LETTER OF PERMISSION: The applicant proposes to construct an expansion of their current facility. The expansion would take place on farm land immediately to the west of the current Digi Key facility.

PROJECT DESCRIPTION AND PURPOSE: The applicant proposes to construct an expansion of their current facility. The expansion would take place on farm land immediately to the west of the current Digi Key facility. The project would involve the construction of an approximately 1,000,000 square foot warehouse and distribution center. Two entrance roads from County State Aid Highway 16 would also be constructed for vehicle entrance and exit from the new facility. An entrance would also be constructed on the north end of the proposed facility from Barzen Avenue.

Information for File # MVP-2017-03282-LSP Applicant: Digi Key Electronics ­ Rick Harris Corps Contact: Lawrence Puchalski Address: 4111 Technology Drive, Suite 295, Bemidji, Minnesota 56601 E-Mail: Lawrence.S.Puchalski@usace.army.mil Phone: (651) 290-5339 Primary County: Pennington Sections: 32 Township: 154N Range: 43W Information Complete On: 21 February 2018. Posting Expires On: 18 April 2018. Authorization Type: LOP-05-MN(B) This application is being reviewed in accordance with the practices for documenting Corps jurisdiction under Sections 9 & 10 of the Rivers and Harbor Act of 1899 and Section 404 of the Clean Water Act identified in Regulatory Guidance Letter 07-01. We have made a preliminary determination that the aquatic resources that would be impacted by the proposed project are regulated by the Corps of Engineers under Section 404 of the Clean Water Act. Our jurisdictional review and final jurisdictional determination could result in modifications to the scope of the project's regulated water body/wetland impacts and compensatory mitigation requirements identified above. An approved jurisdictional determination will be made prior to reaching a permit decision, and will be posted on the St. Paul District web page at http://www.mvp.usace.army.mil/.

Project PROJECT DESCRIPTION AND PURPOSE: The applicant proposes to construct an expansion of their current facility. The expansion would take place on farm land immediately to the west of the current Digi Key facility. The project would involve the construction of an approximately 1,000,000 square foot warehouse and distribution center. Two entrance roads from County State Aid Highway 16 would also be constructed for vehicle entrance and exit from the new facility. An entrance would also be constructed on the north end of the proposed facility from Barzen Avenue. Four storm water ponds will also be constructed on site. The proposed project is shown on the attached drawings labeled MVP-2017-03282LSP Page 1 of 4 through Page 4 of 4. This project would require the removal of 2.0 acres of mature trees which could be utilized by Northern Long Eared Bats during portions of the year. This project is being coordinated with the U.S. Fish and Wildlife Service for potential impacts to the Northern Long Eared Bat.

1

NAME, AREA AND TYPES OF WATERS (INCLUDING WETLANDS) SUBJECT TO LOSS: The applicant conducted a delineation of aquatic resources in the project location. A total of 15 wetlands were identified and are shown on the attached drawings. The Corps of Engineers provided a combined approved jurisdictional determination and preliminary jurisdictional determination to the applicant which identified four wetlands which are subject to Corps of Engineers jurisdiction. These wetlands are identified on the attached drawings as Wetland 2, Wetland 3, Wetland Ditch 10 and Wetland Ditch 11. This project would impact approximately 0.94 acres of jurisdictional wetlands. ALTERNATIVES CONSIDERED: The applicant conducted an analysis for their projected needs and determined that an additional 1,000,000 square foot warehouse and associated infrastructure was required to meet business needs. An alternatives analysis was conducted by the applicant and was submitted with the application. A description of the alternatives studied are described below. Option 1: The applicant studied a no-build alternative. This alternative would avoid all wetland impacts, but would not meet the needs of the applicant for additional warehouse space to expand their business. Option 2: Total avoidance of wetland impacts on the target property could be achieved by rearranging the site layout. The proposed warehouse would need to be split into three separate buildings connected by overhead walkways and conveyor systems. The overall warehouse would be reduced by approximately 230,000 sq. ft. to avoid all wetland impacts. The parking lots and loading dock areas would need to be separated to avoid wetland impacts. The proposed stormwater ponds would need to be reduced in size or not constructed to avoid all wetland impacts. Single arch culverts would be installed along the roadways at all wetland ditch crossings. Option 3: Total avoidance of wetland impacts could potentially be achieved by constructing the proposed project at Offsite Alternative 4 which is described in the application. This property is located adjacent southwest of the project area. Avoiding all wetland impacts would require separating the proposed warehouse into separate buildings. Utilities are located within ½ mile of this site and could be extended to the project area. The applicant does not currently own this property and the property is not currently for sale. This property is not currently located within the city limits and is not zoned for the proposed project. Offsite Locations: Offsite alternative sites were explored within the vicinity of the project area. According to the applicant, many sites found near the project area were not large enough to complete the proposed project. Five offsite locations were selected and analyzed for their ability to meet project requirements. Each of the offsite alternatives are described in detail in an appendix to the application. Onsite Alternatives: One additional alternative site layout was completed for the target property. This alternative would reduce wetland impacts by 0.70 acres compared to the Applicant's Preferred Alternative. The west parking lot and loading dock were separated to reduce wetland impacts. Single arch culverts

2

would be installed at roadway crossings impacting wetlands. The proposed stormwater pond expansion on the south side of the project area was removed. The loading dock area would need to be accessed from Barzen Avenue and County Highway 16, which would create traffic issues. COMPENSATORY MITIGATION: The applicant has proposed to purchase credits from an approved wetland bank to offset unavoidable wetland losses associated with this project. Drawings

See attached.

3

MVP-2017-03282-LSP Page 1 of 4

PROJECT LOCATION

IMAGE: UNITED STATES DEPARTMENT OF THE INTERIOR - GEOLOGICAL SURVEY

© 2018 WIDSETH SMITH NOLTING

ROSEAU

MARSHALL

KOOCHICHING PENNINGTON RED LAKE

ER CLEARWAT

N ME

NO

ST. LOUIS

MILLE LACS KA NAB EC

G

WAD

WIN

PINE

WRIGHT

LE

MCLEOD CARVER RENVILLE SIBLEY

REDWOOD

NICOLLET

BROWN

LE

DAKOTA SCOTT R GOODHUE EU RICE SU WABASHA

CA

ELE

SE

ROCK NOBLES JACKSON

WA

WAT ON EARTH ON BLUE WO WAN OD

STE

CO TT

U.S.G.S. QUADRANGLE MAPS:

HENNEPIN

AR

IP

QU

MEEKER

ANOKA

RA MSE Y WASHINGTO N

TRAV

IYO

ISANTI

O

C

ND

CHIPPEWA KA

SHER BU

RNE

HI

LA

STON LINCOLN E

CARLTON

ISAG

STEARNS

SWIFT

YELLOW MEDIC INE

PIPE

AITKIN

CR

MORRISON

BENTON

STEVENS POPE

STO

MU

( IN FEET )

RD A EN

ERSE

TODD

RRAY

4000

OW

WILKIN

OTTER TAIL

LYON

2000

CASS

GRANT DOUGLAS

NE

0

HU BB A

BECKER

CH

BIG

LAKE

ITASCA

H MA

CLAY

COOK

BELTRAMI

POLK

NORMAN

NORTH

KITTSON

LAKE OF THE WOODS

AREA LOCATION

DODGE OLMSTED WINONA

MARTIN FARIBAULT FREEBORN MOWER

FILLMORE HOUSTON

THIEF RIVER FALLS, THIEF RIVER FALLS NW PUBLISHED: 1961, 1961 PHOTOREVISED: 1976, 1976 DATE: DIGI-KEY JOINT APPLICATION DIGI-KEY CORPORATION FEBRUARY 2018 JOB No. FIGURE THIEF RIVER FALLS, MN

SITE LOCATION MAP

0680C0945.004

01

MVP-2017-03282-LSP Page 2 of 4 WETLAND DITCH 3 AREA = 3,040FT²

WETLAND DITCH 4 AREA = 25,156FT²

EXISTING 24" RCP CULVERT

WETLAND DITCH 10 AREA = 24,340FT²

WETLAND DITCH 7 AREA = 20,181FT²

COUNTY HIGHWAY No. 16

WETLAND DITCH 2 AREA = 2,084FT²

COUNTY DITCH No. 70

WETLAND DITCH 9 AREA = 18,043FT²

SP-1A

WETLAND DITCH 6 AREA = 9,806FT²

WETLAND 2 AREA = 5,165FT²

SP-5A SP-1B SP-5B

WETLAND 1 AREA = 4,041FT²

WETLAND 3 AREA = 29,662FT² SP-4A

WETLAND DITCH 1 AREA = 10,897FT²

SP-4B

BARZEN AVENUE

WETLAND DITCH 8 AREA = 16,640FT²

ARCTIC CAT

SP-2B

DIGI-KEY PARKING LOT

SP-2A

SP-3B SP-3A

EXISTING STORMWATER POND CONSTRUCTED IN 2017 WETLAND DITCH 11 AREA = 4,705FT²

DIGI-KEY

ST

WETLAND DITCH 5 AREA = 9,139FT²

LEGEND

ST

DENOTES PROJECT AREA

WETLAND DITCH 12 AREA = 3,455FT² SP

DENOTES DELINEATED INCIDENTAL WETLANDS DENOTES DELINEATED WETLAND DITCH DENOTES SOIL TEST PIT LOCATION

160TH STREET

NORTH

© 2017 WIDSETH SMITH NOLTING

IMAGE: ESRI, INC.

0

250

( SCALE IN FEET )

DIGI-KEY JOINT APPLICATION DIGI-KEY CORPORATION THIEF RIVER FALLS, MN

EXISTING CONDITIONS MAP

DATE:

FEBRUARY 2018 JOB No.

0680C0945.004

FIGURE

02

MVP-2017-03282-LSP Page 3 of 4 PROPOSED STORMWATER POND

PROPOSED PARKING AREA

PROPOSED WAREHOUSE

PROPOSED PARKING AREA

PROPOSED LOADING DOCK ACCESS ROAD

BARZEN AVENUE

COUNTY HIGHWAY No. 16

PROPOSED CITY ROAD

PROPOSED STORMWATER PONDS

PROPOSED ACCELERATION LANE

PROPOSED BYPASS LANE

ARCTIC CAT

PROPOSED SIDEWALK(S)

PROPOSED OVERHEAD CONVEYOR

PROPOSED LOADING DOCK

PROPOSED STORMWATER POND EXTENSION

DIGI-KEY

PROPOSED TURN LANE EXISTING STORMWATER POND CONSTRUCTED IN 2017

LEGEND DENOTES PROJECT AREA DENOTES CONSTRUCTION LIMITS DENOTES DELINEATED INCIDENTAL WETLANDS DENOTES DELINEATED WETLAND DITCH

160TH STREET

NORTH

© 2017 WIDSETH SMITH NOLTING

IMAGE: ESRI, INC.

0

250

( SCALE IN FEET )

DIGI-KEY JOINT APPLICATION DIGI-KEY CORPORATION THIEF RIVER FALLS, MN

PROPOSED CONDITIONS MAP

DATE:

FEBRUARY 2018 JOB No.

0680C0945.004

FIGURE

03

COUNTY HIGHWAY No. 16

MVP-2017-03282-LSP Page 4 of 4

AREA A - FIGURE 04A

AREA B - FIGURE 04B

BARZEN AVENUE

ARTIC CAT

AREA C - FIGURE 04C

AREA D - FIGURE 04D

DIGI-KEY

PROPOSED STORMWATER POND EXTENSION

LEGEND DENOTES PROJECT AREA

EXISTING STORMWATER POND CONSTRUCTED IN 2017

DENOTES CONSTRUCTION LIMITS DENOTES DELINEATED INCIDENTAL WETLANDS DENOTES DELINEATED WETLAND DITCH DENOTES INCIDENTAL WETLAND IMPACTS - FILL DENOTES WETLAND DITCH IMPACTS - FILL DENOTES WETLAND DITCH IMPACTS - CUT

AREA E - FIGURE 04E

DENOTES STORM SEWER

160TH STREET NORTH

© 2017 WIDSETH SMITH NOLTING

IMAGE: ESRI, INC.

0

250

( SCALE IN FEET )

DIGI-KEY JOINT APPLICATION DIGI-KEY CORPORATION THIEF RIVER FALLS, MN

DATE:

FEBRUARY 2018 JOB No.

FIGURE

WETLAND IMPACT MAP - OVERVIEW0680C0945.004 04

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas