MVP-2018-00096-ANM Figure 1 of 9

North Project Limit

ZZ

V

BB

W. Drexel Ave

W. Puetz Rd

41 94

100

241

W. Elm Rd

94

41

W. Oakwood Rd

Elm Road Study Area

V

Milwaukee County Racine County

7 Mile Rd

41 94

7 Mile Rd

South Project Limit 7 Mile Road Study Area

Mainline Study Area I S C O N S IN

E

PO

D E PA R TM

NT

U.S. Department of Transportation R T AT I O N

W

OF TR

S AN

Federal Highway Administration

Exhibit 3 I-94 North-South Corridor (Racine and Milwaukee Counties) Study Area

Re-evaluation of Environmental Document Validity SL0518171025MKE 3_I94NS_RK_RacineCty_StudyArea_v4 11.30.2017

I-94 North-South Corridor ­ Racine and Milwaukee Counties

MVP-2018-00096-ANM Figure 2 of 9

Leg end Completed Re-e aluation Study Area (No e er )

North Project Limit ZZ

BB

41 94 W. Drexel Ave

7

O akwood Road to Colleg e A v enue Construction ID's 1030-20-84 I-94 Mainline

W. Puetz Rd

W. Ryan Rd

Elm Road I nterchang e Construction ID's 6 1030-20-87 Bridge and Ramps W. Oakwood Rd

7 Mile Road to County Line 3 Construction ID's 4 1035-01-82 I-94 Mainline N/S 1035-01-83 I-94 NB Mainline (N)

Milwaukee County Racine County

7 Mile Road I nterchang e Construction ID's 1 1 0 3 5 - 0 1 - 74 Mainline and Ramp s 2 1 0 3 5 - 0 1 - 72 C ros s road

7 Mile Rd

South Project Limit

I S C O N S IN

E

PO

D E PA R TM

NT

U.S. Department of Transportation R T AT I O N

W

OF TR

S AN

Federal Highway Administration

Exhibit 4 I-94 North-South Corridor (Racine and Milwaukee Counties) Study Area

Re-evaluation of Environmental Document Validity SL0518171025MKE 4_I94NS_RK_RacineCty_StudyArea_v5 11.30.2017

5

County Line to O akwood Road Construction ID's 1030-20-80 I-94 Mainline

I-94 North-South Corridor ­ Racine and Milwaukee Counties

MVP-2018-00096-ANM Figure 3 of 9

41 94

7 Mile Road

¯

E

O F TRAN

500

1,000

Feet U.S. Department of Transportation

R T AT I O N

D E PA R TM

NT

I S C O N S IN

PO

W

0

S

Federal Highway Administration

Re-evaluation of Environmental Document Validity SL0518171025MKE 4_I94NS_RK_RacineCty_StudyArea_v5 11.30.2017

Legend Wetlands

Exhibit 5A Design and Wetland Overview I-94 North-South Corridor ­ Racine and Milwaukee Counties

27th Street

MVP-2018-00096-ANM Figure 4 of 9

Milwaukee County

Racine County

41

7 1/2 Mile Road

94

¯

E

O F TRAN

500

1,000

Feet U.S. Department of Transportation

R T AT I O N

D E PA R TM

NT

I S C O N S IN

PO

W

0

S

Federal Highway Administration

Re-evaluation of Environmental Document Validity SL0518171025MKE 4_I94NS_RK_RacineCty_StudyArea_v5 11.30.2017

Legend Wetlands

Exhibit 5B Design and Wetland Overview I-94 North-South Corridor ­ Racine and Milwaukee Counties

MVP-2018-00096-ANM Figure 5 of 9

27th Street

Oakwood Road

41 94

Elm Road

¯

E

O F TRAN

500

1,000

Feet U.S. Department of Transportation

R T AT I O N

D E PA R TM

NT

I S C O N S IN

PO

W

0

S

Federal Highway Administration

Re-evaluation of Environmental Document Validity SL0518171025MKE 4_I94NS_RK_RacineCty_StudyArea_v5 11.30.2017

Legend Wetlands

Exhibit 5C Design and Wetland Overview I-94 North-South Corridor ­ Racine and Milwaukee Counties

MVP-2018-00096-ANM Figure 6 of 9

13th Street

Ryan Road

41 94

¯

E

O F TRAN

500

1,000

Feet U.S. Department of Transportation

R T AT I O N

D E PA R TM

NT

I S C O N S IN

PO

W

0

S

Federal Highway Administration

Re-evaluation of Environmental Document Validity SL0518171025MKE 4_I94NS_RK_RacineCty_StudyArea_v5 11.30.2017

Legend Wetlands

Exhibit 5D Design and Wetland Overview I-94 North-South Corridor ­ Racine and Milwaukee Counties

MVP-2018-00096-ANM Figure 7 of 9

41 94

¯

E

O F TRAN

500

1,000

Feet U.S. Department of Transportation

R T AT I O N

D E PA R TM

NT

I S C O N S IN

PO

W

0

13th Street

Puetz Road

S

Federal Highway Administration

Re-evaluation of Environmental Document Validity SL0518171025MKE 4_I94NS_RK_RacineCty_StudyArea_v5 11.30.2017

Legend Wetlands

Exhibit 5E Design and Wetland Overview I-94 North-South Corridor ­ Racine and Milwaukee Counties

MVP-2018-00096-ANM Figure 8 of 9

41

13th Street

94

Drexel Avenue

¯

E

O F TRAN

500

1,000

Feet U.S. Department of Transportation

R T AT I O N

D E PA R TM

NT

I S C O N S IN

PO

W

0

S

Federal Highway Administration

Re-evaluation of Environmental Document Validity SL0518171025MKE 4_I94NS_RK_RacineCty_StudyArea_v5 11.30.2017

Legend Wetlands

Exhibit 5F Design and Wetland Overview I-94 North-South Corridor ­ Racine and Milwaukee Counties

13th Street

MVP-2018-00096-ANM Figure 9 of 9

41 94

Rawson Avenue

¯

E

O F TRAN

500

1,000

Feet U.S. Department of Transportation

R T AT I O N

D E PA R TM

NT

I S C O N S IN

PO

W

0

S

Federal Highway Administration

Re-evaluation of Environmental Document Validity SL0518171025MKE 4_I94NS_RK_RacineCty_StudyArea_v5 11.30.2017

Legend Wetlands

Exhibit 5G Design and Wetland Overview I-94 North-South Corridor ­ Racine and Milwaukee Counties

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas