The applicant proposes to discharge fill material.

Full Public Notice Proposed Project Plans PROJECT DESCRIPTION: The applicant proposes to discharge fill material into waters of the U.S. during the construction and installation of a 2.25-mile-long siding track, adjacent to the existing mainline track. The applicant proposes to fill nine wetlands and four stream segments to complete the following activities: 1) to replace track culverts at three locations; 2) to replace a bridge with a culvert; 3) to install one non-track culvert; 4) to construct two turnout pads; 5) to install trackside swales; 6) to install a crossing over siding track; 7) to construct a shore access road originating from a private road crossing at the southern end of the project; 8) to construct an access driveway from FM 1413 to the turnout pad; and 9) to relocate fencing to accommodate acquisition of right-of-way (ROW).

Feature Impact Summary for the Union Pacific – 2.25 mile-long Esperson Siding Track Project –Liberty County, Texas Project Resource ID Feature Type Temporary Construction Impacts (Acres/ Linear Feet) Permanent Conversion (Fill) (Acres/ Linear Feet) Project Component W002 PSS1 0 acre 0.41 acre Siding track, turnout pad W004 PSS1 0 acre 0.27 acre Siding track W005 PFO1 0 acre 0.03 acre Culvert protection, riprap W006 PEM1 0 acre 0.05 acre Siding track W008 PSS1 0 acre 0.02 acre Culvert installation W009 PSS1 0 acre 0.19 acre Siding track, culvert installation W010 PSS1 0 acre 0.02 acre Siding track W011 PSS1 0 acre 0.14 acre drainage W012 PSS1 0 acre 0.17 acre Siding track, drainage S003 Perennial/R2UB3 0.16 acre/157 LF 0.07 acre/ 107 LF Culvert installation S004 Ephemeral/R6 0.00 acre <0.01 acre/ 33 LF Culvert installation S006 Ephemeral/R6 <0.01 acre/1 LF 0.00 acre Temporary construction workspace S007 Manmade Pond/PUB3 0.02 acre/90 LF 0.00 acre Temporary construction workspace

*Acreage total inclusive of wetlands and manmade ponds

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice