RESIDENTIAL AND COMMERCIAL DEVELOPMENT IN ST. TAMMANY PARISH
NAME OF APPLICANT: Southern Lifestyle Development, c/o Hydrik Wetlands Consultants, 2323 Highway 190 East, Suite 2, Hammond, Louisiana.
LOCATION OF WORK: Project site is located off of Louisiana Highway 1077, north of Louisiana Highway 190, in Covington, Louisiana, in St. Tammany Parish, as shown on the attached drawings.
Latitude: 30.508458 Longitude: -90.205444
Hydrologic Unit Codes: 08070205 Lower Mississippi – Lake Maurepas.
CHARACTER OF WORK: Clear, grade, excavate, and fill to construct a residential/commercial development. The project will include 436-residential lots, 2-commercial lots and associated utilities, 2-detention ponds, 4-dry detention areas, roadways, and drainage infrastructure. The applicant proposed to contract with an approved mitigation bank in order to offset the adverse impact to jurisdictional wetlands.
The proposed 157.3 acre parcel was originally part of a larger project (MVN-2006-2971-EPP) that had been mitigated and authorized and recently sold by the previous permittee. The current design will directly impact 20.5 acres of jurisdictional wetlands. Previously 15.89 acres had been compensated for and; therefore, an additional 4.65 acres of jurisdictional wetlands previously avoided will be impacted by the proposed project design.
JOINT PUBLIC NOTICE
April 23, 2018
United States Army
Corps of Engineers
New Orleans District
Regulatory Branch, OD-SE
Room 280
7400 Leake Avenue
New Orleans, Louisiana 70118
(504) 862-1564
Stephanie.L.Castaing@usace.army.mil
Project Manager
Stephanie Castaing
Permit Application Number
MVN-2018-0314-EPP
State of Louisiana
Department of Environmental Quality
ATTN: Water Quality Certifications
Post Office Box 4313
Baton Rouge, Louisiana 70821-4313
(225) 219-3225
Project Manager
Elizabeth Hill
WQC Application Number
WQC 180409-02
Interested parties are hereby notified that a permit application has been received by the New
Orleans District of the U.S. Army Corps of Engineers pursuant to: [ ] Section 10 of the Rivers and
Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [X] Section 404 of the Clean
Water Act (86 Stat. 816; 33 USC 1344).
Application has also been made to the Louisiana Department of Environmental Quality, Water
Quality Certifications, for a Water Quality Certification (WQC) in accordance with statutory authority
contained in LRS30:2047 A(3), and provisions of Section 401 of the Clean Water Act (P.L.95-17).
RESIDENTIAL AND COMMERCIAL DEVELOPMENT IN ST. TAMMANY PARISH
NAME OF APPLICANT: Southern Lifestyle Development, c/o Hydrik Wetlands Consultants, 2323
Highway 190 East, Suite 2, Hammond, Louisiana.
LOCATION OF WORK: Project site is located off of Louisiana Highway 1077, north of Louisiana
Highway 190, in Covington, Louisiana, in St. Tammany Parish, as shown on the attached drawings.
Latitude: 30.508458
Longitude: -90.205444
Hydrologic Unit Codes: 08070205 Lower Mississippi Lake Maurepas.
CHARACTER OF WORK: Clear, grade, excavate, and fill to construct a residential/commercial
development. The project will include 436-residential lots, 2-commercial lots and associated utilities,
2-detention ponds, 4-dry detention areas, roadways, and drainage infrastructure. The applicant
proposed to contract with an approved mitigation bank in order to offset the adverse impact to
jurisdictional wetlands.
The proposed 157.3 acre parcel was originally part of a larger project (MVN-2006-2971-EPP) that
had been mitigated and authorized and recently sold by the previous permittee. The current design
will directly impact 20.5 acres of jurisdictional wetlands. Previously 15.89 acres had been
compensated for and; therefore, an additional 4.65 acres of jurisdictional wetlands previously avoided
will be impacted by the proposed project design.
-2The comment period for the Department of the Army Permit and the Louisiana Department of
Environmental Quality WQC will close 20 days from the date of this joint public notice. Written
comments, including suggestions for modifications or objections to the proposed work, stating
reasons thereof, are being solicited from anyone having interest in this permit and/or this WQC
request and must be mailed so as to be received before or by the last day of the comment period.
Letters concerning the Corps of Engineers permit application must reference the applicant's name
and the Permit Application Number, and be mailed to the Corps of Engineers at the address above,
ATTENTION: REGULATORY BRANCH. Similar letters concerning the Water Quality
Certification must reference the applicant's name and the WQC Application number and be mailed to
the Louisiana Department of Environmental Quality at the address above. Individuals or parties may
request an extension of time in which to comment on the proposed work by writing or e-mailing the
Corps of Engineers Project Manager listed above. Any request must be specific and substantively
supportive of the requested extension, and received by this office prior to the end of the initial
comment period. The Section Chief will review the request and the requestor will be promptly notified
of the decision to grant or deny the request. If granted, the time extension will be continuous to the
initial comment period and, inclusive of the initial comment period, will not exceed a total of 30
calendar days.
The application for this proposed project is on file with the Louisiana Department of Environmental
Quality and may be examined during weekdays between 8:00 a.m. and 4:30 p.m. Copies may be
obtained upon payment of costs of reproduction.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the probable impacts,
including cumulative impacts of the proposed activity on the public interest. That decision will reflect
the national concern for both protection and utilization of important resources. The benefit which
reasonably may be expected to accrue from the proposal must be balanced against its reasonably
foreseeable detriments. All factors which may be relevant to the proposal will be considered including
the cumulative effects thereof; among those are conservation, economics, aesthetics, general
environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards,
floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and
conservation, water quality, energy needs, safety, food and fiber production, mineral needs,
considerations of property ownership and, in general, the needs and welfare of the people.
The U.S. Army Corps of Engineers is soliciting comments from the public, federal, state, and local
agencies and officials, Indian Tribes, and other interested parties in order to consider and evaluate
the impacts of this proposed activity. Any comments received will be considered by the U.S. Army
Corps of Engineers to determine whether to make, modify, condition, or deny a permit for this
proposal. To make this decision, comments are used to assess impacts on endangered species,
historic properties, water quality, general environmental effects, and other public interest factors listed
above. Comments are used in the preparation of an Environmental Assessment and/or an
Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are
also used to determine the need for a public hearing and to determine the overall public interest of the
proposed activity.
The New Orleans District is unaware of properties listed on the National Register of Historic
Places near the proposed work. The possibility exists that the proposed work may damage or
destroy presently unknown archeological, scientific, prehistorical, historical sites, or data. Issuance of
this public notice solicits input from the State Archeologist and State Historic Preservation Officer
regarding potential impacts to cultural resources.
-3The New Orleans District has determined that the proposed activity will have no effect on the listed
endangered Dusky Gopher Frog (Rana sevosa) and threatened Gopher Tortoise (Gopherus
Polyphemus) based on the Standard Local Operating Procedure for Endangered Species of
Louisiana (SLOPES), dated October 22, 2014, between the U.S. Army Corps of Engineers and U.S.
Fish and Wildlife Service, Ecological Services Office.
Our initial finding is that the proposed work would not affect any species, nor affect any habitat
designated as critical to the survival and recovery of such species, listed as endangered by the U.S.
Department of Commerce.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the MagnusonStevens Fishery Conservation and Management Act. The applicant's proposal would result in the
destruction or alteration of 0.0 acres of EFH utilized by various life stages of red drum and penaeid
shrimp. Our initial determination is that the proposed action would not have a substantial adverse
impact on EFH or federally managed fisheries in the Gulf of Mexico. Our final determination relative
to project impacts and the need for mitigation measures is subject to review by and coordination with
the National Marine Fisheries Service.
If the proposed work involves deposits of dredged or fill material into navigable waters, the
evaluation of the probable impacts will include the application of guidelines established by the
Administrator of the Environmental Protection Agency. Also, a certification that the proposed activity
will not violate applicable water quality standards will be required from the Department of
Environmental Quality, Water Quality Certifications, before a permit is issued.
Any person may request, in writing, within the comment period specified in this notice, that a
public hearing be held to consider this application. Requests for public hearings shall state, with
particularity, the reasons for holding a public hearing.
You are requested to communicate the information contained in this notice to any other parties
whom you deem likely to have interest in the matter.
Michael V. Farabee
Chief, Eastern Evaluation Section
Enclosure
TO HAMMOND
W IDE
YS D
TR BLV
UN
CO
BFE
30°30'40.4" N
-90°11'36.95" W
37'
SITE
BFE
33'
WILSON
RD
25
OUTFALL PIPE
30°30'17.73" N
-90°11'37.07" W
30°30'14.75" N
-90°11'37.09" W
25
E
PIK
RN
TU
Goodbee
25
25
30°30'21.57" N
-90°12'12.3" W
TO COVINGTON
McGEE
RD
30°30'31.45" N
-90°12'19.16" W
WILKINSON
RD
TO FOLSOM
25
25
#
RD
25
BOOTLEGGER
RD
#
25
25
1
2
0
1 Mile
TO MADISONVILLE
#
25
#
HYDRIK
TO COVINGTON
TO HAMMOND
25
25
ST. TAMMANY
PARISH
25
Wetlands - GIS - Flood Control
WWW.HYDRIK.COM
30°30'30.45" N, -90°12'19.6" W
(985)429-0333
1693 BC
5-15-2017
1
LOW
N01°59'09"E
A
34'
TOTAL RESIDENTIAL LOTS = 436 - 71.57 AC.
TOTAL COMMERCIAL LOTS = 2 - 7.47 AC.
TOTAL ROAD / ALLEY LENGTH = 20,155 LIN. FT.
A
PROPOSED
DETENTION
POND
LEGEND:
PROJECT AREA = 157. 3 AC.
WETLANDS TO BE IMPACTED
VIA FILLING & GRADING
4.19 AC
2561.0'
34
FOREST
N85°28'54"W
OUTFALL PIPE
DRAINAGE FLOW - PRE DEVELOPMENT
DRAINAGE FLOW - POST DEVELOPMENT
AS FILLED NOW PRESERVED
1.178 AC
DRY
AREA
COMMERCIAL
PERMITTED 3.945 AC
DRY
DETENTION
McGEE RD (SIDE)
DRY
AS FILLED NOW EXCAVATED
1.54 AC
AS FILLED TO REMAIN
FILLED 14.07 AC
AS EXCAVATED TO REMAIN
EXCAVATED FOR OUTFALL
0.28 AC
34'
'
.34
E
39"
THIS SITE IS LOCATED IN FLOOD ZONE "A-4"
PER FEMA FLOOD INSURANCE RATE MAP
COMMUNITY PANEL NUMBER: 225205 0125C,
DATED 10-17-89, BASE FLOOD ELEVATION
FROM 31' TO 37'.
HYDRIK
LA URN
T
200'
100'
2
1.
116
N03°45'31"E 32.43'
94.11'
N86°42'59"W
85'
1 D
Y ER
W
H PIK
W
09"
38'
1°
N3
RE AL
TU CI
FU MMER 34'
CO
7
07
36'
480
1'
8°2
N5
PERMITTED
2.048 AC
'
.18 "E
201 21'39
8°
5
N
RESIDENTIAL
Base Drawings Provided By:
1"W
8'2
1°3 0'
3
N 13
RC
CO
SOAP & TALLOW BRANCH
ELEVATION / LINE
WALKING PATH
DETENTION
DETENTION
AREA
S89°53'42"E
37'
GREENSPACE AREA = 48.87 AC.
623.15'
FOREST
36'
IAL
E
MM
PROPOSED DETENTION POND
AREA = 7.76 AC
56'
36'
S89°42'33"E
"W
13'37
N15° 94.65'
2
PROPOSED DRY DETENTION
AREA 7.99 AC
WETLANDS ORIGINALLY PERMITTED AND
MITIGATED UNDER PERMIT MVN 2006-2971-EPP:
36'
"W
20'46
N15° 4.53'
19
WETLANDS TO REMAIN
PRESERVED 29.54 AC
B
B
AREA
PERMITTED
6.762 AC
'
34
BFE
WETLANDS TO BE IMPACTED
VIA EXCAVATION - 0.467 AC
'
AREA
DETENTION
2606.69'
PROPOSED
DETENTION
POND
36'
422.02'
NOTE:
E
AC
SP
RK
EN
E
PA
GR
IVE
S
S
PA
34'
455.83'
BFE
32'
W
&
SO
AP
FOREST
PROPOSED
DETENTION
AREA
L
ET
TA
L
W
S
D
AN
34'
FOREST
L
ET
OUTFALL PIPE
S89°23'16"W
S
D
AN
CH
AN
32'
BR
TOTAL WETLANDS PRESERVED = 30.718 AC
34'
FOREST
BF E
33'
2583.98'
BFE
34'
B FE
35'
BFE
36'
S00°16'09"E
Wetlands - GIS - Flood Control
0'
400'
WWW.HYDRIK.COM
1693 BC
5-15-2017
(985)429-0333
SITE
Y
HW
Y
19
0
HW
77
10
NOT A PART
LEGEND:
PROJECT BOUNDARY
157.3 ACRES
3
1693 BC
44
BASE FLOOD
TOP BANK
TOP BANK
GRADE
PROPOSED
DRIVEWAY
BFE = 34.0'
34
24
CULVERT
14
EXISTING
GRADE
1
AREA TO
BE FILLED
3
44
34
3
1
24
14
SEE FIGURE 5
FOR STREET DETAIL
(DETAIL 4B1)
AREA TO
EXCAVATED
ELEVATION - N.G.V.D
PROPERTY LINE
PROPERTY LINE
STREET "C"
C
L
PROPERTY LINE
ELEVATION - N.G.V.D
PROPOSED
RESIDENTIAL
SLAB
PROPOSED
PROPOSED
DETENTION POND
WETLANDS
TO BE IMPACTED
PREVIOUSLY PERMITTED
SECTION A-A
PROFILE VIEW
100'
50'
0'
100'
HYDRIK
AREA TO BE FILLED
AREA TO BE EXCAVATED
PROPOSED GRADE
EXISTING GRADE
Wetlands - GIS - Flood Control
WWW.HYDRIK.COM
(985)429-0333
1693
BC
5-15-2017
4A
44
BASE FLOOD
BFE = 34.0'
44
34
CULVERT
EXISTING
GRADE
SEE FIGURE 5
FOR STREET DETAIL
(DETAIL 4B1)
AREA TO
BE FILLED
WETLANDS
24
PREVIOUSLY PERMITTED
34
1
24
3
ELEVATION - N.G.V.D
GRADE
PROPOSED
DRIVEWAY
PROJECT BOUNDARY
TOP BANK
PROPERTY LINE
PROPERTY LINE
C
L STREET "C"
PROPERTY LINE
ELEVATION - N.G.V.D
PROPOSED
RESIDENTIAL
SLAB
PROPOSED
AREA TO
EXCAVATED
PROPOSED
DETENTION AREA
WETLANDS
TO BE IMPACTED
SECTION B-B
PROFILE VIEW
100'
50'
0'
100'
HYDRIK
Wetlands - GIS - Flood Control
AREA TO BE FILLED
AREA TO BE EXCAVATED
PROPOSED GRADE
EXISTING GRADE
WWW.HYDRIK.COM
(985)429-0333
1693 BC
5-15-2017
4B
WIDTH VARIES
6'-0"
MEDIAN
20'-0"
TRAVEL LANE
5'-0"
SHOULDER
2'-3'
BOTTOM
14'-0"
TRAVEL LANE
2.5%
5'-0"
WIDTH VARIES
SHOULDER
2'-3'
BOTTOM
2.5%
3'
MIN.
REQ'D DITCH
EXCAVATION
& EMBANKMENT
(3:1 SLOPES)
REQ'D DITCH
EXCAVATION
& EMBANKMENT
(3:1 SLOPES)
8" PVC
WATER MAIN
80' ROADWAY ENTRANCE PROFILE
RIGHT-OF-WAY
PROPERTY LINE
RIGHT-OF-WAY
PROPERTY LINE
80'-0"
RIGHT-OF-WAY
2'-0"
NOT TO SCALE
60' RIGHT-OF-WAY
24' PAVED SECTION
WIDTH VARIES
4'
2'-3'
SHOULDER
BOTTOM
SEWER
MANHOLE
3'-0"
8" PVC
SEWER MAIN
4B1
12'
TRAVEL LANE
3" ASPHALT
2.0%
REQ'D DITCH
EXCAVATION
& EMBANKMENT
(3:1 SLOPES)
20'
WIDTH VARIES
4'
2'-3'
SHOULDER
BOTTOM
2.0%
REQ'D DITCH
EXCAVATION
& EMBANKMENT
(3:1 SLOPES)
10" SOIL CEMENT/
LIME BASE
8" PVC
WATER MAIN
4B1
60'
130'
HYDRIK
Wetlands - GIS - Flood Control
20'
STREET
2'-0"
NOT TO SCALE
5'
130'
12'
TRAVEL LANE
DETAIL 4B1
60' TYPICAL ROADWAY PROFILE
60'
5'
RIGHT-OF-WAY
PROPERTY LINE
3'-0"
MIN.
CL
ROAD
RIGHT-OF-WAY
PROPERTY LINE
WWW.HYDRIK.COM
STREET
TYPICAL LOT LAYOUT
TYPICAL LOT DRAINAGE
NOT TO SCALE
NOT TO SCALE
LOT DIMENSIONS VARIES
LOT DIMENSIONS VARIES
(985)429-0333
1693 BC
5-15-2017
5
EXISTING
GRADE
32'
42'
PROPOSED
DETENTION POND
32'
1
1
3
3
22'
22'
AREA TO BE
EXCAVATED
VARIES
ELEVATION - N.G.V.D
ELEVATION - N.G.V.D
42'
TYPICAL DETENTION POND
TYPICAL SECTION
NOT TO SCALE
AREA TO BE EXCAVATED
PROPOSED GRADE
EXISTING GRADE
NOTE:
AMOUNTS TO BE EXCAVATED FOR DETENTION AREAS:
- DRY DETENTION AREAS = 3,857 CU. YDS.
- DETENTION PONDS = 22,300 CU. YDS.