LETTER OF PERMISSION: The project involves expanding the existing Turtle-Flambeau dam system of dikes that creates the Turtle-Flambeau Flowage to meet current dam safety regulatory requirements. The proposed dike, referred to as Dike 10, would follow the existing alignment of Flambeau Dam Road from approximately Koshak Road to the Sportsman’s Landing.

PROJECT DESCRIPTION AND PURPOSE: The project involves expanding the existing Turtle-Flambeau dam system of dikes that creates the Turtle-Flambeau Flowage to meet current dam safety regulatory requirements. The proposed dike, referred to as Dike 10, would follow the existing alignment of Flambeau Dam Road from approximately Koshak Road to the Sportsman’s Landing.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas