Home

Omaha District

Run scraper

Lyman Richey Corporation - Lyman Richey Corporation proposes a new sand and gravel mining plant (Plant 52). Mining activities started in 2017 in upland areas. The proposed project would occur in six phases over 30 years and result in the discharge of fill material into waters of the United States

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

Lyman Richey Corporation - Lyman Richey Corporation proposes a new sand and gravel mining plant (Plant 52). Mining activities started in 2017 in upland areas. The proposed project would occur in six phases over 30 years and result in the discharge of fill material into waters of the United States, including wetlands. Impacts are divided into each phase of the project and are listed below. Phase 1—Years one to five—A total of 1.64 acres of PEMA/C riverine floodplain wetlands will be impacted by Phase 1. Phase 2—Years six to ten—A total of 24.14 acres of PEMA/C riverine floodplain wetlands will be impacted by Phase 2. Phase 3—Years eleven to fifteen—A total of 6.63 acres of PEMA/C riverine floodplain wetland will be impacted by Phase 3. Phase 4—Years sixteen to twenty—A total of 7.39 acres of PEMA/C riverine floodplain wetlands and 3,810 linear feet of an unnamed tributary to Western Sarpy Ditch will be impacted by Phase 4. Phase 5—Years twenty-one to twenty-five—A total of 9.21 acres of PEMA/C riverine floodplain wetlands will be impacted by Phase 5. Phase 6—Years twenty-six to thirty—A total of 0.26 acres of PEMA/C riverine floodplain wetlands and 1,080 linear feet of an unnamed tributary to Western Sarpy Ditch will be impacted by Phase 6. If a permit decision is made to authorize, the permit would be evaluated every 5 years in order to address any changes to the project, which may include but is not limited to, impacts, mitigation, endangered species, or jurisdiction.

Lyman Richey Corporation - Lyman Richey Corporation proposes a new sand and gravel mining plant (Plant 52). Mining activities started in 2017 in upland areas. The proposed project would occur in six phases over 30 years and result in the discharge of fill material into waters of the United States, including wetlands. Impacts are divided into each phase of the project and are listed below. Phase 1—Years one to five—A total of 1.64 acres of PEMA/C riverine floodplain wetlands will be impacted by Phase 1. Phase 2—Years six to ten—A total of 24.14 acres of PEMA/C riverine floodplain wetlands will be impacted by Phase 2. Phase 3—Years eleven to fifteen—A total of 6.63 acres of PEMA/C riverine floodplain wetland will be impacted by Phase 3. Phase 4—Years sixteen to twenty—A total of 7.39 acres of PEMA/C riverine floodplain wetlands and 3,810 linear feet of an unnamed tributary to Western Sarpy Ditch will be impacted by Phase 4. Phase 5—Years twenty-one to twenty-five—A total of 9.21 acres of PEMA/C riverine floodplain wetlands will be impacted by Phase 5. Phase 6—Years twenty-six to thirty—A total of 0.26 acres of PEMA/C riverine floodplain wetlands and 1,080 linear feet of an unnamed tributary to Western Sarpy Ditch will be impacted by Phase 6. If a permit decision is made to authorize, the permit would be evaluated every 5 years in order to address any changes to the project, which may include but is not limited to, impacts, mitigation, endangered species, or jurisdiction.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas