You can copy from here when filling out the rest of the page.
Proposal to develop an industrial facility including one warehouse facility, roadways, parking lots, and a stormwater detention facility. Located approximately 0.4 miles west of Mound Road and Hollywood Boulevard in Joliet, Will County, Illinois.
PUBLIC NOTICE
APPLICATION FOR PERMIT
U.S. Army
Corps of Engineers
Chicago District
Public Notice/Application Number: LRC-2016-00736
Comment Period BEGINS: Wednesday March 28, 2018
Comment Period Expires: Monday April 30, 2018
U.S. Army Corps of Engineers
Illinois Environmental Protection Agency
Applicant
Matt Marketti
P.T. Ferro Construction
700 South Rowell Avenue
Joliet, Illinois 60433
Proposed Action
Proposal to develop an industrial facility including one warehouse facility, roadways, parking lots, and a stormwater detention facility. A detailed description of this proposal is provided on page 2 of this notice.
Location of Proposed Action
The project is located approximately 0.4 miles west of Mound Road and Hollywood Boulevard in Joliet, Will County, Illinois (Section 26, Township 35 N, Range 9 E Latitude 41.486552692609, Longitude -88.1721621494597).
Interested parties are hereby notified that an application has been received for a Department of the Army permit for the activity described herein and as shown on the attached drawings. You are invited to provide your comments by April 30, 2018 on the proposed work, which will become part of the record and will be considered in the decision. A permit will be issued or denied under Section 404 Action of the Clean Water Act of 1972(33 U.S.C. 1344)
Written comments shall be mailed to:
U.S. Army Corps of Engineers
Chicago District, Regulatory Branch
Attn: LRC-2016-00736,
231 South LaSalle Street, Suite 1500
Chicago, Illinois 60604-1437
It should be noted that ALL comments received by this office (via hard copy or electronic) will only be accepted with the full name and address, and email address, if available of the individual commenting, and must be received by the close of the public notice period. Electronic comments may be sent to the project manager at stasi.f.brown@usace.army.mil.
Project Description
The project consists of developing a 21 acre site to include a distribution facility including vehicle parking, trucking parking, and all associated utilities and stormwater management features. The purpose of the project is to develop an under-utilized property for economic development.
Impacts to the property include placement of fill in a portion of a large, 9.5 acre wetland complex. The wetland is comprised mostly of low quality plants in the eastern portions where the proposed project is located, with higher quality areas in the southwestern portions, with an overall FQAI of 18.97 for native species and a Mean C of 4.05 for native species. Approximately 1.85 acres of fill will be placed in the wetland for the stormwater management facilities.
Avoidance & Minimization
The applicant has stated the following concerning avoidance and minimization of impacts to Waters of the United States: The basic development purpose is to construct a large-scale facility with all associated utilities and infrastructure required to furnish a distribution center that can provide shipping, docking, and storage services. The goal of this report is to demonstrate the limited capacity to explore complete avoidance and minimization of on-site water resources, while maintaining this basic development purpose.
Mitigation
The applicant has stated the following concerning compensatory mitigation for unavoidable impacts to Waters of the United States: The project proposes impact to 1.85 acres of waters of the U.S. (WOUS). Mitigation for this impact will be implemented via an off-site wetland mitigation project (see attached documents)
The Corps has not verified the adequacy of this mitigation proposal at this time and will make the final determination on whether the proposed mitigation is appropriate and practicable in accordance with 33 CFR Part 332.
Regulatory Authority
This proposed action will be reviewed according to the provisions of Section 404 of the Clean Water Act of 1972.
Jurisdiction
This application will be reviewed according to the provisions of Section 404 of the Clean Water Act of 1972 due to placement of fill within a wetland that has a direct connection to a Relatively Permanent Waterway (RPW) which flows to a Traditionally Navigable Waterway (TNW).
Evaluation Factors
The decision whether to issue a permit will be based on an evaluation of probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments.
All factors which may be relevant to the proposal will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the people. In addition, if the proposed activity involves the discharge of dredged or fill material into waters of the United States, the evaluation of the impact on the public interest will include application of Section 404(b)(1) guidelines (40 CFR 230) promulgated by the U.S. Environmental Protection Agency.
The Corps of Engineers is also soliciting comments from the public, Federal, state and local agencies, Indian tribes, and other interested parties in order to consider and evaluate the potential impacts of the proposed activity. Once this office completes a review of the comments received, it will be determined whether to issue, modify, condition, or deny a permit for this proposal.
To prepare this decision, comments are taken into consideration to assess impacts on the public interest factors listed above, as well as endangered species, historic properties, water quality, and general environmental effects. Comments will be used in the preparation of an Environmental Assessment and/or Environmental Impact Statement pursuant to the National Environmental Policy Act. A determination concerning the need for a public hearing will also be based on the comments received.
Preliminary Evaluation of Selected Factors
Water Quality:
The applicant has applied to the Illinois Environmental Protection Agency (IEPA) for water quality certification, or waiver thereof, for the proposed activity in accordance with Section 401 of the Clean Water Act. Certification or waiver indicates that the IEPA believes the activity will not violate applicable water quality standards. The review by the IEPA is conducted in accordance with the Illinois water quality standards under 35 Illinois Administrative Code Subtitle C by providing an antidegradation assessment, which includes an evaluation of alternatives to any proposed increase in pollutant loading that may result from this activity.
The "Fact Sheet" containing the antidegradation assessment for this proposed project may be found on the IEPA's web site, at www.epa.state.il.us/public-notices/. In the event that the IEPA is unable to publish the "Fact Sheet" corresponding to the timeframe of this Joint Public Notice, a separate public notice and "Fact Sheet" will be published by the IEPA at the web site identified above. You may also obtain a copy of the "Fact Sheet" by contacting the IEPA at the address or telephone number shown below.
Written comments concerning possible impacts to water quality should be addressed to the following agency, along with a copy of the comments provided to the Corps of Engineers:
Illinois Environmental Protection Agency
Bureau of Water
Watershed Management Section
1021 N. Grand Avenue East
P.O. Box 19276
Springfield, Illinois 62794-9276
If you have any questions please contact the IEPA at (217) 782-3362.
Department of Natural Resources:
The applicant may have to submit an application to the Illinois Department of Natural Resources, Office of Water Resources (IDNR-OWR) for a permit pursuant to the State of Illinois Rivers, Lakes and Streams Act (615 ILCS 5). Comments concerning the IDNR-OWR permit should be addressed to the following agency, along with a copy of the comments provided to the Corps of Engineers:
Illinois Department of Natural Resources
Office of Water Resources
2050 West Stearns Road
Bartlett, Illinois 60103
If you have any questions please contact the IDNR at (847) 608-3116.
Endangered and Threatened Species:
The Corps of Engineers has not determined that the proposed activity would not affect any federally-listed endangered or threatened species or critical habitat for any endangered or threatened species, pursuant to the Endangered Species Act of 1973, as amended (16 U.S.C. 1531 et seq.). Therefore, consultation with the U.S. Fish and Wildlife Service pursuant to Section 7 of the Endangered Species Act does not appear to be warranted at this time.
Historic Properties/Cultural Resources:
Preliminary review indicates that the proposed activity is not likely to adversely affect any historic property which is listed, or eligible for listing, on the National Register of Historic Places, however, the review is still pending upon additionally information.
Environmental Impact Statement
A preliminary determination has been made that an environmental impact statement is not required for the proposed work.
Public Hearing
Any person may request in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for public hearing shall state with particularity the reasons for holding a public hearing. A request for a hearing may be denied if substantive reasons for holding a hearing are not provided or if there is otherwise no valid interest to be served.
It should be noted that materials submitted as part of the permit application become part of the public record and are thus available to the general public under the procedures of the Freedom of Information Act (FOIA). Individuals may submit a written request to obtain materials under FOIA or make an appointment to view the project file at the Chicago District Corps of Engineers Office of Counsel.
Interested parties wishing to comment on the proposed activity must do so in writing no later than Monday April 30, 2018. It is presumed that all parties receiving this notice will wish to respond to this public notice; therefore, a lack of response will be interpreted as meaning that there is no objection to the project as described.
This public notice is not a paid advertisement and is for public information only. Issuance of this notice does not imply Corps of Engineers endorsement of the project as described.
If you have any questions, please contact Stasi Brown of my staff by telephone at (312) 846-5544, or email at stasi.f.brown@usace.army.mil. It should be noted that ALL comments received by this office (via hard copy or electronic) will only be accepted with the full name and address of the individual commenting. You can also visit our website at http://www.lrc.usace.army.mil/Missions/Regulatory.aspx for more information on our program.
FOR THE DISTRICT COMMANDER:
Original Signed
Diedra L. McLaurin
Team Lead, West Section
Regulatory Branch
NOTICE TO POSTMASTERS:
It is requested that this notice be conspicuously and continuously posted until April 30, 2018.
PUBLIC NOTICE
APPLICATION FOR PERMIT
U.S. ARMY
CORPS OF ENGINEERS
CHICAGO DISTRICT
PUBLIC NOTICE/APPLICATION NUMBER: LRC-2016-00736
COMMENT PERIOD BEGINS: Wednesday March 28, 2018
COMMENT PERIOD EXPIRES: Monday April 30, 2018
U.S. Army Corps of Engineers
Illinois Environmental Protection Agency
APPLICANT
Matt Marketti
P.T. Ferro Construction
700 South Rowell Avenue
Joliet, Illinois 60433
PROPOSED ACTION
Proposal to develop an industrial facility including one warehouse facility, roadways, parking
lots, and a stormwater detention facility. A detailed description of this proposal is provided on
page 2 of this notice.
LOCATION OF PROPOSED ACTION
The project is located approximately 0.4 miles west of Mound Road and Hollywood Boulevard
in Joliet, Will County, Illinois (Section 26, Township 35 N, Range 9 E Latitude
41.486552692609, Longitude -88.1721621494597).
Interested parties are hereby notified that an application has been received for a Department of
the Army permit for the activity described herein and as shown on the attached drawings. You
are invited to provide your comments by April 30, 2018 on the proposed work, which will
become part of the record and will be considered in the decision. A permit will be issued or
denied under Section 404 Action of the Clean Water Act of 1972(33 U.S.C. 1344)
-2Written comments shall be mailed to:
U.S. Army Corps of Engineers
Chicago District, Regulatory Branch
Attn: LRC-2016-00736,
231 South LaSalle Street, Suite 1500
Chicago, Illinois 60604-1437
It should be noted that ALL comments received by this office (via hard copy or electronic) will
only be accepted with the full name and address, and email address, if available of the individual
commenting, and must be received by the close of the public notice period. Electronic comments
may be sent to the project manager at stasi.f.brown@usace.army.mil.
PROJECT DESCRIPTION
The project consists of developing a 21 acre site to include a distribution facility including
vehicle parking, trucking parking, and all associated utilities and stormwater management
features. The purpose of the project is to develop an under-utilized property for economic
development.
Impacts to the property include placement of fill in a portion of a large, 9.5 acre wetland
complex. The wetland is comprised mostly of low quality plants in the eastern portions where the
proposed project is located, with higher quality areas in the southwestern portions, with an
overall FQAI of 18.97 for native species and a Mean C of 4.05 for native species. Approximately
1.85 acres of fill will be placed in the wetland for the stormwater management facilities.
AVOIDANCE & MINIMIZATION
The applicant has stated the following concerning avoidance and minimization of impacts to
Waters of the United States: The basic development purpose is to construct a large-scale facility
with all associated utilities and infrastructure required to furnish a distribution center that can
provide shipping, docking, and storage services. The goal of this report is to demonstrate the
limited capacity to explore complete avoidance and minimization of on-site water resources,
while maintaining this basic development purpose.
MITIGATION
The applicant has stated the following concerning compensatory mitigation for unavoidable
impacts to Waters of the United States: The project proposes impact to 1.85 acres of waters of
the U.S. (WOUS). Mitigation for this impact will be implemented via an off-site wetland
mitigation project (see attached documents)
The Corps has not verified the adequacy of this mitigation proposal at this time and will make
the final determination on whether the proposed mitigation is appropriate and practicable in
accordance with 33 CFR Part 332.
REGULATORY AUTHORITY
This proposed action will be reviewed according to the provisions of Section 404 of the Clean
Water Act of 1972.
-3JURISDICTION
This application will be reviewed according to the provisions of Section 404 of the Clean Water
Act of 1972 due to placement of fill within a wetland that has a direct connection to a Relatively
Permanent Waterway (RPW) which flows to a Traditionally Navigable Waterway (TNW).
EVALUATION FACTORS
The decision whether to issue a permit will be based on an evaluation of probable impact
including cumulative impacts of the proposed activity on the public interest. That decision will
reflect the national concern for both protection and utilization of important resources. The
benefit which reasonably may be expected to accrue from the proposal must be balanced against
its reasonably foreseeable detriments.
All factors which may be relevant to the proposal will be considered including the cumulative
effects thereof; among those are conservation, economics, aesthetics, general environmental
concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values,
land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation,
water quality, energy needs, safety, food and fiber production, mineral needs, considerations of
property ownership and, in general, the needs and welfare of the people. In addition, if the
proposed activity involves the discharge of dredged or fill material into waters of the United
States, the evaluation of the impact on the public interest will include application of Section
404(b)(1) guidelines (40 CFR 230) promulgated by the U.S. Environmental Protection Agency.
The Corps of Engineers is also soliciting comments from the public, Federal, state and local
agencies, Indian tribes, and other interested parties in order to consider and evaluate the potential
impacts of the proposed activity. Once this office completes a review of the comments received,
it will be determined whether to issue, modify, condition, or deny a permit for this proposal.
To prepare this decision, comments are taken into consideration to assess impacts on the public
interest factors listed above, as well as endangered species, historic properties, water quality, and
general environmental effects. Comments will be used in the preparation of an Environmental
Assessment and/or Environmental Impact Statement pursuant to the National Environmental
Policy Act. A determination concerning the need for a public hearing will also be based on the
comments received.
PRELIMINARY EVALUATION OF SELECTED FACTORS
WATER QUALITY:
The applicant has applied to the Illinois Environmental Protection Agency (IEPA) for water
quality certification, or waiver thereof, for the proposed activity in accordance with Section 401
of the Clean Water Act. Certification or waiver indicates that the IEPA believes the activity will
not violate applicable water quality standards. The review by the IEPA is conducted in
accordance with the Illinois water quality standards under 35 Illinois Administrative Code
Subtitle C by providing an antidegradation assessment, which includes an evaluation of
alternatives to any proposed increase in pollutant loading that may result from this activity.
-4The "Fact Sheet" containing the antidegradation assessment for this proposed project may be
found on the IEPA's web site, at www.epa.state.il.us/public-notices/. In the event that the IEPA
is unable to publish the "Fact Sheet" corresponding to the timeframe of this Joint Public Notice, a
separate public notice and "Fact Sheet" will be published by the IEPA at the web site identified
above. You may also obtain a copy of the "Fact Sheet" by contacting the IEPA at the address or
telephone number shown below.
Written comments concerning possible impacts to water quality should be addressed to the
following agency, along with a copy of the comments provided to the Corps of Engineers:
Illinois Environmental Protection Agency
Bureau of Water
Watershed Management Section
1021 N. Grand Avenue East
P.O. Box 19276
Springfield, Illinois 62794-9276
If you have any questions please contact the IEPA at (217) 782-3362.
DEPARTMENT OF NATURAL RESOURCES:
The applicant may have to submit an application to the Illinois Department of Natural Resources,
Office of Water Resources (IDNR-OWR) for a permit pursuant to the State of Illinois Rivers,
Lakes and Streams Act (615 ILCS 5). Comments concerning the IDNR-OWR permit should be
addressed to the following agency, along with a copy of the comments provided to the Corps of
Engineers:
Illinois Department of Natural Resources
Office of Water Resources
2050 West Stearns Road
Bartlett, Illinois 60103
If you have any questions please contact the IDNR at (847) 608-3116.
ENDANGERED AND THREATENED SPECIES:
The Corps of Engineers has not determined that the proposed activity would not affect any
federally-listed endangered or threatened species or critical habitat for any endangered or
threatened species, pursuant to the Endangered Species Act of 1973, as amended (16 U.S.C. 1531
et seq.). Therefore, consultation with the U.S. Fish and Wildlife Service pursuant to Section 7 of
the Endangered Species Act does not appear to be warranted at this time.
HISTORIC PROPERTIES/CULTURAL RESOURCES:
Preliminary review indicates that the proposed activity is not likely to adversely affect any
historic property which is listed, or eligible for listing, on the National Register of Historic
Places, however, the review is still pending upon additionally information.
-5ENVIRONMENTAL IMPACT STATEMENT
A preliminary determination has been made that an environmental impact statement is not
required for the proposed work.
PUBLIC HEARING
Any person may request in writing, within the comment period specified in this notice, that a
public hearing be held to consider this application. Requests for public hearing shall state with
particularity the reasons for holding a public hearing. A request for a hearing may be denied if
substantive reasons for holding a hearing are not provided or if there is otherwise no valid
interest to be served.
It should be noted that materials submitted as part of the permit application become part of the
public record and are thus available to the general public under the procedures of the Freedom of
Information Act (FOIA). Individuals may submit a written request to obtain materials under
FOIA or make an appointment to view the project file at the Chicago District Corps of Engineers
Office of Counsel.
Interested parties wishing to comment on the proposed activity must do so in writing no later
than Monday April 30, 2018. It is presumed that all parties receiving this notice will wish to
respond to this public notice; therefore, a lack of response will be interpreted as meaning that
there is no objection to the project as described.
This public notice is not a paid advertisement and is for public information only. Issuance of this
notice does not imply Corps of Engineers endorsement of the project as described.
If you have any questions, please contact Stasi Brown of my staff by telephone at (312) 8465544, or email at stasi.f.brown@usace.army.mil. It should be noted that ALL comments
received by this office (via hard copy or electronic) will only be accepted with the full name
and address of the individual commenting. You can also visit our website at
http://www.lrc.usace.army.mil/Missions/Regulatory.aspx for more information on our program.
FOR THE DISTRICT COMMANDER:
ORIGINAL SIGNED
Diedra L. McLaurin
Team Lead, West Section
Regulatory Branch
-6NOTICE TO POSTMASTERS:
It is requested that this notice be conspicuously and continuously posted until April 30, 2018.
MOUND ROAD
-2/,(7,/
LOCATION MAP
6RXUFH*RRJOH0DSV
6HFWLRQ6715(
/DWLWLXGH
/RQJLWXGH
LEGEND:
3URMHFW$UHD
P.T. Ferro Construction
700 Rowell Ave., Joliet, Il
NORTH
([KLELW$
MOUND ROAD
-2/,(7,/
NATIONAL
WETLANDS
INVENTORY MAP
3URYLGHGE\86)LVK
DQG:LOGOLIH6HUYLFH
:HVW&KLFDJR
4XDGUDQJOH
LEGEND:
3URMHFW$UHD
P.T. Ferro Construction
700 Rowell Ave., Joliet, Il
NORTH
([KLELW%
MOUND ROAD
-2/,(7,/
SOIL SURVEY MAP
3URYLGHGE\86
'HSDUWPHQWRI$JULFXOWXUH
1DWXUDO5HVRXUFHV
&RQVHUYDWLRQ6HUYLFH
:HE6RLO6XUYH\
LEGEND:
3URMHFW$UHD
+\GULF6RLO
3UHGRPLQDQWO\
+\GULF
3DUWLDOO\+\GULF
3UHGRPLQDQWO\
1RQK\GULF
1RQK\GULF
P.T. Ferro Construction
700 Rowell Ave., Joliet, Il
NORTH
([KLELW&
MOUND ROAD
-2/,(7,/
USGS
TOPOGRAPHIC
MAP
3URYLGHGE\86*6
7RSRJUDSKLF
-ROLHW,O
LEGEND:
3URMHFW$UHD
P.T. Ferro Construction
700 Rowell Ave., Joliet, Il
NORTH
([KLELW'
Higgins Creek
(ON*URYH9LOODJH,O
FLOOD
INSURANCE MAP
3URYLGHGE\)HGHUDO
(PHUJHQF\0DQDJHPHQW
$JHQF\
3DQHO1R&(
-ROLHW,/
(IIHFWLYH'DWH
LEGEND:
3URMHFW$UHD
P.T. Ferro Construction
700 Rowell Ave., Joliet, Il
NORTH
([KLELW(
MOUND ROAD
-2/,(7,/
AERIAL
PHOTOGRAPH
Howard St
3URYLGHGE\*RRJOH(DUWK
3KRWR'DWH
LEGEND:
3URMHFW$UHD
:HWODQG%RXQGDU\
2Q6LWH
$
%
(
&
Roppolo Ave
'
Richard Ln
6DPSOH3RLQWV
)
*
Jarvis Ave
Lee Ln
P.T. Ferro Construction
700 Rowell Ave., Joliet, Il
NORTH
([KLELW)
$*
LRC-2016-736
Individual Permit Submittal
Mound Road Development
PF1601
I: Mitigation Location Exhibit
I
127($ (5,$/3 +272* 5$3 +7$. (1)5201($ 50$ 3'$7(')(% 58$5<
)HHW
LQFK IHH W
Legend
in
Gu
:(7/$1'
re
e ve
2))6,7(:(7/$1'
Ln
:$7(562)7+(86
2A
r
re D
2B
nC
t
STUDY AREA
Frontage Rd
1A
¦
¨
§
55
1B
QW
PH
F
$UHDRI:HWODQG
DQ
QK
&UHDWLRQ
(
QG
WOD
H
I:
DR
H
U
$
Thomas Dillon Dr
rli
Me
Bramble Hill Rd
i no
Pell
sid e D
R iver
r
&RS\ULJKWQHDUPDS
& / , ( 1 7
GEOTECH, INC.
12
' $7 (
1 $7 8 5 ( 2 ) 5 ( 9 , 6 ,2 1
),/ (1 $0(
B $:'P [G
3$7+
3 ?*( 27(& +,1 &? ? B $:' P [G
&+. '
':1
NNR S LMD
'6 * 1
.( .
&+. '
7- .
6& $ / (
0 2' ( /
$5 & * ,6
3/ 27 ' $7 (
0R QG D\0D \
7, 7/ (
APPROXIMATE
WETLAND DELINEATION
& % % ( /
' $7 (
EXH 6
Y
LL
HO
W
80
D
S
T
UN
O
M
D
D
A
O
AD
IN
A
RO
RO
TA
R
TE
D
OO
TE
R
ES
D
N
U
O
M
W
D
OA
R
L
SUBJECT
SITE
C
D
N
LA
K
OC
CA
I
H
GO
D
PA
FI
CI
I
RA
AN
IS
575
R
C
0
57
LOCATION MAP
ING
NORTH
ILD
U
B
W T. ±
E
F
N .
ED 0 SQ78.00
S
O 80 5
OP 46, FE=
R
F
P
565
0
56
5
MO
UN
0
57
D
56
5
T
UR
CO
NATIVE AREA LEGEND
BMP PLAN
55
550
SCALE: 1"=500'
56
0
TIO
N
E
ET T.
D
D
.F
IZE 3 AC
L
A
NA
5
55
R
TU
A
RE
A
N
5
54
0
55
BMP PLAN
0
20 40
SCALE: 1"=40'
5
54
54
80
120
NORTH
5
PLANT COMMUNITY SECTION
NOT TO SCALE
R
Know what's below.
Call before you dig.
1
CLIENT
P.T. FERRO CONSTRUCTION CO.
700 ROWELL AVENUE
JOLIET, ILLINOIS 60433
"
"
CIVIL ENGINEER
SPECIFICATIONS
"
WILL COUNTY, ILLINOIS
"
MOUND ROAD PROPERTY
M, GINGERICH, GEREAUX & ASSOC.
25620 SOUTH GOUGER ROAD
MANHATTEN, ILLINOIS 60442
XREFS:
REVISIONS
DATE
PROJECT NO.
10.04.17
PF1601
DRAWN
GFB
CHECKED
ELR
PLOT CONFIG:
SHEET NO.
R
Know what's below.
Call before you dig.
2 OF 2