Dow Chemical Company dam extension oyster creek Brazoria River

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The public notice period has been extended until June 2, 2018.

The proposed Project would provide additional water storage capacity by constructing an off-channel (upland) reservoir and associated infrastructure located immediately north of the existing Harris Reservoir site.

Full Public Notice Project PlansEcological Baseline Mitigation Plans Alternative Analysis The public notice period has been extended until June 2, 2018. PROJECT DESCRIPTION: The proposed Project would provide additional water storage capacity by constructing an off-channel (upland) reservoir and associated infrastructure located immediately north of the existing Harris Reservoir site. The off-channel reservoir would include a 1,929-acre impoundment with a nominal storage capacity of 50,000 acre-feet, an intake and pump station to divert Dow’s existing surface water rights from the Brazos River, an outlet to Oyster Creek and an emergency spillway. The Project also includes floodplain enhancements in Oyster Creek, stream restoration and temporary construction staging and laydown areas.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas