You can copy from here when filling out the rest of the page.
This notice announces a prospectus has been submitted for the development of the Walnut Shade Stream Mitigation Bank pursuant to 33 CFR 332, Compensatory Mitigation for Losses of Aquatic Resources (Federal Register: April 10, 2008, effective June 9, 2008.
Public Notice No. 18-14
Nashville District
Application No. LRN-2018-00205
Date: April 4, 2018; Expires: May 4, 2018
Please address comments to: Nashville District Corps of Engineers
Regulatory Division
3701 Bell Road
Nashville, TN 37214-2660
SUBJECT: This notice announces a prospectus has been submitted for the development of the Walnut Shade Stream Mitigation Bank pursuant to 33 CFR 332, Compensatory Mitigation for Losses of Aquatic Resources (Federal Register: April 10, 2008, effective June 9, 2008.
BANK SPONSOR: Resource Environmental Solutions (RES), LLC
Attention: Mr. Aaron Speaks
1033 Demonbreun Street, Suite 300
Nashville, Tennessee 37203
LOCATION: The proposed stream mitigation bank encompasses 68.34 acres that is situated within five adjoining tracts comprising approximately 321 acres located two miles northeast of the Town of Red Boiling Springs in Macon County, Tennessee (Latitude N 36.552679, Longitude W
-85.821040). The proposed mitigation bank would incorporate approximately 4 miles (20,103 +/- linear feet) of intermittent and perennial stream channels along several unnamed tributaries to Little Salt Lick Creek, which is a major tributary to the Barren River.
PURPOSE: The Walnut Shade Stream Mitigation Bank is proposed to provide compensatory stream mitigation for permitted impacts within the primary service area of the Barren River Watershed (HUC 05110002), Cordell Hull Lake Watershed (HUC 05130106), Old Hickory Lake Watershed (HUC05130201),
and the Red River Watershed (HUC 05130206). The Bank’s proposed secondary service area includes the Cheatham Lake Watershed (HUC 05130202).
GENERAL INFORMATION: Mitigation banks are defined as a site, or suite of sites, where aquatic resources (e.g., wetlands, streams, riparian areas) are restored, established, enhanced, and/or preserved for the purpose of providing compensatory mitigation for impacts authorized by Department of the Army (DA) permits pursuant to Section 10 of the Rivers and Harbors Act of 1899 and/or Section 404 of the Clean Water Act. In general, units of restored, established, enhanced or preserved wetlands or streams are expressed as “credits” which may subsequently
be withdrawn to offset “debits” incurred at a permitted project site. In this way, a permit requirement to provide compensatory mitigation can be transferred to the mitigation bank sponsor. The operation and use of mitigation banks are governed by an approved mitigation banking instrument (MBI). The MBI is the legal document for the establishment, operation and the use of a mitigation bank. This bank is intended to be a private commercial bank. The
sponsor would be responsible for the successful development of the mitigation bank including monitoring and reporting requirements.
A group of federal and state regulatory and resource agency representatives known as theInteragency Review Team (IRT) would oversee the establishment and management of the bank. The IRT is chaired by the US Army Corps of Engineers, Nashville District (USACE). The primary role of the IRT is to facilitate the establishment of the mitigation bank through the development of a MBI. The IRT will review the prospectus, instrument, and other appropriate documents and provide comments to the USACE.
The approval for the use of the bank for specific projects is the decision of the USACE pursuant to Section 10 of the Rivers and Harbors Act of 1899 and/or Section 404 of the Clean Water Act and/or the Tennessee Department of Environmental Conservation (TDEC) pursuant to Section 401 of the CWA
and/or applicable state of Tennessee statute(s) and regulation(s). The USACE and TDEC provide no guarantee that any particular individual or general permit would be authorized in order to use the bank for compensation. The following is a summary of the prospectus for this project.
PROJECT DESCRIPTION: The existing streams are degraded due to channelization, extensive impoundment, channel modifications, and habitat alterations are present throughout the site. Prior land uses included unrestricted cattle access and agricultural/farming activities. The main stream within the proposed mitigation bank (STR-3) has been assessed by TDEC and is listed as Fully Supporting. None of the other unnamed tributaries within the project site have been assessed by TDEC. STR-3 drains into Little Salt Lick Creek approximately 0.85 miles (4,500 linear feet +/-) downstream (north) of the project site. The overall goal of the mitigation bank is to restore, to the greatest extent possible, the ecological function of the highly degraded aquatic resources within
the mitigation bank site. The proposed project would consist of the rehabilitation, re-establishment, enhancement, and riparian buffer planting of approximately 21,103 linear feet of unnamed tributaries to Little Salt Lick Creek utilizing natural channel design techniques to provide a functional lift capable of restoring natural channel hydrology, hydraulic, geomorphic, physiochemical, and biological characteristics. Project goals include: (1) Restoring floodplain connectivity, (2) Restoring natural channel geomorphology and improve water quality, (3) Improving bedform diversity, (4) Improving lateral stability, and (5) Improve riparian vegetation buffer width and protection. Of the 21,103 linear feet, 5,699 linear feet would be enhanced, 6,103 linear feet will be restored, and 9,301 linear feet will be re-established. Details are contained in
the Walnut Shade Stream Mitigation Bank Prospectus dated March 8, 2018. To view the prospectus please email Mark McIntosh: mark.g.mcintosh@usace.army.mil. Information in the prospectus would serve as the basis for establishing the stream mitigation banking instrument (MBI). The MBI would describe in detail the physical and legal characteristics of the bank and how the bank would be established and operated.
HISTORIC AND CULTURAL RESOURCES: A review of the Tennessee Historical Commission Web Service Database (accessed 01 March 2018) indicated one small single dwelling structure (MC-354) as occurring on the project site. The structure is listed as a plain/traditional, single family dwelling built circa 1910 with a dog trot and estimated log size of
8-10. This structure is no longer standing on the property. A search of the National Register returned no findings of historic properties currently listed on the National Register of Historic Places within the project area. A Phase I cultural/archaeological survey has not been conducted for the site. At this early stage in the regulatory process, no project design plans have been submitted; therefore, USACE cannot complete an effects determination for historic and cultural resources. The Corps invites responses to this public notice from American Indian Tribes or tribal governments; Federal, State, and local agencies; historical and archeological societies; and other parties likely to have knowledge of or concerns regarding historic properties and cultural significance at or near the project area. Upon submittal of the design plans, USACE would evaluate the design plans along with any substantive comments from this public notice to determine the potential of impacts to historic and cultural resources for Section 106 compliance. If the Corps
determines that consultation is required, the Corps would consult with the
Tennessee Historic Commission (SHPO) and American Indian Tribes in accordance with Section 106 of the National Historic Preservation Act, as appropriate.
ENDANGERED/THREATENED SPECIES REVIEW: A review of the United States Fish and Wildlife Service (USFWS) website, http://ecos.fws.gov/ipac identified the following federally-listed species that are known to or believed to occur in Macon County, Tennessee:
Species Nomenclature
Federal Status
Mammals
Gray bat (Myotis grisescens)
Endangered
Indiana Bat (Myotis sodalist)
Endangered
Northern Long-eared Bat (Myotis septentrionalis)
Threatened
A copy of this notice is being furnished to USFWS for their review. After receipt of any comments, the USACE will evaluate the potential effects to proposed and/or listed species and their designated critical habitat, and initiate consultation with the U.S. Fish & Wildlife Service, if required.
COMMENT PERIOD: Written statements received in this office within 30 days from the date of this notice will become a part of the record and will be considered in the determination. Any response to this notice should be directed to the Nashville District Corps of Engineers, Regulatory Division, Attention: Mr. Mark G. McIntosh at the above address or by email: mark.g.mcintosh@usace.army.mil.
\s\
Joshua W. Frost
Chief, Technical Services Branch
Regulatory Division
U.S. Army Corps of Engineers