You can copy from here when filling out the rest of the page.
Final 2017 Nationwide Permit Regional Conditions for Navajo Nation Lands in the State of Arizona
On January 6, 2017, the U.S. Army Corps of Engineers (Corps) published the notice in the Federal Register announcing the reissuance of all 50 existing nationwide permits (NWPs), general conditions, and definitions with some modifications. The Corps also issued two new NWPs, one new general condition, and five new definitions. The 2017 NWPs went into effect on March 19, 2017, and will expire on March 18, 2022. On March 22, 2017, the Los Angeles District has finalized Regional Conditions for the 2017 Nationwide Permits (NWPs) for the District boundaries of California and Arizona.
SPECIAL PUBLIC NOTICE
_________________________________________________________________________________________
U.S. ARMY CORPS OF ENGINEERS
LOS ANGELES DISTRICT
BUILDING STRONG®
FINAL 2017 NATIONWIDE PERMIT
REGIONAL CONDITIONS FOR NAVAJO NATION LANDS
IN THE STATE OF ARIZONA
April 6, 2018
On January 6, 2017, the U.S. Army Corps of Engineers (Corps) published the notice in the
Federal Register announcing the reissuance of all 50 existing nationwide permits (NWPs), general
conditions, and definitions with some modifications. The Corps also issued two new NWPs, one new
general condition, and five new definitions. The 2017 NWPs went into effect on March 19, 2017, and
will expire on March 18, 2022. On March 22, 2017, the Los Angeles District has finalized Regional
Conditions for the 2017 Nationwide Permits (NWPs) for the District boundaries of California and
Arizona.
In June 2013 the Corps' Albuquerque District was designated the lead district within the Corps
South Pacific Division region for coordination of Corps regulatory program issues within the boundary
of the Navajo Nation. The goal of this designation is to bring consistency to the regulatory program
within the Navajo Nation and to simplify and increase the efficiency of program implementation. Lead
District designation only applies to management of regulatory consistency and each district is
responsible for regulatory program execution within its area of responsibility. One of the primary
activities undertaken is the ongoing consolidation of regional conditions of the three Corps districts
whose area of responsibility includes Navajo Nation lands (Albuquerque District within New Mexico,
Sacramento District within Utah, and Los Angeles District within Arizona). The consolidation will
assist Navajo Nation agencies that must comply with the regulatory program and the Nation's water
quality program which provides water quality certification for permitted activities. These consolidated
regional conditions were adopted within Albuquerque District on March 22, 2017. Following approval
by the South Pacific Division, the Los Angeles District has finalized and adopted the Regional
Conditions within Navajo Nation lands in Arizona, which are consistent with those adopted by the
Albuquerque District. The Final Los Angeles District Nationwide Permit (NWP) Regional Conditions
for Navajo Nation Lands is attached to this public notice.
When combined with the terms and conditions of the Nationwide Permits, the final Regional
Conditions for Navajo Nation Lands were designed to ensure no more than minor impacts occur to
waters of the U.S. The final Regional Conditions for Navajo Nation lands take effect on April 6, 2018
and will run through the term of the current NWP Program (to March 18, 2022).
Additional information regarding the 2017 NWPs, including the Los Angeles District's current
regional conditions and other information related to the NWP Program are available at our website:
http://www.spl.usace.army.mil/Missions/Regulatory/Permit-Process/
For additional information please call Antal Szijj of my staff at (805) 585-2147 or via e-mail at
antal.j.szijj@usace.army.mil. This public notice is issued by the Chief, Regulatory Division.
Regulatory Program Goals:
· To provide strong protection of the nation's aquatic environment, including wetlands.
· To ensure the Corps provides the regulated public with fair and reasonable decisions.
· To enhance the efficiency of the Corps' administration of its regulatory program.
__________________________________________________________
DEPARTMENT OF THE ARMY
LOS ANGELES DISTRICT, U.S. ARMY CORPS OF ENGINEERS
WWW.SPL.USACE.ARMY.MIL/MISSIONS/REGULATORY
2
Final 2017 Nationwide Permit Regional Conditions for Navajo Nation Lands within the Los
Angeles District
NN 1. Pre-Construction Notification (PCN) for Dredge and Fill Activities in Intermittent and
Perennial Streams, Special Aquatic Sites, and Springs.
Notification to the District Engineer in accordance with General Condition 32 is required for all
proposed activities in intermittent and perennial streams, special aquatic sites (including wetlands,
riffle and pool complexes, and sanctuaries and refuges), and discharges of dredged or fill material
within 100 feet of the point of groundwater discharge of natural springs. A spring source is defined
as any location where ground water emanates from a point in the ground and has a defined surface
water connection to another water of the United States. For purposes of this regional condition,
springs do not include seeps or other discharges which lack a defined surface water connection.
NN 2. Suitable Fill
Use of broken concrete as fill or bank stabilization material is prohibited unless the applicant
demonstrates that its use is the only practicable material (with respect to cost, existing technology,
and logistics). Any applicant who wishes to use broken concrete as bank stabilization must provide
notification to the District Engineer in accordance with General Condition 32 (Pre-Construction
Notification) along with justification for such use. Use of broken concrete with rebar or used tires
(loose or formed into bales) is prohibited in all waters of the United States.
NN 3. Channelization
General Condition 9 for Management of Water Flows is amended to add the following: Projects
that would result in permanent channelization to previously un-channelized streams require PCN to
the District Engineer in accordance with General Condition 32.