Home

St. Louis District

Run scraper

STATE OF MISSOURI - ISSUANCE OF REGIONAL GENERAL PERMIT (GP) 41 FOR DISASTER RECOVERY AND REPAIR ACTIVITIES. The U.S. Army Corps of Engineers

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

STATE OF MISSOURI - ISSUANCE OF REGIONAL GENERAL PERMIT (GP) 41 FOR DISASTER RECOVERY AND REPAIR ACTIVITIES. The U.S. Army Corps of Engineers, St. Louis District, HAS ISSUED GP-41 for the protection and the repair of existing damaged structures, damaged land areas, and damaged fills that were previously authorized by a Department of the Army (DA) permit. GP-41 is issued under the authority of Section 10 of the Rivers and Harbors Act of 1899 (33 USC 403) and/or Section 404 of the Clean Water Act (33 USC 1344). The GP-41 authorizes disaster recovery and repair activities within the St. Louis District’s regulatory boundary within the State of Missouri, provided that the project proponent, contractor, etc. complies with all general, special and water quality certification conditions included in GP-41. DURATION OF THE GENERAL PERMIT: The GP-41 shall be issued on April 22, 2018 and is in effect on for a period of five (5) years until April 22, 2023 unless it is specifically modified, suspended, or revoked prior to the expiration date.

STATE OF MISSOURI - ISSUANCE OF REGIONAL GENERAL PERMIT (GP) 41 FOR DISASTER RECOVERY AND REPAIR ACTIVITIES. The U.S. Army Corps of Engineers, St. Louis District, HAS ISSUED GP-41 for the protection and the repair of existing damaged structures, damaged land areas, and damaged fills that were previously authorized by a Department of the Army (DA) permit. GP-41 is issued under the authority of Section 10 of the Rivers and Harbors Act of 1899 (33 USC 403) and/or Section 404 of the Clean Water Act (33 USC 1344). The GP-41 authorizes disaster recovery and repair activities within the St. Louis District’s regulatory boundary within the State of Missouri, provided that the project proponent, contractor, etc. complies with all general, special and water quality certification conditions included in GP-41. DURATION OF THE GENERAL PERMIT: The GP-41 shall be issued on April 22, 2018 and is in effect on for a period of five (5) years until April 22, 2023 unless it is specifically modified, suspended, or revoked prior to the expiration date.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas