PUBLIC NOTICE: The proposed project consists of removing the Monterey Dam and spillways, removing appurtenant structures (Mill Race culvert, gate, and vinyl sheet pile), restoring the Rock River shoreline with heavy riprap and natural materials, constructing a storm water pond, and installing various amenities such as kayak launches, limestone steps, woody fish habitat, and a concrete fishing deck.
PROJECT DESCRIPTION AND PURPOSE: The proposed project consists of removing the Monterey Dam and spillways, removing appurtenant structures (Mill Race culvert, gate, and vinyl sheet pile), restoring the Rock River shoreline with heavy riprap and natural materials, constructing a storm water pond, and installing various amenities such as kayak launches, limestone steps, woody fish habitat, and a concrete fishing deck.
Public Notice
APPLICANT:
City of Janesville
c/o Mike Payne
REFER TO:
MVP-2011-02255-RAN
ISSUED: April 6, 2018
EXPIRES: May 6, 2018
SECTION:404 - Clean Water Act
SECTION:10 - Rivers and Harbors Act
1. APPLICATION FOR PERMIT TO discharge fill material into approximately 18.61 acres of
the Rock River and adjacent wetland for the removal of the Monterey Dam (in response to a
directive by the Wisconsin Department of Natural Resources) and associated river restoration.
2. SPECIFIC INFORMATION
AGENT:
Inter-Fluve, Inc.
c/o Bart Chapman
8446 Excelsior Drive
Madison, WI 53717
PROJECT LOCATION: The project site is located in Section 02, Township 02 North, Range
12 East, Rock County Wisconsin. The approximate coordinates are Latitude: 42.670073
Longitude: -89.029045.
DESCRIPTION OF PROJECT: The proposed project consists of removing the Monterey
Dam and spillways, removing appurtenant structures (Mill Race culvert, gate, and vinyl
sheet pile), restoring the Rock River shoreline with heavy riprap and natural materials,
constructing a storm water pond, and installing various amenities such as kayak launches,
limestone steps, woody fish habitat, and a concrete fishing deck. The project also includes
seeding approximately 25 acres and planting approximately 250 trees and shrubs. See the
enclosed figures labeled MVP-2011-02255-RAN Pages 1-13 for an overview of the project
plans. A complete plan set is available upon request.
To minimize suspension and transport of sediment upstream of the dam, the proposed
drawdown would occur over several days with a target of a 6-inch reduction in water surface
in the impoundment per day. As proposed, it is not expected that a large quantity of
sediment would be mobile following the dam removal.
All portions of the dam and appurtenant structures would be removed to an elevation of at
least 2 feet below the stream bed and no disturbance to the Center Avenue Bridge would
occur.
QUANTITY, TYPE, AND AREA OF FILL: Overall the project involves the permanent
discharge of fill material into approximately 18.61 acres of the Rock River and adjacent
wetland. The project also involves the temporary discharge of fill material into 0.16 acre of
the Rock River for construction access. See the table below for a breakdown of the
proposed impacts.
Regulatory Branch (File No. MVP-2011-02255-RAN)
Plan
PROPOSED IMPACT
sheet(s)
not included Access Route for drawdown
Acres
Square Feet
Temporary or Permanent Impact
Fill
0.06
2500
Temporary
Option 1 (Bulk Bag)
Option 2 (Sheet Piling)
0.1
0.03
4362
1090
Temporary
Temporary
0.4
2276
2140
1699
N/A
17516
not included Dewatering Barrier
11
River Bank and Stabilization Structure
riprap
Log Jam
Fabric Encapsulated Soil Lifts (FES Lifts)
back fill material
Total fill
10, 11, 34, 35 Right Riverbank and Mill Race (downstream), includes wetland area
Cut/Fill (total area of disturbance)
not included Right Riverbank (upstream)
Stone Toe
Compacted Soil
Outlet Protection
Total fill
10, 24
Angler Access (6 total)
Limestone slab
FES Lifts
Total fill
16
Large Wood Cribs (2 total)
Total fill
24
Boulder Habitat (50 boulders total)
Total fill
N/A
Temporary storm sewer outlet protection apron
Total Fill
17, 34, 36 Storm Pond/Monterey Bay Proposed Pond
cut/fill (total area of disturbance)
11, 24
Canoe/Kayak Launch
Total fill
Permanent
Temporary (highest amount)
3
includes all materials
Permanent
Permanent
0.84
13542
22506
480
36528
Permanent
0.04
960
768
1728
Permanent
0.06
2500
Permanent
0.01
628
Permanent
0
1400 NO LONGER PART of the PROJECT
14.2
0.05
Permanent
2400
Permanent
18.6
0.16
VEGETATION IN AFFECTED AREA: The Mill Race downstream area consists of wetland
dominated by reed canary grass and cattail.
SOURCE OF FILL MATERIAL: A portion of the fill material would consist of concrete taken
from on-site structures that are proposed to be removed. Any off-site fill material utilized for
the project would come from an existing commercial source and would be free of any known
contaminants.
SURROUNDING LAND USE: Land use surrounding the project area consists of mixed use:
recreation, business, and residential.
DESCRIPTION OF EXCAVATION: Excavation would occur within the river and wetland
area during removal of the dam, appurtenant structures, and Mill Race and during the
proposed bank stabilization and pond construction activities.
Page 2 of 5
Regulatory Branch (File No. MVP-2011-02255-RAN)
THE FOLLOWING POTENTIALLY TOXIC MATERIALS COULD BE USED AT THE
PROJECT SITE: The project does not propose to use toxic materials, but fluid used in
construction equipment may pose a slight risk. All equipment would be maintained and
stored according to the Erosion Control Implementation Plan provided by the contractor.
THE FOLLOWING PRECAUTIONS TO PROTECT WATER QUALITY HAVE BEEN
DESCRIBED BY THE APPLICANT: The proposed project would be conducted in
compliance with the State's erosion control and stormwater best management practices to
prevent sediment from leaving the site during and after construction.
MITIGATION: No compensatory mitigation is being proposed at this time.
3. FEDERALLY-LISTED THREATENED OR ENDANGERED WILDLIFE OR PLANTS OR
THEIR CRITICAL HABITAT
None were identified by the applicant. However, the proposed project is within the known or
historic range of the following Federally-listed species:
Northern Long-Eared Bat (Threatened)
Hibernates in caves and mines swarming
in surrounding wooded areas in autumn.
Roosts and forages in upland forests
during spring and summer.
Whooping Crane (Experimental population)
Open wetlands and lakeshores.
Eastern Massasauga (Threatened)
Open to forested wetlands and adjacent
uplands.
Rusty Patched Bumble Bee (Endangered)
Grasslands with flowering plants from April
through October, underground and
abandoned rodent cavities or clumps of
grasses above ground as nesting sites,
and undisturbed soil for hibernating
queens to overwinter.
Eastern Prairie Fringed Orchid (Threatened)
Wet grasslands.
Prairie Bush-clover (Threatened)
Dry to mesic prairies with gravelly soil.
This application is being coordinated with the U.S. Fish and Wildlife Service. Any comments it
may have concerning Federally-listed threatened or endangered wildlife or plants or their critical
habitat will be considered in our final assessment of the described work.
4. JURISDICTION
This application is being reviewed in accordance with the practices for documenting Corps
jurisdiction under Sections 9 & 10 of the Rivers and Harbors Act of 1899 and Section 404 of the
Clean Water Act identified in Regulatory Guidance Letter 16-01.
Page 3 of 5
Regulatory Branch (File No. MVP-2011-02255-RAN)
5. STATE SECTION 401 WATER QUALITY CERTIFICATION
WATER QUALITY CERTIFICATION. This Public Notice has been sent to the Wisconsin
Department of Natural Resources and is considered by the District Engineer to constitute valid
notification to that agency for Section 401 water quality certification. A permit will not be granted
until the Wisconsin Department of Natural Resources has issued or waived Section 401
certification.
6. HISTORICAL/ARCHAEOLOGICAL
This public notice is being sent to the National Park Service and the State Archaeologist for their
comments. The Corps will review information on known cultural resources and/or historic
properties within and adjacent to the project area. The Corps will also consider the potential
effects of the project on any properties that have yet to be identified. The results of this review
and the Corps' determination of effect will be coordinated with the State Historic Preservation
Officer independent of this public notice. Any adverse effects on historic properties will be
resolved prior to the Corps authorization, or approval, of the work in connection with this project.
7.
PUBLIC HEARING REQUESTS
Any person may request, in writing, within the comment period specified in this notice, that a
public hearing be held to consider this application. Requests for public hearings shall state, in
detail, the reasons for holding a public hearing. A request may be denied if substantive reasons
for holding a hearing are not provided or if there is otherwise no valid interest to be served.
8. PUBLIC INTEREST REVIEW
The decision whether to issue a permit will be based on an evaluation of the probable impact,
including cumulative impacts, of the proposed activity on the public interest. That decision will
reflect the national concern for both protection and utilization of important resources. The
benefit which reasonably may be expected to accrue from the proposal must be balanced
against its reasonably foreseeable detriments. All factors which may be relevant to the proposal
will be considered, including the cumulative effects. Among those are conservation, economics,
aesthetics, general environmental concerns, wetlands, cultural values, fish and wildlife values,
flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion,
recreation, water supply and conservation, water quality, energy needs, safety, food and fiber
production and, in general, the needs and welfare of the people. Environmental and other
documents will be available for review in the St. Paul District Office.
The Corps of Engineers is soliciting comments from the public; Federal, State, and local
agencies and officials; Indian tribes; and other interested parties in order to consider and
evaluate the impacts of this proposed activity. Any comments received will be considered by
the Corps of Engineers to determine whether to issue, modify, condition, or deny a permit for
this proposal. To make this decision, comments are used to assess impacts on endangered
species, historic properties, water quality, general environmental effects, and the other public
interest factors listed above. Comments are used in the preparation of an Environmental
Assessment and/or an Environmental Impact Statement pursuant to the National Environmental
Policy Act. Comments are also used to determine the need for a public hearing and to
determine the overall public interest of the proposed activity.
Page 4 of 5
Regulatory Branch (File No. MVP-2011-02255-RAN)
9.
REPLIES/COMMENTS
Interested parties are invited to submit to this office written facts, arguments, or objections within
30 days of the date of this notice. These statements should bear upon the suitability of the
location and the adequacy of the project and should, if appropriate, suggest any changes
believed to be desirable. Comments received may be forwarded to the applicant.
Replies may be addressed to:
U.S. Army Corps of Engineers
Attn: Rachel Nuetzel
250 N. Sunnyslope Road, Suite 296
Brookfield, Wisconsin 53005
Or, IF YOU HAVE QUESTIONS ABOUT THE PROJECT, call Rachel Nuetzel at the Brookfield
office of the Corps, telephone number 651-290-5729.
To receive Public Notices by e-mail, go to: http://mvp-extstp/list_server/ and add your
information in the New Registration Box.
Rebecca Graser
Acting Chief, Southeast Section
Enclosures: Figures labeled MVP-2011-02255-RAN Pages 1-13
Page 5 of 5
MONTEREY DAM REMOVAL & RIVER RESTORATION
CITY OF JANESVILLE, JANESVILLE, WI
FINAL DESIGN, February 13, 2018
W COURT ST
PROJECT
LOCATION
E RACINE ST
MONTEREY DAM
ROCK RIVER
LOCATION MAP - WISCONSIN
NOT TO SCALE
CENTER AVE
OW
FL
E
A
26
MILWAUKEE ST
21
A
LOCATION MAP
SCALE 1" = 2000'
SHEET INDEX
ROCK RIVER
W COURT ST
11
E RACINE ST
MONTEREY
DAM
G
11
IFI_Monterey_Dam_Restoration.dwg - 2/13/2018
VICINITY MAP
NOT TO SCALE
1
NO.
02/13/2018 OHW & ALIGNMENT ADDED.
DATE
REVISION DESCRIPTION
DF, CP, BL BW, BC, MM, BL BC, MM, JK
DRAWN
DESIGNED
CHECKED
BC
2/13/18
15-04-13
APPROVED
DATE
PROJECT
11
1 - COVER, DRAWING LIST, AND LOCATION MAPS
2 - GENERAL NOTES AND ABBREVIATIONS
3 - SITE PLAN - ACCESS AND EROSION & SEDIMENTATION CONTROL
4 - EXISTING CONDITIONS
5 - EXISTING CONDITIONS CROSS SECTIONS
6 - DEMOLITION SITE PLAN
7 - PROPOSED CONDITIONS OVERVIEW AND SHEET INDEX
8 - PROPOSED CONDITIONS
9 - PROPOSED CONDITIONS
10 - WETLAND PARK DOWNSTREAM PLAN
11 - WETLAND PARK UPSTREAM PLAN
12 - WETLAND PARK GRADING CROSS SECTIONS
13 - WETLAND PARK GRADING CROSS SECTIONS
14 - WETLAND PARK TYPICAL SECTIONS
15 - BOULDER HABITAT ENHANCEMENT
16 - UPSTREAM BANK TREATMENT
17 - MONTEREY BAY PROPOSED POND
18 - POND OUTLET
19 - POND GRADING CROSS SECTIONS
MONTEREY DAM REMOVAL & RIVER RESTORATION
CITY OF JANESVILLE
JANESVILLE, WI
MVP-2011-02255-RAN Page 1 of 13
20 - POND GRADING CROSS SECTIONS
21 - CONCRETE REVETMENT REMOVAL PLAN
22 - CONCRETE REVETMENT REMOVAL PLAN
23 - CONCRETE REVETMENT REMOVAL GRADING SECTIONS
24 - UPSTREAM BOULDER HABITAT AND PARK AMENITIES
25 - DOWNSTREAM STORM SEWER OUTFALL PROTECTION
26 - ANGLER ACCESS DETAILS
27 - CONCRETE PLATFORM DETAILS
28 - LARGE WOOD HABITAT TYPICAL DETAILS
29 - LOG CABLE CONNECTION DETAILS
30 - BOULDER HABITAT TYPICAL DETAILS
31 - EMERGENCY POND OVERFLOW DETAILS
32 - FABRIC DETAILS
33 - FES LIFTS CONSTRUCTION SEQUENCE
34 - PLANTING PLAN OVERVIEW
35 - WETLAND PARK PLANTING PLAN
36 - POND PLANTING PLAN
37 - UPSTREAM RIGHT BANK PLANTING PLAN
SHEET
301 South Livingston Street, Suite 200
Madison, WI 53703
608.441.0342
www.interfluve.com
COVER, DRAWING LIST, AND
LOCATION MAPS
1 OF 37
TEMPORARY STAGING AREA. STABILIZED CONSTRUCTION
ENTRANCE LOCATIONS TO BE FIELD LOCATED BY THE ENGINEER
0
300
600
STONE TRACKING PAD
TEMPORARY STAGING AREA
EXISTING CULVERT
TO BE REMOVED
SCALE IN FEET
STONE TRACKING PAD
TEMPORARY ACCESS
WM
TEMPORARY STAGING AREA
WITH STONE TRACKING PAD
LIMITS OF DISTURBANCE
58+00
WM
EXISTING VINYL
SHEET PILE WALL
TO BE REMOVED
STAGING AREA WITH
PROTECTED SIDEWALK
CROSSING OR REPLACEMENT
OF DAMAGED SIDEWALK
4
REBAR W/CAP
0
56+0
MONTEREY BAY
00
54+
PROPOSED SILT FENCE
WM
16+00
0
4+0
1
18+00
20+00
FLOW
0
WM
SM
SM
SM
SM
SM
EXISTING BRIDGE
PIERS
REMAIN
24+TO
00
26+0
0
0
MONTEREY DAM
TO BE REMOVED
+0
48
2
PK NAIL
0
00
44+
30+0
0
SM
32+0
0
RO
CK
SM
SM
34+00
RIV
ER
36+00
CENTER AVE
SM
38+00
TEMPORARY ACCESS WITH
STONE TRACKING PAD
BIKE PATH WILL
0 BE CLOSED BY THE CITY.
+0
THE STREET46SHALL
REMAIN OPEN.
28+0
SM
WM
SM
22+0
PROTECT EXISTING
TREES AND PATH
3
PK NAIL
TEMPORARY
DEWATERING BARRIER
WM
CLEARING AND
GRUBBING
EXISTING GATE
TO BE REMOVED
00
12+
EXISTING
00 UTILITY POLE
10+BE RELOCATED
TO
0
R
8+0
IVE
KR
SM
ROC
EXISTING CONCRETE
00
REVETMENT TO5BE
2+
PARTIALLY DEMOLISHED
0
+0
50
EXISTING STORM SEWER
OUTFALL STRUCTURES
42+00
40+00
EXACT DISTURBANCE LIMITS TO BE
DETERMINED BY THE CONTRACTOR
SM
SM
SM
SM
PLAN LEGEND
CP_
WM SM
WM SM
WM
WM
SM
WM
SM
TEMPORARY ACCESS
WITH STONE
TRACKING PAD
SURVEY CONTROL POINT
LIMITS OF DISTURBANCE
TEMPORARY STAGING AREA
STONE TRACKING PAD
EXISTING PROPERTY LINES
PROPOSED SILT FENCE
SM
WM
SANITARY MAINS
WATER MAINS
UTILITY POLE LOCATION APPROX.
IFI_Monterey_Dam_Restoration.dwg - 2/13/2018
TEMPORARY DEWATERING BARRIER
TEMPORARY ACCESS
1
NO.
02/13/2018 OHW & ALIGNMENT ADDED.
DATE
REVISION DESCRIPTION
NOTE:
Survey Control
Point #
Northing
Easting
Elevation
Description
2
264112.760
492726.230
764.400
PK Nail
3
264269.930
492309.440
764.250
PK Nail
4
264544.610
490809.350
765.890
Rebar w/Cap
DF, CP, BL BW, BC, MM, BL BC, MM, JK
DRAWN
DESIGNED
CHECKED
BC
2/13/18
15-04-13
APPROVED
DATE
PROJECT
THE CONTRACTOR WILL BE REQUIRED TO ACCESS THE RIVER AND DISTURB THE RIVER
BANK FOR MUCH OF THE PROPOSED CONSTRUCTION, WHICH WILL LIMIT THE ABILITY
TO MAINTAIN SILT FENCE BETWEEN ALL DISTURBED AREAS AND THE RIVER. WHEN
CONTRACTOR IS NOT ACCESSING THE RIVER RIVER BANK IN DISTURBED LOCATIONS
AND WHENEVER RAIN IS FORECAST, SILT SOCKS OR OTHER APPROVED SEDIMENT
CONTROL MEASURES SHALL BE INSTALLED IN ACCORDANCE WITH WISCONSIN DNR
TECHNICAL STANDARD 1071 "INTERIM MANUFACTURED PERIMETER CONTROL AND
SLOPE INTERRUPTION PRODUCTS" BETWEEN DISTURBED AREAS AND THE RIVER.
MONTEREY DAM REMOVAL & RIVER RESTORATION
CITY OF JANESVILLE
JANESVILLE, WI
MVP-2011-02255-RAN Page 2 of 13
301 South Livingston Street, Suite 200
Madison, WI 53703
608.441.0342
www.interfluve.com
SITE PLAN - ACCESS AND
EROSION & SEDIMENTATION
CONTROL
SHEET
3 OF 37
OHE
STONE TRACKING PAD
OHE
TEMPORARY STAGING AREA
OHE
LIMITS OF DISTURBANCE
PROPOSED ACCESS
OHE
WM
E
UTILITY POLE LOCATION APPROX.
WM
E
EXISTING RIPRAP TO BE REMOVED
WM
E
WM
WM
OHE
WM
OHE
WM
WM
OHE
WM
OHE
SM
SM
SM
MONTEREY DAM TO BE
REMOVED TO 2-FT BELOW
STREAM BED ELEVATION
SM
SM
SM
SM
SM
SM
SHEET 9 - PROPOSED
CONDITIONS
SM
DESIGNED
CHECKED
BC
2/13/18
15-04-13
APPROVED
DATE
PROJECT
MVP-2011-02255-RAN Page 3 of 13
SM
SM
WM
DRAWN
MONTEREY DAM REMOVAL & RIVER RESTORATION
CITY OF JANESVILLE
JANESVILLE, WI
SM
WM
IFI_Monterey_Dam_Restoration.dwg - 2/13/2018
M
OHE
REVISION DESCRIPTION
CENTER AVE
OHE
DATE
W
OHE
NO.
DF, CP, BL BW, BC, MM, BL BC, MM, JK
WM
OHE
SM
SM
160
WATER MAIN IS ATTACHED TO BRIDGE
WM
OHE
SM
SM
WM
OHE
SM
SM
SM
SM
SCALE IN FEET
02/13/2018 OHW & ALIGNMENT ADDED.
TEMPORARY DIVERSION
BARRIER
EXISTING BRIDGE PIERS TO BE PROTECTED
DURING DAM DEMOLITION
AVOID DISTURBANCE OF TREES IDENTIFIED
BY OWNER'S REPRESENTATIVE IN THIS AREA
14. RESTORE DISTURBED AREAS OUTSIDE OF THE GRADING LIMITS TO
PRE-PROJECT CONDITIONS.
1
OVERHEAD ELECTRIC APPROX.
WM
OHE
EXISTING UTILITY POLE
TO BE RELOCATED.
RESET UTILITY POLE
WITH NO CHANGE IN
UTILITY ELEVATIONS
12. BUILD FABRIC ENCAPSULATED SOIL LIFTS WHERE SHOWN.
13. PLACE TOPSOIL WHERE SHOWN, SEED AS DESCRIBED IN THE
SPECIFICATIONS, AND INSTALL FINAL SURFACE FABRIC.
OHE
OHE
EXISTING RIPRAP TO
BE REMOVED, TYP
11. REMOVE AND DISPOSE OF PARALLEL SECTION OF THE SPILLWAY.
80
PROPOSED RIPRAP
OH
EXISTING GATE STRUCTURE
TO BE REMOVED
10. REMOVE TEMPORARY DIVERSION BARRIER.
0
TEMPORARY DIVERSION BARRIER
OH
REMOVE GATE AND CULVERT STRUCTURES TO AT LEAST 2 FT BELOW
PROPOSED GRADE. COMPLETE BANK TOE CONSTRUCTION AS SHOWN.
WATER MAINS
WM
E
OH
9.
SANITARY MAINS
SM
SHEET 8 - PROPOSED CONDITIONS
AFTER THE WATER SURFACE ELEVATION DROPS BELOW THE TOP OF THE
GATES, SUCH THAT NO WATER IS FLOWING OVER THEM, REMOVED
DAM CONCRETE AND SOIL MAY BE DISPOSED WITHIN THE FILL AREAS.
CONCRETE MUST BE BROKEN INTO PIECES NOT LARGER THAN 0.5 FEET
PRIOR TO REUSE AS FILL MATERIAL. ALL EXPOSED REBAR MUST BE
REMOVED FROM THE CONCRETE PRIOR TO REUSE AS FILL MATERIAL.
REMOVE VINYL SHEET PILE WALL TO AT LEAST 2 FEET BELOW PROPOSED
GRADE.
EXISTING PROPERTY LINES
OH
EXISTING VINYL SHEET PILE
WALL TO BE REMOVED TO 2 FT
BELOW PROPOSED GRADE
INSTALL RIPRAP PER SPECIFICATIONS WHERE CONCRETE WAS REMOVED
ADJACENT TO THE SOUTH BRIDGE ABUTMENT.
8.
DAM TO BE REMOVED
PROPOSED SILT FENCE - TBD
BEGIN REMOVING THE DAM STARTING AT THE SOUTH SIDE TO ALLOW
FOR EXIT FROM THE RIVER WITHOUT CROSSING THE MOST
CONCENTRATED FLOW. THE DAM MAY ONLY BE REMOVED AT A RATE
THAT ALLOWS THE IMPOUNDMENT WATER SURFACE ELEVATION TO
DROP 6 INCHES PER DAY.
WHEN ALL THE FLOW IS GOING THROUGH THE NOTCH WHERE THE DAM
IS REMOVED, INSTALL TEMPORARY DIVERSION BARRIER WHERE
SHOWN. THE PARALLEL NORTH SPILLWAY SHOULD BE LEFT IN PLACE
WHILE THE TOE OF THE RIGHT BANK IS CONSTRUCTED TO CONTROL
SEDIMENT. THE RIGHT BANK RECONSTRUCTION AREA DOWNSTREAM
OF THE BRIDGE MUST BE DEWATERED AND ALL FISH SALVAGED PRIOR
TO CONSTRUCTION.
EXISTING CULVERT STRUCTURE
TO BE REMOVED TO 2 FT
BELOW PROPOSED GRADE
4
REBAR W/CAP
E
OH
CONTRACTOR MAY TEMPORARILY PLACE STONE AND/OR CULVERTS IN
THE RIVER TO FACILITATE ACCESS TO THE DOWNSTREAM FACE OF THE
DAM FOR THE PURPOSES OF DEMOLISHING THE DAM. ALL MATERIAL
PLACED IN THE RIVER TO FACILITATE ACCESS MUST BE REMOVED UPON
COMPLETION OF THE DAM REMOVAL.
STONE TRACKING PAD
WM
DAM DEMOLITION MAY BE COMPLETED "IN THE WET" WITHOUT
ISOLATING THE DAM FROM THE FLOWING RIVER. ACCESS TO THE DAM
SHALL BE WITHIN THE RIVER. ACCESS TO THE RIVER SHALL BE FROM THE
NORTH SIDE OF THE RIVER.
E
7.
TEMPORARY ACCESS
WM
TEMPORARY STAGING AREA
OH
6.
LIMITS OF DISTURBANCE
TEMPORARY STAGING AREA
- VIBRATION-INDUCING WORK ACTIVITY PLAN
5.
PROPOSED 1-FT CONTOUR
WM
- COFFERDAM DESIGN AND SPECIFICATIONS
4.
EXISTING 1 FT CONTOUR
WM
- EROSION CONTROL PLAN INCLUDING EQUIPMENT ACCESS AND
CONSTRUCTION SEQUENCING
3.
CENTER AVE
CONTRACTOR SHALL SUBMIT THE FOLLOWING ACCORDING TO THE
REQUIRMENTS IN THE SPECIFICATIONS:
- DEWATERING PLAN
2.
PLAN LEGEND
WM
1.
WM
SUGGESTED CONSTRUCTION SEQUENCE
SM
SHEET
301 South Livingston Street, Suite 200
Madison, WI 53703
608.441.0342
www.interfluve.com
DEMOLITION SITE PLAN
6 OF 37
0
TEMPORARY STAGING AREA
500
250
SCALE IN FEET
SEE SHEET 17
SE
E
WM
STONE TRACKING PAD
22
SH
EE
T
TEMPORARY ACCESS
W
W
W
OHW
OH
OH
OH
W
OH
W
SM
WM
OHW
SM
SM
OHE
EXISTING BRIDGE PIERS
SM
SM
WM
SM
2
PK NAIL
OHW
SM
OHW
W
OH
OHW
OHW
OH
W
OHW
PARTIALLY DEMOLISH EXISTING
CONCRETE REVETMENT AND
INSTALL VEGETATED BANK
PROTECTION
OHW
OHW
OH
W
OHE
SM
OHW
RO
CK
OHW
SM
OHW
OHW
SM
SEE SHEET 21
RIV
W
OH
SEE SHEET 24
SEE SHEET 25
ER
W
OH
OHW
SM
W
OH
OHW
OHW
SM
OH
W
SM
OHW
SM
OHW
OHW
WM
SM
WM
SM
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
SM
SM
SM
PLAN LEGEND
EXISTING 1 FT CONTOUR
SM
IFI_Monterey_Dam_Restoration.dwg - 2/13/2018
LIMITS OF DISTURBANCE
1
NO.
DATE
WM
WM
SM
EXISTING STORM SEWER
OUTFALL STRUCTURES
WATER MAINS
UTILITY POLE LOCATION APPROX.
TEMPORARY STAGING AREA
EXISTING ASPHALT PATH
STONE TRACKING PAD
FABRIC ENCAPSULATED SOIL LIFTS
NEW AVERAGE DAILY FLOW
PROPOSED RIPRAP
NEW ORDINARY HIGH WATER
REVISION DESCRIPTION
WM
SM
SANITARY MAINS
TEMPORARY ACCESS
02/13/2018 OHW & ALIGNMENT ADDED.
WM
SM
PROPOSED SILT FENCE
PROPOSED 1 FT CONTOUR
OHW
WM
SM
OHE
DF, CP, BL BW, BC, MM, BL BC, MM, JK
DRAWN
DESIGNED
CHECKED
BC
2/13/18
15-04-13
APPROVED
DATE
PROJECT
OVERHEAD ELECTRIC APPROX.
MONTEREY DAM REMOVAL & RIVER RESTORATION
CITY OF JANESVILLE
JANESVILLE, WI
MVP-2011-02255-RAN Page 4 of 13
SHEET
301 South Livingston Street, Suite 200
Madison, WI 53703
608.441.0342
www.interfluve.com
W
OH
W
OHW
OHW
W
OHW
OHE
SM
W
OH
OH
OH
WM
W
SEE SHEET 15
SM
OHW
W
W
FLOW
OH
R
E
RIV
PROPOSED
CULVERT
OH
OHW
W
OH
WM
OHE
OHW
OH
3
PK NAIL
OH
W
W
O
FL
OH
W
OHW
BOULDER
HABITAT
W
OH
W
OHW
OH
W
OHW
W
OHW
W
OH
W
OHW
OHW
OHW
OHW
W
OH
OH
OH
OHW
OHE
OHW
OH
W
WM
OHW
K
OH
OH
E
OH
OH
W
ROC
W
WM
E
W
OH
PROPOSED POND
OH
W
OHE
WM
W
4
SEE SHEET 16
REBAR W/CAP
OH
SEE SHEET 10
OHW
OHW
W
OH
SEE SHEET 11
OH
W
OH
OH
OHW
OH
W
OHW
PROPOSED CONDITIONS
OVERVIEW AND SHEET INDEX 7 OF 37
N:264529.87
E:490244.05
N:264523.75
E:490153.41
HW
O
OHW
OHW
W
OH
W
OHW
OHW
OHW
OHW
OHW
757
OH
W
W
OH
OHW
OHW
OHW
OHW
OHW
OHW
HW
OHW
OH
OHW
OHW
O
OHW
OHW
W
O
756
OHW
OHW
OHW
OHW
OH
HW
757
OHW
N:264526.48
E:490432.41
OHW
POND BOTTOM GRADING SHALL INCLUDE
MICROTOPOGRAPHY AS PITS AND MOUNDS
WITH A VERTICAL VARIATION OF +/- 0.5 FEET
W
OH
W
OHW
OHW
W
OH
OHW
OHW
OH
W
OHW
OH
756
W
OH
W
OHW
OHW
OHW
OHW
OHW
W
OHW
OH
OHW
SURFACE FABRIC
W
OHW
OH
W
OHW
OH
W
W
OH
1 N:264366.52
12 E:490324.98
OH
W
OH
W
OH
5
W
W
OHW
OH
OH
W
75
OHW
756
OHW
OHW
OHW
OHW
OHW
OHW
OHW
W
OHW
4 N:264327.09
12 E:490448.07
W
OH
OHW
OHW
76
ANGLER ACCESS, SEE SHEET 26
1
OH
W
N:264302.94
E:490200.24
EXISTING 1 FT CONTOUR
OHW
OHW
W
OH
2 N:264296.15
12 E:490279.11
CLEAR AND GRUB
W
PROPOSED 1 FT CONTOUR
EXISTING BRIDGE PIER TO BE PROTECTED
3 N:264304.81
12 E:490327.40
TEMPORARY ACCESS
OH
W
OH
W
OH
LIMITS OF DISTURBANCE
W
OH
OH
W
EXISTING PROPERTY LINES
ANGLER ACCESS
IFI_Monterey_Dam_Restoration.dwg - 2/13/2018
SURFACE FABRIC
0
NEW AVERAGE DAILY FLOW
1
NO.
02/13/2018 OHW & ALIGNMENT ADDED.
DATE
REVISION DESCRIPTION
OH
W
OHW
30
60
ROCK RIVER
NEW ORDINARY HIGH WATER
SCALE IN FEET
DF, CP, BL BW, BC, MM, BL BC, MM, JK
DRAWN
DESIGNED
CHECKED
BC
2/13/18
15-04-13
APPROVED
DATE
PROJECT
MONTEREY DAM REMOVAL & RIVER RESTORATION
CITY OF JANESVILLE
JANESVILLE, WI
MVP-2011-02255-RAN Page 5 of 13
SHEET
301 South Livingston Street, Suite 200
Madison, WI 53703
608.441.0342
www.interfluve.com
W7
7OH5
8
75
9
75
0
76
1
76
2
76
776634
765
OHW
OHW
OHW
760
PLAN LEGEND
OHW
OHW
OH
OHW
OHW
OHW
757
758
759
760
761
761
760
759
758
757
OHW
756 OHW
OHW
OH
OHW
N:264467.31
E:490547.77
OH
W
OH
OHW
O
HW
WETLAND PARK
DOWNSTREAM PLAN
10 OF 37
OHW
OHW
765
764
763
762
761
760
759
OHW
758
757
756
OHW
PLAN LEGEND
OHE
STONE TRACKING PAD
OHE
2
GRADE EXISTING BERM AND PONDED AREA
14 BETWEEN CULVERTS AND GATES
EXISTING 1 FT CONTOUR
PROPOSED 1 FT CONTOUR
WM
LIMITS OF DISTURBANCE
WM
TEMPORARY ACCESS
765
E
OH
TEMPORARY STAGING AREA
STONE TRACKING PAD
WM
E
OH
4
REBAR W/CAP
765
EXISTING PROPERTY LINES
WATER MAINS
WM
UTILITY POLE LOCATION APPROX.
WM
757
ASPHALT PATH SHALL BE
CONSTRUCTED IN
ACCORDANCE WITH THE
CITY STANDARD DETAIL #23
IN THE CITY OF JANESVILLE
STANDARD SPECIFICATIONS
E
OH
PROPOSED ASPHALT PATH
FABRIC ENCAPSULATED SOIL LIFTS
SURFACE FABRIC
OH
760
761
762
758
757
759
PROPOSED CANOE/KAYAK ACCESS
WM
E
OH
769
755
757
OHW
E
OH
W
OH
OH
E
W
76
6
767
768
OH
759
E
OHW
W
OH
OHE
7
13
N:264354.32
E:490698.89
W
OH
W
4
28
LOG JAM
CONSTRUCTION
8 N:264347.16
13 E:490859.30
1
14
BANK
STABILIZATION
AT DAM
WM
OHW
75OH7W
747
TIE PROPOSED
RIPRAP INTO
EXISTING RIPRAP AT
BRIDGE
OH
W
OHW
5 N:264344.87
13E:490591.46
6 N:264349.70
13 E:490620.07
RESET UTILITY POLE
OHW
WITH NO
CHANGE IN
OH
UTILITY ELEVATION
W
OHW
W
FENCE FROM THIS POINT
EASTWARD TO REMAIN.
FINISH WITH FENCE
ATTACHED TO END POST
OHW
WM
OHW
OHW
OH
W
OHW
EXISTING UTILITY POLE
OHW
TO BE RELOCATED.
OH
OH
OHW
OHW
OHE
OHW
OHW
OHW
743
77474454
6
747
OHW
WM
758
OHW
75704948
7 74746
7 74544
7 743
744
7465
4
7
749
7
7 50
77553521
774478
W
OH
W
WM
760
SCALE IN FEET
764
763
762
761
760
OHW
759
758 OHW
OHW
OHW
757
756
755
7757555234
7
7
7 501 EXISTING WATER MAIN
77744464789
ATTACHED TO BRIDGE
OH
74544
7743
E
765
OH
W
OH
OH
W
60
WM
OH
75598 OHW
7 57
W
H
7 56
O
7
754
753 752
OHW
OHW
768
767
766
765
WM
8
75759 0
76761
762 763 764
762
30
WM
E
OH
756
0
WM
E
SEE DETAIL ON SHEET 28 FOR APPROXIMATE
NUMBERS OF WOOD PIECES. LOCATIONS
SHOWN ARE APPROXIMATE AND DO NOT
REFLECT ACTUAL FINAL POSITION
761
OHW
60
FT
OVERHEAD ELECTRIC APPROX.
OHE
PROPOSED CONCRETE PLATFORM,
SEE SHEET 26
754
OHW
OH
W
763
OH
OHW
WM
E
OH
CITY OF JANESVILLE TO
REMOVE ALL FENCE
20 FT
OHW
NEW ORDINARY HIGH WATER
OHW
W
OH
765
764
763
762
761
760
759
OHW
758
757
756
NEW AVERAGE DAILY FLOW
WM
E
OH
OHW
E
PROPOSED RIPRAP
BIKE PATH SIGNAGE AND
FIRE HYDRANT TO REMAIN
UNDISTURBED
W
OH
7
75
8
75
9
75
0
76
1
76
2
76
776634
765
WM
W
OH
N:264467.31
E:490547.77
8
757
764
WM
OH
W
EXISTING ASPHALT PATH
N:264519.12
E:490809.10
77
E
OH
OH
W
OHW
WM
TEMPORARY
STAGING AREA
E
OH
758
OHW
775
E
OH
EXISTING ASPHALT
PATH TO BE
PROTECTED
N:264568.30
E:490701.27
N:264567.70
E:490622.49
EXISTING BILLBOARD SIGN, ELECTRICAL
BOX, FIRE HYDRANT, AND BIKE PATH
SIGNAGE TO REMAIN UNDISTURBED
WM
CITY OF JANESVILLE TO REMOVE
AND REPLACE BENCH
764
763
762
761
760
759
OHW
WM
TEMPORARY ACCESS
NO.
02/13/2018 OHW & ALIGNMENT ADDED.
DATE
REVISION DESCRIPTION
DF, CP, BL BW, BC, MM, BL BC, MM, JK
DRAWN
DESIGNED
CHECKED
BC
2/13/18
15-04-13
APPROVED
DATE
PROJECT
ROCK RIVER
AVOID DISTURBANCE OF TREES IDENTIFIED
BY OWNER'S REPRESENTATIVE IN THIS AREA
MONTEREY DAM REMOVAL & RIVER RESTORATION
CITY OF JANESVILLE
JANESVILLE, WI
MVP-2011-02255-RAN Page 6 of 13
WM
1
PROPOSED CANOE/KAYAK
ACCESS
WM
CLEAR AND GRUB
OHE
IFI_Monterey_Dam_Restoration.dwg - 2/13/2018
OHE
PLACE DAM REMNANTS IN EXISTING
RESERVOIR PRIOR TO EARTHEN FILL
SHEET
301 South Livingston Street, Suite 200
Madison, WI 53703
608.441.0342
www.interfluve.com
WETLAND PARK UPSTREAM
11 OF 37
PLAN
OHW
76
775
9
PLAN LEGEND
EXISTING 1 FT CONTOUR
PROPOSED 1 FT CONTOUR
LIMITS OF DISTURBANCE
GRAVEL PATH SHALL BE 10' WIDE WITH 8" FINE
GRADATION BASE, AND 2" LIMESTONE SCREENINGS
769
76
8
TEMPORARY STAGING AREA
TEMPORARY ACCESS
TEMPORARY DIVERSION BARRIER
EXISTING ASPHALT PATH
PROPOSED GRAVEL PATH
77
8
NEW AVERAGE DAILY FLOW
NEW ORDINARY HIGH WATER
OHW
EXISTING GRAVEL PATH
TEMPORARY STAGING AREA
763
76
765
7
764
PROPOSED PEDESTRIAN/ANGLER
RIVER ACCESS, TYP, SEE SHEET 26
OHW
OHW
OHW
OHW
MONTEREY ROCK
5 LOGS
5 ROOTWADS
4 PILES
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
5 LOGS
5 ROOTWADS
4 PILES
OHW
OHW
OHW
7734
OHW
OPTIONAL TEMPORARY DIVERSION BARRIER
OHW
OHW
OHW
OHW
PROPOSED PEDESTRIAN/ANGLER RIVER
ACCESS, TYP, SEE SHEET 26 EXACT
LOCATIONS AND ELEVATION OF ACCESS TO
BE VERIFIED IN THE FIELD BY THE ENGINEER.
EXISTING BRIDGE PIER
763
OHW
OHW
OHW
OHW
OHW
OHW
OHW
758 OHW
OHW
751
749
748
752
ROCK RIVER
IFI_Monterey_Dam_Restoration.dwg - 2/13/2018
749
PROPOSED LARGE WOOD HABITAT CRIB,
TYP, SEE SHEET 28 EXACT WOOD
LOCATIONS TO BE DETERMINED AND
APPROVED BY THE ENGINEER IN THE FIELD.
0
EXISTING DAM
TO BE REMOVED
1
NO.
02/13/2018 OHW & ALIGNMENT ADDED.
DATE
REVISION DESCRIPTION
DF, CP, BL BW, BC, MM, BL BC, MM, JK
DRAWN
DESIGNED
CHECKED
BC
2/13/18
15-04-13
APPROVED
DATE
PROJECT
30
60
SCALE IN FEET
MONTEREY DAM REMOVAL & RIVER RESTORATION
CITY OF JANESVILLE
JANESVILLE, WI
MVP-2011-02255-RAN Page 7 of 13
OHW
SHEET
301 South Livingston Street, Suite 200
Madison, WI 53703
608.441.0342
www.interfluve.com
UPSTREAM BANK
TREATMENT
16 OF 37
OHW
OHW
PATHWAY TO BE PROTECTED
N:264897.79
E:491636.77
STONE TRACKING
PAD
PLAN LEGEND
SAWCUT EXISTING RCP 2 FT BACK
FROM EXISTING OUTFALL
N:264886.44
E:491904.12
ELEV:760.09
764
763
SAWCUT EXISTING RCP 2 FT BACK
FROM EXISTING OUTFALL
N:264851.39
E:491614.67
ELEV:759.48
54 LF 12 IN. CL III RCP
759
755 756757758
8
775567
5
7545
777553
760STORM SEWER AT 0.3%
WITH APRON END
WALL AND 4.4 CY
MEDIUM RIP-RAP
N:264707.09
E:491355.06
ELEV:759.89
PROPOSED 1 FT CONTOUR
LIMITS OF DISTURBANCE
7756
90
5-FT RC MANHOLE
TOC: 763.30
INV (NE): 759.24
INV (SW): 759.14
SEE CITY OF JANESVILLE
STANDARD SPEC. #12
FRAME: NEENAH
R-1710-NR
COVER: NEENAH
N1090-1093
12 IN. RC APRON
TEMPORARY ACCESS
EXISTING ASPHALT PATH
PROPOSED GRAVEL PATH
N:264748.83
E:492225.89
ELEV:759.24
EXISTING CONCRETE REVETMENT
UTILITY POLE LOCATION APPROX.
PROPOSED STORM SEWER
758757
75
8
26 LF 30 IN. CL III RCP
STORM SEWER AT 0.3%
WITH APRON END
WALL AND 12.3 CY
MEDIUM RIP-RAP
959
757
WARP SIDESLOPE
AS NEEDED
766
765
7
776601234
STORM SEWER
30 IN. DIA.
634
776612
776
762
12 IN. RC APRON
N:264764.66
E:491295.13
EXISTING 1 FT CONTOUR
EXISTING STORM SEWER
N:264826.47
E:491902.07
ELEV:759.91
N:264809.75
E:491620.16
ELEV:759.36
32 LF 12 IN. CL III RCP
STORM SEWER AT 0.3%
WITH APRON END
WALL AND 4.4 CY
MEDIUM RIP-RAP
SAWCUT EXISTING RCP 2 FT
BACK FROM EXISTING OUTFALL
N:264867.68
E:492135.81
N:264730.38
E:492198.53
ELEV:759.04
PROPOSED EMERGENCY OVERFLOW
NEW AVERAGE DAILY FLOW
30 IN. RC APRON
OHW
NEW ORDINARY HIGH WATER
9
75
0
80
160
SCALE IN FEET
12 IN. RC APRON
765
763
7743
OHW
758
OHW
752
OHW
763
63
759
760 761 7672
761
758 OHW
760
W 757
OHW
OH
7
OH59
W7
58
OHW
9
N:264355.88
756
75O7HW
755
E:491542.79
19
6
75
50 LF 12 IN. CL III RCP
STORM SEWER AT 0.3%
WITH APRON END
WALL AND 4.4 CY
MEDIUM RIP-RAP
EMERGENCY POND
OVERFLOW AT ELEV. 762
3
76
764
OHW
OHW
76
2
763
SEE SHEET 18
759
2
761
760
76
763
NWL = 760.00
7
77554
775558765
75
760 9
76
762 1
FIELD VERIFY ALL LOCATIONS AND
ELEVATIONS
N:264453.81
E:492227.40
ELEV:760.3111 N:264434.43
20 E:492291.85
PIPE TO BE ABANDONDED BY OTHERS
SAWCUT EXISTING RCP 2
FT BACK FROM EXISTING
N:264386.84
OUTFALL
E:492213.58
ELEV:759.19
762
OH
NOTES:
N:264461.07
E:492171.88
ELEV:760.14
77557
7755456
1
31
W
OH
W
PROPOSED EMERGENCY POND OVERFLOW
100 FT X 28 FT 311 SY TRM CLASS III TYPE D
SOIL STABILIZER TYPE A OR 3 IN. OF TOPSOIL
MAY BE USED FOR TOP COVER. TOP COVER
INCIDENTAL TO TRM. 20 FT BOTTOM WIDTH,
8:1 SIDESLOPES, 0.5 FT DEPTH
OH
W
W
OH
W
OH
OHW
OH
W
IFI_Monterey_Dam_Restoration.dwg - 2/13/2018
OHW
GRAVEL PATH SHALL BE 10' WIDE WITH 8" FINE
GRADATION BASE, AND 2" LIMESTONE SCREENINGS
OH
W
10 N:264208.34
E:491835.07
19
OHW
76
761 2
7
6
7590
OH
W
OH
W
W
OH
1
NO.
02/13/2018 OHW & ALIGNMENT ADDED.
DATE
REVISION DESCRIPTION
DF, CP, BL BW, BC, MM, BL BC, MM, JK
DRAWN
DESIGNED
CHECKED
BC
2/13/18
15-04-13
APPROVED
DATE
PROJECT
3
PK NAIL
BREAK UP CONCRETE TO A MINIMUM OF 4 FEET
BELOW THE PROPOSED FINAL GRADE
ELEVATION. BROKEN CONCRETE TO BE BURIED
AT THE BOTTOM OF THE EXISTING SLOPE
N:264161.36
E:492262.79
ELEV:759.48
OHW
MONTEREY DAM REMOVAL & RIVER RESTORATION
CITY OF JANESVILLE
JANESVILLE, WI
MVP-2011-02255-RAN Page 8 of 13
SHEET
301 South Livingston Street, Suite 200
Madison, WI 53703
608.441.0342
www.interfluve.com
WARP SIDESLOPE AS NEEDED AT ALL
OUTFALLS
SAWCUTS WILL CONSIDERED
INCIDENTAL TO STORMWATER PIPE
CONSTRUCTION.
REMOVAL AND DISPOSAL OF EXISTING
PIPES AND APRONS WILL BE
CONSIDERED INCIDENTAL TO
STORMWATER PIPE CONSTRUCTION.
TRAIL ELEV. 762.5
761
762
TIE LAST 3 JOINTS OF ALL OUTFALLS
MONTEREY BAY PROPOSED
17 OF 37
POND
PLAN LEGEND
EXISTING ROAD
EXISTING 1 FT CONTOUR
PROPOSED 1 FT CONTOUR
EXISTING STORM SEWER
LIMITS OF DISTURBANCE
TEMPORARY ACCESS
BOULDER/RIPRAP STAGING AREA
PROPOSED BOULDER HABITAT
EXISTING ASPHALT PATH
PROPOSED STAGING AREA
REPAIR DAMAGED PATH TO
PRE-PROJECT CONDITIONS
UTILITY POLE LOCATION APPROX.
PROPOSED CANOE/KAYAK ACCESS
PROPOSED RIPRAP
NEW AVERAGE DAILY FLOW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
O
OHW
STONE
TRACKING
OHW PADHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OH
W
NEW ORDINARY HIGH WATER
OHW
PICNIC TABLES TO BE INSTALLED BY CITY
OF JANESVILLE
OH
W
SURFACE FABRIC
PROPOSED CANOE/KAYAK ACCESS
W
OH
EXISTING ASPHALT PATH
TO BE REPAIRED OR REPLACED IF
DAMAGED
W
OH
3
76
W
OH
W
OH
ROCK RIVER
8
75
60+00
58+00
3
75
0
56+0
W
OH
NOTE: BOULDER LOCATIONS ARE
APPROXIMATE. EXACT LOCATIONS
MAY VARY AND WILL BE IDENTIFIED
IN THE FIELD BY THE ENGINEER.
W
OH
OHW
00
54+
OHW
OHW
OHW
OH
OH
OHW
W
OH
W
0
OHW
0
2+
W
5
W
OH
W
OH
PROPOSED BOULDER
HABITAT, TYP, SEE SHEET 30
OHW
W
OH
PROPOSED PEDESTRIAN/ANGLER
RIVER ACCESS, TYP, SEE SHEET 26
W
OH
W
OH
0
+0
50
W
OH
W
R
OH
VE
IFI_Monterey_Dam_Restoration.dwg - 2/13/2018
CK
OHW
RI
RO
W
OH
0
100
200
W
OH
0
1
NO.
02/13/2018 OHW & ALIGNMENT ADDED.
DATE
REVISION DESCRIPTION
+0
48
DF, CP, BL BW, BC, MM, BL BC, MM, JK
DRAWN
DESIGNED
CHECKED
BC
2/13/18
15-04-13
APPROVED
DATE
PROJECT
MONTEREY DAM REMOVAL & RIVER RESTORATION
CITY OF JANESVILLE
JANESVILLE, WI
SCALE IN FEET
W
OH
MVP-2011-02255-RAN Page 9 of 13
301 South Livingston Street, Suite 200
Madison, WI 53703
608.441.0342
www.interfluve.com
UPSTREAM BOULDER
HABITAT AND PARK
AMENITIES
SHEET
24 OF 37
OHW
W
OH
0
500
250
LAWN
SCALE IN FEET
POND MIX
LAWN
INVASIVE PLANT MANAGEMENT
LAWN
OH
OH
OHW
W
OH
W
OHW
W
W
OH
OH
W
OHW
OHW
OHW
OH
OH
W
OHW
OH
W
OH
W
OHW
OHW
W
OH
OHW
OHW
OHW
NATIVE STABILIZATION MIX
W
OH
OH
W
W
2
PK NAIL
OHW
W
OH
OH
W
OHW
OHW
W
OH
OHW
OHW
RIPARIAN SAVANNAH
OH
W
OHW
OHW
OH
OH
W
OHW
OH
W
OHW
OHW
OHW
W
OH
ROCK RIVER
OHW
W
OH
OHW
OHW
OH
W
OHW
PLAN LEGEND
IFI_Monterey_Dam_Restoration.dwg - 2/13/2018
OHW
1
NO.
DATE
PLANTING ZONES
EXISTING 1 FT CONTOUR
INVASIVE PLANT MANAGEMENT
PROPOSED 1 FT CONTOUR
LAWN
LIMITS OF DISTURBANCE
RIPARIAN SAVANNAH
TEMPORARY ACCESS
NATIVE STABILIZATION MIX
NEW AVERAGE DAILY FLOW
POND MIX
NEW ORDINARY HIGH WATER
OPEN WATER
02/13/2018 OHW & ALIGNMENT ADDED.
REVISION DESCRIPTION
DF, CP, BL BW, BC, MM, BL BC, MM, JK
DRAWN
DESIGNED
CHECKED
BC
2/13/18
15-04-13
APPROVED
DATE
PROJECT
W
OH
W
RIPARIAN SAVANNAH
OHW
OHW
RIPARIAN SAVANNAH
R
IVE
KR
C
O
R
OH
3
PK NAIL
W
OHW
OH
OHW
OH
W
OHW
OHW
OHW
W
OH
OH
W
OHW
OHW
OH
W
OHW
W
W
OH
W
OH
W
OH
OH
W
OH
W
OH
OH
W
OHW
W
4
REBAR W/CAP
OHW
OH
W
OH
W
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
PLANTING TABLE
PLANTING ZONE
AREA (ACRE)
INVASIVE PLANT MANAGEMENT
2.75
LAWN
4.65
RIPARIAN SAVANNAH
2.50
POND MIX
2.25
NATIVE STABILIZATION MIX
11.40
MONTEREY DAM REMOVAL & RIVER RESTORATION
CITY OF JANESVILLE
JANESVILLE, WI
MVP-2011-02255-RAN Page 10 of 13
SHEET
301 South Livingston Street, Suite 200
Madison, WI 53703
608.441.0342
www.interfluve.com
PLANTING PLAN OVERVIEW 34 OF 37
INVASIVE PLANT
MANAGEMENT AREA
4
REBAR W/CAP
OHW
OH
OH
OHW
OPEN WATER
OH
LAWN
W
W
W
OHW
OHW
OHW
OHW
W
OH
OHW
OHW
OH
OHW
OHW
W
OH
W
OH
W
OHW
W
W
W
OHW
OH
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
W
OH
OHW
OH
W
OHW
OHW
RIPARIAN SAVANNAH
OHW
OH
OHW
W
OH
OHW
OH
W
W
OH
OHW
OHW
OH
OHW
OHW
OHW
OHW
HW
O
OHW
OH
W
W
OH
PRIMARY VEGETATION CLEARING AREA
PLANTING ZONES
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
INVASIVE PLANT MANAGEMENT AREA
OHW
IFI_Monterey_Dam_Restoration.dwg - 2/13/2018
0
NATIVE STABILIZATION MIX
PRIMARY VEGETATION CLEARING AREA
1
NO.
02/13/2018 OHW & ALIGNMENT ADDED.
DATE
REVISION DESCRIPTION
SM
DF, CP, BL BW, BC, MM, BL BC, MM, JK
DRAWN
DESIGNED
CHECKED
BC
2/13/18
15-04-13
APPROVED
DATE
PROJECT
SM
SM
MONTEREY DAM REMOVAL & RIVER RESTORATION
CITY OF JANESVILLE
JANESVILLE, WI
MVP-2011-02255-RAN Page 11 of 13
SM
SM
SM
SM
OHW
OHW
160
OH 80
W
OHW
SM
SM
SM
SCALESMIN FEET
SM
OHW
SM
SHEET
301 South Livingston Street, Suite 200
Madison, WI 53703
608.441.0342
www.interfluve.com
OHW
W
OHW
RIPARIAN SAVANNAH
OH
LAWN
SM
WETLAND PARK PLANTING
35 OF 37
PLAN
OHW
OH
W
764
763
LAWN
8
775576
5
77545
77553
760
759
755 756757758
634
776612
776
762
7756
90
758757
75
8
OPEN WATER
766
765
77661234
0
959
757
9
75
763
OHW
OHW
758
OHW
OHW
752
3
76
7743
OHW
76
2
763
764
759
765
761
760
76
2
763
77557
7755456
763
63
759
760 761 7672
761
758 OHW
760
W 757
OHW
OH
7
OH59
W7
58
OHW
756
75O7HW
755
6
75
7
77554
775558765
75
760 9
76
762 1
762
0
OH
W
80
OH
W
INVASIVE PLANT MANAGEMENT
W
OH
OHW
LAWN
OH
W
O
HW
OH
NATIVE STABILIZATION
MIX
W
RIPARIAN SAVANNAH
76
761 2
7
6
7590
OHW
NATIVE STABILIZATION MIX
OH
W
POND MIX
OH
W
W
OH
OPEN WATER
1
NO.
02/13/2018 OHW & ALIGNMENT ADDED.
DATE
REVISION DESCRIPTION
3
PK NAIL
761
762
OH
W
PLANTING ZONES
IFI_Monterey_Dam_Restoration.dwg - 2/13/2018
SCALE IN FEET
OH
W
DF, CP, BL BW, BC, MM, BL BC, MM, JK
DRAWN
DESIGNED
CHECKED
BC
2/13/18
15-04-13
APPROVED
DATE
PROJECT
RIPAR
IAN S
OHW
MONTEREY DAM REMOVAL & RIVER RESTORATION
CITY OF JANESVILLE
JANESVILLE, WI
MVP-2011-02255-RAN Page 12 of 13
AVAN
NAH
OH
W
SHEET
301 South Livingston Street, Suite 200
Madison, WI 53703
608.441.0342
www.interfluve.com
POND PLANTING PLAN
36 OF 37
160
CANOE LAUNCH
OHW
OHW
OHW
OHW
OHW
OHW
OH
W
OHW
OH
W
NATIVE STABILIZATION MIX
W
OH
W
OH
3
76
W
OH
OH
W
75
8
3
75
W
OH
W
OH
W
OH
OH
W
W
OH
W
OH
W
LA
W
N
OH
W
OH
W
OH
0
+0
50
RI
PA
OH
W
RI
AN
OH
S7A62
W V
7757577 A
57 N
23545556 O N
7 HW A
H
3
PK NAIL
OH
W
0
+0
48
OHW
OHW
W
OHW
W
OH
OHW
OHW
OHW
775757567575542
OHW
OH
W
PLANTING ZONES
LAWN
OH
W
OHW
PROPOSED PEDESTRIAN/ANGLER
RIVER ACCESS, TYP, SEE SHEET 26
OH
W
OHW
SCALE IN FEET
RIPARIAN SAVANNAH
W
OHW
W
OH
OHW
00
44+
NATIVE STABILIZATION MIX
1
NO.
02/13/2018 OHW & ALIGNMENT ADDED.
DATE
REVISION DESCRIPTION
DF, CP, BL BW, BC, MM, BL BC, MM, JK
DRAWN
DESIGNED
CHECKED
BC
2/13/18
15-04-13
APPROVED
DATE
PROJECT
MONTEREY DAM REMOVAL & RIVER RESTORATION
CITY OF JANESVILLE
JANESVILLE, WI
MVP-2011-02255-RAN Page 13 of 13
W
42+00
SHEET
301 South Livingston Street, Suite 200
Madison, WI 53703
608.441.0342
www.interfluve.com
UPSTREAM RIGHT BANK
PLANTING PLAN
37 OF 37
OH
IFI_Monterey_Dam_Restoration.dwg - 2/13/2018
OH
W
0
+0
46
W
200
OH
OHW
NATIVE STABILIZATION
OHW
MIX
100
OH
W
OH
OH
OHW
OHW
OH
W
0
W
OH
OHW
W
W
OH
OH
OH
W
OH
W
2
PK NAIL