Home

Galveston District

Run scraper

Park Board - City of Galveston west Seawall and west Island BU

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The applicant proposes to perform beach nourishment activities.

Full Public Notice Project Plans PROJECT DESCRIPTION: The applicant proposes to perform beach nourishment activities along approximately 81,454 linear feet of beachfront on Galveston Island, beginning at the western terminus of the Seawall and extending west to the eastern boundary of Galveston Island State Park (approximately 30,603 feet) then from the western edge of Jamaica Beach to the west end of the island (approximately 50,851 feet). Beach quality sand will be obtained from authorized local upland and submerged sand sources, as well as beneficial use of dredged beach quality sand from Federal projects. The project was initially authorized by the Corps on 20 November 2009 (formerly 13194) and allowed the Park Board to dredge to obtain 2,000,000 cubic yards of sand to re-nourish beaches along the Galveston shoreline from the terminal end of the Seawall to the eastern boundary of Galveston Island State Park.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas