Home

Omaha District

Run scraper

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The City of Missoula and Brennan's Wave Inc. is proposing to construct the Max Wave Project which includes modifications to the existing Flynn-Lowney irrigation diversion and construction of two recreational wave features with an aquatic organism passages along 800 feet of the Clark Fork River.

The City of Missoula and Brennan's Wave Inc. is proposing to construct the Max Wave Project which includes modifications to the existing Flynn-Lowney irrigation diversion and construction of two recreational wave features with an aquatic organism passages along 800 feet of the Clark Fork River.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas