Interested parties are hereby notified that an application has been received to modify a Department of the Army permit, NWW-2005-2100162, issued on 27 June 2006, for certain additional work in Waters of the United States, including wetlands, as described below:

PUBLIC NOTICE: APPLICATION FOR PERMIT

APPLICATION NO.: NWW-2005-2100162

WATERWAY: Spring Valley Creek, North Fork Spring Valley Creek

APPLICANT: Avimor Development Corps LLC

DATE ISSUED: 4 April, 2018

END DATE: 3 May, 2018

Interested parties are hereby notified that an application has been received to modify a Department of the Army permit, NWW-2005-2100162, issued on 27 June 2006, for certain additional work in Waters of the United States, including wetlands, as described below:

APPLICANT: Mr. Brad Pfannmuller, Avimor Develop Corps LLC

AGENT: Mr. Dan Ritcher, Avimor Develop Corps LLC

U.S. ARMY CORPS OF ENGINEERS PROJECT MANAGER: Mr. Christen Marve Griffith, Telephone (208) 433-4470, christen.m.griffith@usace.army.mil

PURPOSE: Discharge gravel and rock fill into Spring Valley Creek and North Fork Spring Valley Creek for the next phase of Avimor Planned Unit Development Project.

WATERWAY: The proposed projects are located in wetlands adjacent to Spring Valley Creek, and within the channel of North Fork Spring Valley Creek.

LOCATION: The proposed project would be located on Spring Valley Creek and North Fork Spring Valley Creek within Section 18, Township 5 North, Range 2 East, near latitude 43.7737º N and longitude –116.2639º W, and latitude 43.7919º N and longitude –116.2627º W in Ada County, near Eagle, Idaho.

DRIVING DIRECTIONS: From the intersection of State Highway 44 and 55 head north 8 miles to the Avimor Subdivision just after mile post 51.

AUTHORITY: This permit will be issued or denied under the authority of Section 404 of the Clean Water Act (33 U.S.C. 1344). A Department of the Army permit is required for the discharge of dredged or fill material into waters of the United States, including wetlands.

WORK: The proposed project would result in the discharge of approximately 3350 cubic yards of various fill material into 0.115 acres of palustrine scrub-shrub (PSS) wetlands adjacent to Spring Valley Creek and approximately 1,277 linear feet of North Fork Spring Valley Creek. The work will entail the following activities with a waters of the United States.

Discharge of 1,136 cubic yards of earthen fill and a rock gabion retention wall to support the development of a commercial lot (See drawing C3.0). This will result in the loss of 0.115 acres of PSS wetlands adjacent to Spring Valley Creek. This impact was previously authorized in the June 2006 permit, however the permit to perform the work has expired.

ADDITIONAL INFORMATION: A 0.34 acre pond adjacent to the North Fork Spring Valley Creek, will be excavated from uplands as an amenity to the subdivision. The pond will be excavated to physically connect to the stream. The pond would be shallow and have a maximum depth of five feet. In addition, uplands adjacent to the channel will be reconfigured to allow for riparian vegetation plantings and increased stability.

CONSTRUCTION PERIOD: Applicant proposes to start construction during summer 2018. The permit would authorize construction for a period of 3 years.

PROPOSED MITIGATION: The applicant proposes the following mitigation measures to avoid, minimize, and compensate for impacts to Waters of the United States from activities involving discharges of dredged or fill material. Impacts from the proposed project will result in the loss of 0.115 acres of palustrine scrub-shrub wetlands adjacent to Spring Valley Creek and approximately 152 linear feet of North Fork Spring Valley Creek.

The applicant had previously mitigated for the 0.115 acre impact for the development of the commercial lot in the 2006 permit action. This mitigation has met its success criteria and is considered compliant. No additional mitigation is proposed for the loss of wetlands associated with the development of the commercial lot.

The applicant proposes to minimize impacts to functions and conditions of the North Fork Spring Valley Creek associated with the road crossing by improving the overall reach. The existing condition is impaired due to historical agricultural practices and use by cattle, and the applicant proposes to improve the overall reach. The functions lost by the crossing will be compensated by the improvements to channel conditions and vegetation plantings upstream. No additional mitigation is proposed for impacts associated with North Fork Spring Valley Creek.

OTHER ENVIRONMENTAL DOCUMENTS AND DA PERMITS ISSUED TO APPLICANT: The original DA permit was issued on June 27, 2006.

WATER QUALITY CERTIFICATION: This notice will also serve as a Public Notice that the Idaho Department of Environmental Quality (IDEQ) is evaluating whether to certify that the discharge of dredge and/or fill material proposed for this project will not violate existing water quality standards. A Department of the Army permit will not be issued until water quality certification has been issued or waived by the IDEQ, as required by Section 401 of the Clean Water Act. If water quality certification is not issued, waived or denied within sixty (60) days of this public notice date, and an extension of this period is not requested by and granted to the IDEQ, certification will be considered waived. Additionally, within thirty (30) days of this Public Notice, any person may provide written comments to IDEQ as request in writing that IDEQ provide them notice of their preliminary 401 Certification decision. Comments concerning Water Quality Certification for this project should be mailed to: Idaho Department of Environmental Quality, Boise Regional Office, Boise, Idaho 83706.

AQUATIC RESOURCE DESCRIPTION: The proposed project will impact wetlands adjacent to Spring Valley Creek, and a segment of North Fork Spring Valley Creek. Spring Valley Creek is a tributary to Dry Creek, which is a tributary to the Boise River. Both locations are located east of Highway 55 within the Avimor Development footprint.

Spring Valley Creek is a perennial waterway with a drainage area upstream from the project area of approximately 17 square miles. Spring Valley Creek flows west into Avimor where it merges with the North Fork Spring Valley Creek, and flows south through the development. The channel within the project reach includes a riparian/wetland corridor that varies between 100 and 200 linear feet in width and is composed of palustrine forested (PFO) and scrub-shrub wetlands (PSS). The wetland area to be impacted consists of PSS wetlands dominated by coyote willow, stinging nettle, and Canada thistle, and is located on along the transition zone between the channel bottom and existing developed upland area.

North Fork Spring Creek is an intermittent stream that runs southwest across the property. The stream segment has been heavily impacted from historic agricultural use. Vegetation consists of scattered old growth willow trees with little to no understory, and has a high width to depth ratio from historic cattle encroachment. The stream segment to be impacted by the crossing and enhancement runs parallel to a farm road, and through the homestead site for approximately 1200 linear feet before entering an existing culvert crossing under Highway 55 to the west side of the Valley.

ANTICIPATED IMPACTS ON AQUATIC ENVIRONMENT: The project as proposed will result in the total loss of 152 linear feet of intermittent stream, and 0.115 acres of wetlands. An additional 1,125 linear feet of North Fork Spring Valley Creek is proposed to be enhanced through channel work, to include the inclusions of grade control structures, and vegetative plantings.

OTHER AUTHORIZATIONS: Proposed work would require a Section 401 Water Quality Certification from the Idaho Department of Environmental Quality.

CULTURAL RESOURCES: Coordination is currently being conducted with the office of the Idaho State Historic Preservation Officer to determine if this activity will affect a site that is listed on the National Register of Historic Places, or a site that may be eligible for listing on the Register. We are also coordinating with the appropriate Tribal entity or the Tribal Historic Preservation Offices for the Shoshone Paiute and the Shoshone Bannock Tribes, to determine if there are any tribal historic or cultural interests within the project area.

TRIBAL TREATY RIGHTS and INTERESTS: Federal agencies acknowledge the federal trust responsibility arising from treaties, statutes, executive orders and the historical relations between the United States and American Indian Tribes. The federal government has a unique trust relationship with federally recognized American Indian Tribes, including the Shoshone Paiute and the Shoshone Bannock Tribes. The Corps has a responsibility and obligation to consider and consult on potential effects to Tribal rights, uses and interests. The Corps further recognizes there may be a need for additional and on-going consultation.

ENDANGERED SPECIES: No listed threatened or endangered species or designated critical habitats are known to exist in the project area. Coordination is currently being conducted with the U.S. Fish and Wildlife Service (USFWS).

ESSENTIAL FISH HABITAT: The Magnuson-Stevens Fishery Conservation and Management Act, as amended by the Sustainable Fisheries Act of 1996, requires all Federal agencies to consult with the National Marine Fisheries Service on all actions or proposed actions, permitted, funded or undertaken by the agency that may adversely affect Essential Fish Habitat (EFH). No EFH species OR EFH species are known to use the project area, nor is there EFH within the watershed.

ENVIRONMENTAL IMPACT STATEMENT: Preliminary review indicates the proposed activities will not require preparation of an Environmental Impact Statement. Comments provided will be considered in preparation of an Environmental Assessment.

EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact, including cumulative impacts, of the proposed activity on the public interest. This decision will reflect the national concern for both protection and utilization of important resources. The benefit which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered, including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and in general, the needs and welfare of the people. In addition, our evaluation will include application of the EPA Guidelines (40 CFR 230) as required by Section 404(b) (1) of the Clean Water Act.

CONSIDERATION OF PUBLIC COMMENTS: The Corps of Engineers is soliciting comments from the general public; Federal, State and local agencies and officials, Tribal entities and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.

PUBLIC HEARING: Any person may request in writing, within the comment period specified in this notice, that a public hearing be held to consider this proposed activity. Requests for a public hearing shall state specific reasons for holding a public hearing. A request may be denied if substantive reasons for holding a hearing are not provided or if there is otherwise no valid interest to be served.

COMMENT & REVIEW PERIOD: Interested parties are invited to provide comments on the proposed activity, which will become a part of the record and will be considered in the final decision.

Please mail all comments to: U.S. Army Corps of Engineers Walla Walla District Christen Marve Griffith Boise Regulatory Office 720 Park Boulevard, Suite 245 Boise, Idaho 83712-7757 Christen.m.griffith@usace.army.mil

Comments should be received no later than the comment due date of May 3, 2018, as indicated on this notice, to receive consideration.

Kelly J. Urbanek Chief, Regulatory Division Walla Walla District

If interested parties wish to view plans, drawings, and/or maps associated with the proposed project and Public Notice, please email the Project Manager with your request.

Public Notice: U.S. Army Corps Of Engineers Walla Walla District 201 North Third Avenue Walla Walla, WA 99362-1876

Application for Permit APPLICATION NO.: NWW- 2005-2100162 WATERWAY: Spring Valley Creek, N. Fork Spring Valley Creek APPLICANT: Avimor Development Corps LLC. DATE ISSUED: 02 April, 2018

30-Day Notice

END DATE: 02 May, 2018

Interested parties are hereby notified that an application has been received to modify a Department of the Army permit, NWW-2005-2100162, issued on 27 June 2006, for certain additional work in Waters of the United States, including wetlands, as described below in the attached documents. APPLICANT: Mr. Brad Pfannmuller, Avimor Develop Corps LLC AGENT: Mr. Dan Ritcher, Avimor Develop Corps LLC U.S. ARMY CORPS OF ENGINEERS PROJECT MANAGER: Mr. Christen Marve Griffith, Telephone (208) 433-4470, christen.m.griffith@usace.army.mil PURPOSE: Discharge fill material for the expansion of a commercial lot adjacent to Spring Valley Creek. Discharge Fill material into North Fork Spring Valley Creek to construct a road crossing and improve the function and aesthetic properties of the upstream segment. WATERWAY: The proposed projects are located in wetlands adjacent to Spring Valley Creek, and within the channel of North Fork Spring Valley Creek. LOCATION: The proposed project would be located on Spring Valley Creek and North Fork Spring Valley Creek within Section 18, Township 5 North, Range 2 East, near latitude 43.7737º N and longitude ­116.2639º W, and latitude 43.7919º N and longitude ­116.2627º W in Ada County, near Eagle, Idaho.

CENWW-RD

April 02, 2018

Application Number: NWW-2005-2100162

DRIVING DIRECTIONS: From the intersection of State Highway 44 and 55 head north 8 miles to the Avimor Subdivision just after mile post 51. AUTHORITY: This permit will be issued or denied under the authority of Section 404 of the Clean Water Act (33 U.S.C. 1344). A Department of the Army permit is required for the discharge of dredged or fill material into waters of the United States, including wetlands. WORK: The proposed project would result in the discharge of approximately 3350 cubic yards of various fill material into 0.115 acres of palustrine scrub-shrub (PSS) wetlands adjacent to Spring Valley Creek and approximately 1,350 linear feet of North Fork Spring Valley Creek. The work will entail the following activities with a waters of the United States.

Discharge of 1,136 cubic yards of earthen fill and a rock gabion retention wall to support the development of a commercial lot. This will result in the loss of 0.115 acres of PSS wetlands adjacent to Spring Valley Creek. This impact was previously authorized in the initial permit, however the permit to perform the work has expired. Discharge of 1,945 cubic yards of various fill material to include a 36" diameter CMP culvert crossing of North Fork Spring Valley Creek approximately 152 feet in length. The upstream ends will include trash racks, riprap other related components. Discharge of approximately 280 cubic yards of rock, and other material within North Fork Spring Valley Creek to construct boulder weirs for grade control. Excavate 88 cubic yards from below the Ordinary High Water Mark of North Fork Spring Creek, to reshape the channel.

ADDITIONAL INFORMATION: A 0.34 acre pond adjacent to the North Fork Spring Creek, will be excavated from uplands as an amenity to the subdivision. The pond will be excavated to physically connect to the stream. In addition, uplands adjacent to the channel will be reconfigured to allow for riparian vegetation plantings and increased stability. CONSTRUCTION PERIOD: Applicant proposes to start construction during summer 2018. The permit would authorize construction for a period of 3 years.

-2-

CENWW-RD

April 02, 2018

Application Number: NWW-2005-2100162

PROPOSED MITIGATION: The applicant proposes the following mitigation measures to avoid, minimize, and compensate for impacts to Waters of the United States from activities involving discharges of dredged or fill material. Impacts from the proposed project will result in the loss of 0.115 acres of palustrine scrub-shrub wetlands, and approximately 152 linear feet of intermittent stream channel. The applicant has already mitigated for the impacts for the development of the commercial lot. The 0.115 acres were included in the previously submitted Compensatory Mitigation Plan. This plan has met its success criteria and is considered compliant. No additional mitigation is proposed for the loss of wetlands associated with the development of the commercial lot. The applicant proposes to minimize impacts to functions and conditions of the North Fork Spring Creek associated with the road crossing by improving the overall reach. The existing condition is impaired due to historical agricultural practices and use by cattle, and the applicant proposes to improve the overall reach. The functions lost by the crossing will be compensated by the improvements to channel conditions and vegetation plantings upstream. No additional mitigation is proposed for impacts associated with North Fork Spring Creek. OTHER ENVIRONMENTAL DOCUMENTS AND DA PERMITS ISSUED TO APPLICANT: The original DA permit was issued in June 2006. WATER QUALITY CERTIFICATION: This notice will also serve as a Public Notice that the Idaho Department of Environmental Quality (IDEQ) is evaluating whether to certify that the discharge of dredge and/or fill material proposed for this project will not violate existing water quality standards. A Department of the Army permit will not be issued until water quality certification has been issued or waived by the IDEQ, as required by Section 401 of the Clean Water Act. If water quality certification is not issued, waived or denied within sixty (60) days of this public notice date, and an extension of this period is not requested by and granted to the IDEQ, certification will be considered waived. Additionally, within thirty (30) days of this Public Notice, any person may provide written comments to IDEQ as request in writing that IDEQ provide them notice of their preliminary 401 Certification decision. Comments concerning Water Quality Certification for this project should be mailed to: Idaho Department of Environmental Quality, Boise Regional Office, Boise, Idaho 83706.

-3-

CENWW-RD

April 02, 2018

Application Number: NWW-2005-2100162

AQUATIC RESOURCE DESCRIPTION: The proposed project will impact wetlands adjacent to Spring Valley Creek, and a segment of North Fork Spring Valely Creek. Spring Valley Creek is a tributary to Dry Creek, which is a tributary to the Boise River. Both locations are located east of Highway 55 within the Avimor Development footprint. Spring Valley Creek is a perennial waterway with a drainage area upstream from the project area of approximately 17 square miles. Spring Valley Creek flows west into Avimor where it merges with the North Fork Spring Valley Creek, and flows south through the development. The channel within the project reach includes a riparian/wetland corridor that varies between 100 and 200 linear feet in width and is composed of palustrine forested (PFO) and scrub-shrub wetlands (PSS). The wetland area to be impacted consists of PSS wetlands dominated by coyote willow, stinging nettle, and Canada thistle, and is located on along the transition zone between the channel bottom and existing developed upland area. North Fork Spring Creek is an intermittent stream that runs southwest across the property. The stream segment has been heavily impacted from historic agricultural use. Vegetation consists of scattered old growth willow trees with little to no understory, and has a high width to depth ratio from historic cattle encroachment. The stream segment to be impacted by the crossing and enhancement runs parallel to a farm road, and through the homestead site for approximately 1200 linear feet before entering an existing culvert crossing under Highway 55 to the west side of the Valley. ANTICIPATED IMPACTS ON AQUATIC ENVIRONMENT: The project as proposed will result in the total loss of 152 linear feet of intermittent stream, and 0.115 acres of wetlands. An additional 1200 linear feet of intermittent stream are proposed to be enhanced through channel work, to include the inclusions of grade control structures, and vegetative plantings. OTHER AUTHORIZATIONS: N/A CULTURAL RESOURCES: Coordination is currently being conducted with the office of the Idaho State Historic Preservation Officer to determine if this activity will affect a site that is listed on the National Register of Historic Places, or a site that may be eligible for listing on the Register. We are also coordinating with the appropriate Tribal entity or the Tribal Historic Preservation Offices for the Shoshone Paiute and the Shoshone Bannock Tribes, to determine if there are any tribal historic or cultural interests within the project area.

-4-

CENWW-RD

April 02, 2018

Application Number: NWW-2005-2100162

TRIBAL TREATY RIGHTS and INTERESTS: Federal agencies acknowledge the federal trust responsibility arising from treaties, statutes, executive orders and the historical relations between the United States and American Indian Tribes. The federal government has a unique trust relationship with federally recognized American Indian Tribes, including the Shoshone Paiute and the Shoshone Bannock Tribes. The Corps has a responsibility and obligation to consider and consult on potential effects to Tribal rights, uses and interests. The Corps further recognizes there may be a need for additional and on-going consultation. ENDANGERED SPECIES: No listed threatened or endangered species or designated critical habitats are known to exist in the project area. Coordination is currently being conducted with the U.S. Fish and Wildlife Service (USFWS). ESSENTIAL FISH HABITAT: The Magnuson-Stevens Fishery Conservation and Management Act, as amended by the Sustainable Fisheries Act of 1996, requires all Federal agencies to consult with the National Marine Fisheries Service on all actions or proposed actions, permitted, funded or undertaken by the agency that may adversely affect Essential Fish Habitat (EFH). No EFH species OR EFH species are known to use the project area, nor is there EFH within the watershed. ENVIRONMENTAL IMPACT STATEMENT: Preliminary review indicates the proposed activities will not require preparation of an Environmental Impact Statement. Comments provided will be considered in preparation of an Environmental Assessment. EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact, including cumulative impacts, of the proposed activity on the public interest. This decision will reflect the national concern for both protection and utilization of important resources. The benefit which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered, including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and in general, the needs and welfare of the people. In addition, our evaluation will include application of the EPA Guidelines (40 CFR 230) as required by Section 404(b)(1) of the Clean Water Act.

-5-

CENWW-RD

April 02, 2018

Application Number: NWW-2005-2100162

CONSIDERATION OF PUBLIC COMMENTS: The Corps of Engineers is soliciting comments from the general public; Federal, State and local agencies and officials, Tribal entities and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. PUBLIC HEARING: Any person may request in writing, within the comment period specified in this notice, that a public hearing be held to consider this proposed activity. Requests for a public hearing shall state specific reasons for holding a public hearing. A request may be denied if substantive reasons for holding a hearing are not provided or if there is otherwise no valid interest to be served. COMMENT & REVIEW PERIOD: Interested parties are invited to provide comments on the proposed activity, which will become a part of the record and will be considered in the final decision. Please mail all comments to: U.S. Army Corps of Engineers Walla Walla District Christen Marve Griffith Boise Regulatory Office 720 Park Boulevard, Suite 245 Boise, Idaho 83712-7757 christen.m.griffith@usace.army.mil

-6-

CENWW-RD

April 02, 2018

Application Number: NWW-2005-2100162

Comments should be received no later than the comment due date of May 02, 2018, as indicated on this notice, to receive consideration.

Kelly J. Urbanek Chief, Regulatory Division Walla Walla District Enclosures: PN_NWW-2005-2100162_Application PN_NWW-2005-2100162_Drawings

Public Notice: https://nww.usace.afpims.mil/LinkClick.aspx?fileticket=CEOD27REbSA%3d&tabid=2615&portali d=28&mid=6047

Application: https://nww.usace.afpims.mil/LinkClick.aspx?fileticket=9Gl A5nG0Jg%3d&tabid=2615&portalid=28&mid=6047

Drawings: https://nww.usace.afpims.mil/LinkClick.aspx?fileticket=A2lS5MV_ n8%3d&tabid=2615&portalid=28&mid=6047

-7-

U.S. ARMY CORPS OF ENGINEERS

Form Approved OMB No. 0710-0003 Expires: 30-SEPTEMBER-2015

APPLICATION FOR DEPARTMENT OF THE ARMY PERMIT 33 CFR 325. The proponent agency is CECW-CO-R.

Public reporting for this collection of information is estimated to average 11 hours per response. including the time for reviewing instructions, searching existing data sources. gathering and maintaining the data needed. and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of the collection of information. including suggestions for reducing this burden, to Department of Defense. Washington HeadQuarters. Executive Services and Communications Directorate, Information Management Division and to the Office of Management and Budget, Paperwork Reduction Project (0710-0003). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if ii does not display a currently valid OMB control number. Please DO NOT RETURN your form to either of those addresses. Completed applications must be submitted to the District Engineer having jurisdiction over the location of the proposed activity. PRIVACY ACT STATEMENT Authorities: Rivers and Harbors Act. Section 10, 33 USC 403; Clean Water Act, Section 404, 33 USC 1344; Marine Protection, Research, and Sanctuaries Act, Section 103, 33 USC 1413; Regulatory Programs of the Corps of Engineers; Final Rule 33 CFR 320-332. Principal Purpose: Information provided on this form will be used in evaluating the application for a permit. Routine Uses: This information may be shared with the Department of Justice and other federal, state, and local government agencies. and the public and may be made available as part of a public notice as reQuired by Federal law. Submission of requested information is voluntary, however. if information is not provided the permit application cannot be evaluated nor can a permit be issued. One set of original drawings or good reproducible copies which show the location and character or the proposed activity must be attached to this application (see sample drawings and/or instructions) and be submitted to the District Engineer having jurisdiction over the location of the proposed activity. An application that is not completed in full will be returned . (ITEMS 1 THRU 4 TO BE FILLED BY THE CORPS) 1. APPLICATION NO.

2. FIELD OFFICE CODE

3. DATE RECEIVED

4 . DATE APPLICATION COMPLETE

RECEIVE@ '9EC 1. ·fl Wfi .... (ITEMS BELOW TO BE FILLED BY APPLICANT) 5. APPLICANT'S NAME First - Brad

8. AUTHORIZED AGENT'S NAME AND TITLE (agent is not reQuired) Middle - Robert

Last - Pfannmuller

First- Dan

Middle -

Last - Ritcher

Company - A vimor Development LLC

Company - Avimor Development LLC.

E-mail Address - bradp@ avimor.com

E-mail Address - D anr@ Avimor.com

6. APPLICANT'S ADDRESS: Address-

9. AGENT'S ADDRESS:

18454 N. McLeod Way

Address-

State - id

City- Boise

Zip-

83714 Country-US

7. APPLICANT'S PHONE NOs. w/AREA CODE a. Residence

b. Business

208.899. I 061

208.939.0343

18454 N. McLeod Way

City- Boise

State- ID

Zip -

83 714 Country - US

10. AGENTS PHONE NOs. w/AREA CODE c. Fax

a. Residence

b. Business

c. Fax

208.939.0343 STATEMENT OF AUTHORIZATION

11. I hereby authorize, Brad Pfannmuller to act in my behalf as my agent in the processing of this application and to furnish. upon reQuest. supplemental information in support of this permit apa : . A /

l 3. -1 B -LI

6-s1GNATURE OF APPLICANT

DATE

NAME, LOCATION, AND DESCRIPTION OF PROJECT OR ACTIVITY 12. PROJECT NAME OR TITLE (see instructions) Spring Creek Brewing

&

No. Fork of Spring Creek Crossing

13. NAME OF WATERBODY. IF KNOWN (if applicable)

14. PROJECT STREET ADDRESS (if applicable)

N. Fork of the Spring C reek

Address

15. LOCATION OF PROJECT Latitude: ·N

18651 No. Streams Edge Way State- ID

City - B oise

Longitude: ·W

Zip-

83714

16. OTHER LOCATION DESCRIPTIONS, IF KNOWN (see instructions) State Tax Parcel ID Section -

18

R0623562290 Township -

ENG FORM 4345, DEC 2014

Municipality Ada Co. Idaho SN

Range -

2E

PREVIOUS EDITIONS ARE OBSOLETE.

Page 1 of3

17. DIRECTIONS TO THE SITE

From the intersection of State Highway's (SH) 44 and 55 take SH-55 north 8 miles to the Avimor Subdivision just after mile post 51. The project area is on the north side of Avim or Road just past the entrance. See attached site map.

18. Nature of Activity (Description of project, include all features) Project# l consist of a 6,000 sf Restaurant with parking area. please attached construction drawings of the parking area and Gabion wall. Project# 2 consist of approximately 1,200' reconstruction and rehabilitation of the N Fork of Springs Creek. this project also includes installation of 100' of 36" roadway crossing over the creek. please see the attached proposed plan of the creek rehabilitation.

19. Project Purpose (Describe the reason or purpose of the project, see instructions) Project # 1 is the construction of a 6,000 sf Restaurant with parking area. please attached construction drawings of the parking area and Gabion wall. Project #2 is a 100' of 36" roadway crossing and more importantly the reconstruction and rehabilitation of the creek.

USE BLOCKS 20-23 IF DREDGED AND/OR FILL MATERIAL IS TO BE DISCHARGED

20. Reason(s) for Discharge NA

21. Type(s) of Material Being Discharged and the Amount of Each Type in Cubic Yards: Type Type Amount in Cubic Yards Amount in Cubic Yards

Type Amount in Cubic Yards

NA

MA

NA

22. Surface Area in Acres of Wetlands or Other Waters Filled (see instructions) Acres 0.115 palustrine scrubshrub or Linear Feet 1,200 LF of Stream reconstruction 23. Description of Avoidance, Minimization, and Compensation (see instructions) See attached mitigation report.

ENG FORM 4345, DEC 2014

Page 2 of3

24. Is Any Portion of the Work Already Complete? 0 Yes

[g!No

IF YES, DESCRIBE THE COMPLETED WORK

25. Addresses of Adjoining Property Owners. Lessees, Etc.. Whose Property Adjoins the Waterbody (if more than can be entered here. please attach a supplemental list). a. Address-

NA

City-

State

Zip

State

Zip -

State

Zip-

State-

Zip

State-

Zip

b. AddressCityc. AddressCity d. AddressCity e. AddressCity

26. List of Other Certificates or Approvals/Denials received from other Federal, State, or Local Agencies for Work Described in This Application. AGENCY

TYPE APPROVAL·

IDENTIFICATION NUMBER

DATE APPLIED

DATE APPROVED

DATE DENIED

*Would include but is not restricted to zoning, building, and flood plain permits

27. Application is hereby made for permit or permits to authorize the work described in this application. I certify that this information in this application is complete and accurate. I further certify that I possess the authority to undertake the work described herein or am acting as the duly authorized agent of the

"~'""',Q~

SIGNATUREfAPPUCANT

1i.-112 -t] DATE

~ ~{~ SIGNA REOFAGENT

12-1S-!1· DATE

The Application must be signed by the person w ho desires to undertake the proposed activity (applicant) or it may be signed by a duly authorized agent if the statement in block 11 has been filled out and signed.

18 U.S.C. Section 1001 provides that: Whoever, in any manner within the jurisdiction of any department or agency of the United States knowingly and w illfu lly falsifies, conceals, or covers up any trick, scheme, or disguises a material fact or makes any false , fictitious or fraudu lent statements or representations or makes or uses any false writing or document knowing same to contain any false . fictitious or fraudu lent statements or entry, shall be fined not more than $10,000 or imprisoned not more than five years or both. ENG FORM 4345, DEC 2014

Page 3 of3

BEFORE DIGGING, CALL DIGLINE AT 1-800-342-1585

N W

E S

1

2

PATH SECTION Scale: NOT TO SCALE

ASPHALT SECTION Scale: NOT TO SCALE

TRASH ENCLOSURE SLAB SECTION

3

Scale: NOT TO SCALE

Scale: NOT TO SCALE

EXTRUDED CURB W/ SIDEWALK Scale: NOT TO SCALE

EXTRUDED CURB Scale: NOT TO SCALE

R

IO NA L E N G G IS T E R

E

ED

IN

EE

S

T

O

R

Plans Are Accepted For Public Street Construction

SS

C

HA

A

A TE O F ID

H

A

6

FE

5

GABION WALL DETAIL

PRO

4

D S . K IN K E

L

C3.0

-

--------

..

\\ PROJECT SITE

<

U'l

z

0

U'l

2w t:

> UJ et:

SITE REFERENCE MAP NTS ci z

N

GRAVITY IRRIGATION ALIGNMENT A (STA. 2+76.62 TO 4+28.81)

j::: z

0· ·15"----"'30~~~~60_ _ _ _ 90

::::> 0

O

Plan Scale

u>... w I

SHEET NOTES

PIPE DIMENSION ARE MEASURED FROM CENTER MANHOLE TO MANHOLE

PROFILE SCALE HORIZ: 1" = 30' VERT: 1" = 3' I

_j_

...

3342

-

·

>

SEE SHEET C1 .1 GENERAL, IRRIGATION, AND ACHD NOTES.

6

B.

SEE PHASE 8 CONSTRUCTION PLAN SET SHEET C7 .1 FOR PRESSURE IRRIGATION DETAILS.

~u

C.

ALL FITTINGS AND VALVES SHALL BE THE SAME SIZE AS THE LARGEST DIAMETER PIPE COMING INTO THE FITTING OR VALVE.

<( (/')

D.

ALL ROAD-CROSSINGS SHALL BE SLIEEVED PER lYPICAL SLEEVED ROAD CROSSING DETAIL PHASE 8 CONSTRUCTION PLAN SET SHEET C7.1.

.......... 0

E.

THRUST OR ANCHOR BLOCKS ARE REQUIRED AT ALL CHANGES OF DIRECTIONS PER ISPWC STANDARD DRAWING SD-403.

8 <(<(

F.

PRESSURE IRRIGATION PIPE TO BE CLASS 200, SDR-21 PVC OR APPROVED EQUAL.

G.

INSTALL AIR RELIEASE VALVE(S) AND DRAIN VALVES PER DETAILS PHASE 8 CONSTRUCTION PLAN SET SHEET C7.1. COORDINATE LOCATIONS WITH PROJECT ENGINEER DURING CONSTRUCTION.

I I

.

I

- /?

1'

I

3339

-/~-

\

.

.

\

/(

I I

\

/

I / /

I

3336

I

I

3339 \.·;EXISTING . .. \ . . .

/

.,

/

3336

·rPINISHED GROUND

'~-

"' !'-.

. 11

. /

H.

_\.,_,,_,

: : I}

3333

GROl;JNQ

\

I ./

.

'

.

I

I\

.

\ . .\

....-:

.

I

I

3333

\ \

/

I I

-

I

3330

.

.

35" CMP \$2.19' of

@

\

.\

.

\ I

\.273

. i· I

I

/

. . r

\

I I I

I

~

_:

y

~

.

----~--

1.

- --"' .

o <(

_J

uo ~ <( I

0

u

(j)

INFALL. INV OUT ~ 3329.38' PROVIDE METAL END SECTION AND TRASH RACKS FOR PIPE END. INSTALL INLET PROTECTION APRON, RIP RAP OPTION, PER ACHD STORM WATER DESIGN MANUAL DETAIL

2.

. .

·-··

\

~

Oz

./

3330

1

I

3327

>

- ,/

w

u KEYNOTES

.

::::>

co 0

INSTALL IRRIGATION SERVICES PER DETAIL PHASE 8 CONSTRUCTION PLAN SET SHEET C7.1.

.

.

z

A.

3342

·

V)

2.

z

DRAWING STATUS:

CONNECTION TO EXISTING IRRIGATION PIPE. STA.: 2+76.62 INV.: 3327.45' CONTRACTOR TO VERIFY SIZE, ELEVATION AND LOCATION OF EXISTING IRRIGATION PIPE PRIOR TO INSTALLATION.

0

PRELIMINARY NOT FOR CONSTRUCTION

1--~~~~~~~c:::

...

3327

'\.®·

l

t;; z 0 u

....__~~~~~~~~~~~~~--!

..

'-12" WATER ·

3324

3324

c:::

ENGINEERING 0 ENGINEERS . SURVEYORS. PLANNERS

.

.

..

EXISTING GROU ND CENTERLINE ALONG PIPE · PIPE FINIS.HE.D GR bUND· CENTERLI E .ALONG . . - .

r

3321

"' "'"' "' ,..;

2+10

.,;

"'"'"'

2+40

...oO "'"' "'

2+70

tJ ::::>

,._ oO

"'"'"' 3+00

"' "'"'"' .,;

3+30

,._

·

·

·

<

3321

>

t

"'

"'"'"' ::l"'

3+60

... .,;"'

~ ;;;

~

C!

"' "'"' "'"'"'

::l "' "'"'

"'ci

~ 0

;;;

"'"' "'"'"'

~

"'"'"' "'

;;; ;;;

"'

9233 WEST STATE STREET BOISE, IDAHO 83714 PHONE (208) 639-6939 FAX {208) 639-6930

4+20

4+50

4+80

z

DESIGN BY:

AFN

~

AFN

"'"'

CHECKED BY:

JNP/KPM

DATE:

1-5-2018

PROJECT:

3+90

o

DRAWN BY:

;;;

5+10

17-183

SHEET NO.

cs.o

u. l

> c::: <(

z

~ _J

~

.___________________________________________________________________________________________________________________________________________________________________________________L___________JC:

55 w ay

Deciduous Canopy Trees (Large Type II and III) Key

St a

Botanical Name

Notes

BIGTOOTH MAPLE

Acer grandidentatum

Live plants or cutting in riparian zone

RIVER BIRCH

Betula nigra

Live plants, middle crossing, transitional zone

BLACK COTTONWOOD

Populus trichocarpa

Live cuttings in riparian zone. 15' spacing typical

WATER BIRCH

Betula occidentalis

Live plants or cuttings, riparian zone, 6' spacing

BLACK HAWTHORN

Crataegus douglasii

Live plants in transitional zone

SASKATOON SERVICEBERRY

Amelanchier alnifolia

Live plants in transitional zone

COYOTE WILLOW

Salix exigua

Live cuttings in riparian zone

Cornus sericea

Live cuttings or plants in transitional to riparian zones, 6' spacing

Common Name

Future Regional Path

te

H ig h

McLe od W ay (6)

B

Boulder Weirs (approx 18" height)

Pedestrian Crossing At Existing Farm Culvert Crossing.

Ornamental Trees (Small, Class I)

D

C

E

15,000 sf., elev. 3336

A

Large Deciduous Shrubs

D'

C'

E'

B' Fill areas (blue). See cross sections A-E

Total Stream Length Shown = 1125 l.f. (Pond Length Included). Follows Existing Alignment.

Medium Deciduous Shrubs Cut areas (red). See cross sections A-E

RED OSIER DOGWOOD

Conceptual Site Plan

Scale: 1" = 100' @ 11x17 Sheet Size

MOCK ORANGE

Philadelphus lewisii

Live plants in transitional

GOLDEN CURRENT or WOODS ROSE

Ribes aureum OR Rosa woodsii

live plants transistional to riparian

55

Riparian Edge Seed Mix (see plan view). Seed at 3lbs/1000sf Juncus articulatus

hw ay

JOINTED RUSH

at

e

H ig

McLe od W ay

St

C 2018 T-O ENGINEERS. THIS INSTRUMENT IS THE PROPERTY OF T-O ENGINEERS. ANY REPRODUCTION, REUSE OR MODIFICATION OF THIS INSTRUMENT OR ITS CONTENTS WITHOUT SPECIFIC WRITTEN PERMISSION OF T-O ENGINEERS IS ST

Point of Ending - crossing at existing farm culvert crossing.

Floodplain

A'

H:\180044\3_Acaddwg\Model\180044-LS-180226.dwg, 3/7/2018 8:42:11 AM, Parks, Shon, AutoCAD PDF (General Documentation).pc3

AVIMOR RIPARIAN LANDSCAPE SCHEDULE Point of Beginning - State Hwy 55 Culvert Headwall

Proposed Pond 15,000 sf., elev. 3336

BALTIC RUSH

Juncus blaticus

SPIKE SEDGE

Eleocharis rostellata

GREAT BASIN WILDRYE

Elymus cinereus

HARDSTEM BULRUSH

Scirpus acutus

CHAIRMAKERS BULRUSH

Scirpus americanus

MONKEY FLOWER

Mimulus guttatus

COMMON HORSETAIL

Equisetum arvense

SAND DROPSEED

Sporobolus cryptandrus

FALSE SOLOMON'S SEAL

Smilacina stellata

Transitional Plant Mix (see plan view)

Existing Cottonwood Trees to remain (approximately 5 to be removed with grading).

Conceptual Planting Plan GENERAL NOTES: 1. These plans are conceptual and are not intended for construction. 2. See detail sheet for cross sections and embankment details. 3. Topography shown is from 2017 LiDAR.

4. Seed rates and P.L.S. rates to be determined at the time of construction documents. 5. Plant locations are conceptual but represent desired natural clustering of riparian native trees and shrubs.

6. Observed high water line is approximately 6"- 9" above the existing stream bed; however the stream bed is significantly varied in width and embankment conditions.

LEWIS BLUE FLAX

Linum lewisii

PENSTEMON VAR.

Penstemon spp.

SHEEP FESCUE and/or TALL FESCUE

Festuca ovina L. and / or F. arundinacea

YARROW

Achillea spp.

Sod

Scale: 1" = 100' @ 11x17 Sheet Size

PROJECT SUMMARY AND CALCULATIONS Total length of stream restoration work 1,125 linear feet including pond section. Centerline of this work largely follows existing stream bed alignment and extents of project are 20 ft each side of centerline. Lake - 1750 c.y. cut at average depth of 2.7' and total depth of 5' Lower Section (from Lake to first crossing) 40cy fill @ 0.6'ave depth and 20 cy cut @ 0.3' ave depth Upper section (from first crossing to end (second crossing)) - 190 cy fill @ 0.6' ave. depth and 70 cy cut @ 0.4'ave depth 18" high boulder weirs are located 150 ft. -175 ft. along the stream length to increase volume and reduce flow. Existing cottonwood trees will largely be preserved and protected however several trees (5-6) may need to be removed in pond excavation or in areas needing more than 18" of fill.

Avimor Community North Fork of Spring Creek at North Village Center PRELIMINARY ONLY - NOT FOR CONSTRUCTION

2471 S. TITANIUM PLACE MERIDIAN, IDAHO 83642-6703 PHONE: (208) 323-2288 E-FILE: 180044-LS-180226.DWG

FAX: (208) 323-2399 JOB: 180044

H:\180044\3_Acaddwg\Model\180044-LS-180226.dwg, 3-7-2018 8:41:59 AM, AutoCAD PDF (General Documentation).pc3 DATE:03/07/18

Project Limits

Project Limits

3334'

1 3

3333'

Pond elev. 3336

3335'

e ad Gr ed os p rade o Pr xisting G E

H.W.

3334'

shelf for aquatics elev. 3335

3337' 3336' 3335'

1

Existing Grade Average Water line

3337' 3336'

1

5

3333'

3333'

3332

3331'

3334'

POND SECTION

3332'

3332

3335'

3

3334'

3333' 3332'

1

3331'

5 Proposed Grade

Vertical Scale: 2x Horizontal Scale: 1" = 10'

3339'

Project Limits

Project Limits

A-A' Section

C L Proposed Grade

3338' 3

3337'

ade

Existing Gr

H.W.

3339' 3338'

1

3337' 3336'

3336'

Vertical Scale: 2x Horizontal Scale: 1" = 20'

B-B' Section

Transitional Plant Mix. Fescue sod over-seeded with other transitional plants (per schedule)

Toe-in trench for Straw Mat, entire length, backfill with sand, 12"w x 12"d min. Top of Bank

C-C' Section

Shrubs and trees per planting plan Riparian Plant Mix. Live cuttings, seeding and/or plants in straw mat.

Vertical Scale: 2x Horizontal Scale: 1" = 10'

Live stake cutting, 21" - 1 21" diameter by 30" long, 4' o.c. spacing. Use tree and shrub species on plant schedule. Wattle (coconut or similar fiber rolls)

30"

Stream-side native boulders (place per plan view)

C L

Proposed Grade Existing Grade

3343'

11'

Baseflow

7'-6"

3343'

1 3

3342'

O.H.W.

Project Limits

Project Limits

CENTERLINE

3342'

SECTION VIEW

H.W.

3341'

3341'

3340'

3340'

1'-4"

3'

N. Fork Spring Creek Streambed channel average 3ft wide but varies 30"downstream of constructed rock weirs to 42" upstream of weirs.

Vertical Scale: 2x Horizontal Scale: 1" = 10'

D-D' Section

Existing stream channel (varies). New channel is to follow the alignment of existing. To be excavated approx 3" and for placement of 3" river aggregates-cobbles.

Embankment Detail Not to Scale Project Limits

Project Limits

C 2018 T-O ENGINEERS. THIS INSTRUMENT IS THE PROPERTY OF T-O ENGINEERS. ANY REPRODUCTION, REUSE OR MODIFICATION OF THIS INSTRUMENT OR ITS CONTENTS WITHOUT SPECIFIC WRITTEN PERMISSION OF T-O ENGINEERS IS ST

H:\180044\3_Acaddwg\Model\180044-LS-180226.dwg, 3/7/2018 8:42:45 AM, Parks, Shon, AutoCAD PDF (General Documentation).pc3

3335'

C L

3350'

Avimor Community

3349'

North Fork Spring Creek at North Village Center

3348'

3348'

PRELIMINARY ONLY - NOT FOR CONSTRUCTION

3347'

3347'

CL

3350' 1

3349'

E-E' Section

3 H.W.

e

ad

op Pr

ed os

Gr

Existing Grade

Vertical Scale: 2x Horizontal Scale: 1" = 10'

2471 S. TITANIUM PLACE MERIDIAN, IDAHO 83642-6703 PHONE: (208) 323-2288 E-FILE: 180044-LS-180226.DWG

FAX: (208) 323-2399 JOB: 18004

H:\180044\3_Acaddwg\Model\180044-LS-180226.dwg, 3-7-2018 8:42:27 AM, AutoCAD PDF (General Documentation).pc3 DATE:03/05/18

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas