Proposal to construct a shoreline protection system in Lake Michigan at 595 Circle Lane in Lake Forest, Lake County, Illinois.

PUBLIC NOTICE

APPLICATION FOR PERMIT

U.S. ArmyCorps of Engineers Chicago District

Public Notice/Application Number: LRC-2016-603

Comment Period BEGINS: April 19, 2018 Comment Period Expires: May 21, 2018

U.S. Army Corps of Engineers

Applicant Terry Rozdolsky 595 Circle Lane Lake Forest, Illinois 60045

Proposed Action Proposal to construct a shoreline protection system in Lake Michigan (See attached drawings). A detailed description of this proposal is provided on page 2 of this notice.

Location of Proposed Action 595 Circle Lane in Lake Forest, Lake County, Illinois (Latitude 42.23055, Longitude -87.81194).

Interested parties are hereby notified that an application has been received for a Department of the Army permit for the activity described herein and as shown on the attached drawings. You are invited to provide your comments by May 21, 2018 on the proposed work, which will become part of the record and will be considered in the decision. A permit will be issued or denied under Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403) and Section 404 Action of the Clean Water Act of 1972(33 U.S.C. 1344).

Written comments shall be mailed to:

U.S. Army Corps of Engineers Chicago District, Regulatory Branch Attn: LRC-2016-603, Mr. Soren Hall 231 South LaSalle Street, Suite 1500 Chicago, Illinois 60604-1437

It should be noted that ALL comments received by this office (via hard copy or electronic) will only be accepted with the full name and address, and email address, if available of the individual commenting, and must be received by the close of the public notice period. Electronic comments may be sent to the project manager at Soren.G.Hall@usace.army.mil.

Project Description The proposed project includes stabilization of 520 feet of shoreline along Lake Michigan. The north 190 feet of lakefront contains an existing undersized revetment with vegetative cover above. The existing slope has evidence of slope creep and slips. The south 330 feet of lakefront is actively eroding bluff as much as 70 feet high. This section of shoreline has been unprotected and has eroded 30-50 feet over the last several years.

The proposed project would include reestablishing a stable bluff slope in the south segment, installation of a revetment along the entire shoreline, the construction of a breakwater protected beach cell in the northern segment, and accommodate access to the water through the proposed access ramp and beach. The proposed work would preserve the exiting slope in the north segment without alteration. The southern segment of eroding bluff would be reestablished at a slope of 2.25:1 to 2:1.

According to the application materials, the proposed beach cell in the north segment would allow wave energy to be absorbed over the leading breakwater and crash on to the created beach before impacting the proposed restructured revetment along the edge of the bluff. This would reduce the potential for lowering of the lake bed due to erosion that can occur with a standalone stone revetment. The beach cell would also partially protect the southern segment of shoreline by deflecting the largest waves that come out of the north / northwest. This would also reduce the potential for lake bottom erosion in front of the proposed south parcel revetment. The slope regrading would straighten the shoreline that is currently concave and further reduce the wave focusing energy that is occurring in this location.

The total fill for this work below the ordinary high water mark (OHWM) elevation of 582.03’ NAVD88 would be 0.76 acres. Mitigation is proposed to be purchased from a wetland mitigation bank at a ratio of 3:1 for a total of 2.28 acres of required mitigation.

The beach cell and the area north of the proposed quarrystone groin would capture sand from the littoral drift if not prefilled. Therefore, these areas would be prefilled with 1800 cubic yards of sand, which included 20% overfill.

Access for the property owner would be provided through the construction of the ramp and the breakwater protected beach. This ramp is large enough to provide access to the water for small watercraft, but not for a boat. Access over the north groin would be provided with the inclusion of stairs constructed over the groin. Access would also be provided along the top west edge of the stone revetment to the south end of the property where another set of stone steps would be constructed.

Avoidance & Minimization The applicant has stated the following concerning avoidance and minimization of impacts to Waters of the United States: Fill will be limited to the extent required to create a safe and stable slope within the specific areas indicated on the attached plans.

Mitigation The applicant has stated the following concerning compensatory mitigation for unavoidable impacts to Waters of the United States: To compensate for the proposed 0.76 acres of fill, 2.28 acres of wetland mitigation credits will be purchased from a Corps approved bank.

The Corps has not verified the adequacy of this mitigation proposal at this time and will make the final determination on whether the proposed mitigation is appropriate and practicable in accordance with 33 CFR Part 332.

Regulatory Authority This proposed action will be reviewed according to the provisions of Section 10 of the Rivers and Harbors Act of 1899 and Section 404 of the Clean Water Act of 1972.

Jurisdiction This application will be reviewed according to the provisions of Section 10 of the Rivers and Harbors Act of 1899 and Section 404 of the Clean Water Act of 1972 due to placement of fill in Lake Michigan. Lake Michigan is a traditional navigable water and is therefore jurisdictional.

Evaluation Factors The decision whether to issue a permit will be based on an evaluation of probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments.

All factors which may be relevant to the proposal will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the people. In addition, if the proposed activity involves the discharge of dredged or fill material into waters of the United States, the evaluation of the impact on the public interest will include application of Section 404(b)(1) guidelines (40 CFR 230) promulgated by the U.S. Environmental Protection Agency.

The Corps of Engineers is also soliciting comments from the public, Federal, state and local agencies, Indian tribes, and other interested parties in order to consider and evaluate the potential impacts of the proposed activity. Once this office completes a review of the comments received, it will be determined whether to issue, modify, condition, or deny a permit for this proposal.

To prepare this decision, comments are taken into consideration to assess impacts on the public interest factors listed above, as well as endangered species, historic properties, water quality, and general environmental effects. Comments will be used in the preparation of an Environmental Assessment and/or Environmental Impact Statement pursuant to the National Environmental Policy Act. A determination concerning the need for a public hearing will also be based on the comments received.

Preliminary Evaluation of Selected Factors

Water Quality: The applicant has applied to the Illinois Environmental Protection Agency (IEPA) for water quality certification, or waiver thereof, for the proposed activity in accordance with Section 401 of the Clean Water Act. Certification or waiver indicates that the IEPA believes the activity will not violate applicable water quality standards. The review by the IEPA is conducted in accordance with the Illinois water quality standards under 35 Illinois Administrative Code Subtitle C by providing an antidegradation assessment, which includes an evaluation of alternatives to any proposed increase in pollutant loading that may result from this activity.

The "Fact Sheet" containing the antidegradation assessment for this proposed project may be found on the IEPA's web site, at www.epa.state.il.us/public-notices/. In the event that the IEPA is unable to publish the "Fact Sheet" corresponding to the timeframe of this Joint Public Notice, a separate public notice and "Fact Sheet" will be published by the IEPA at the web site identified above. You may also obtain a copy of the "Fact Sheet" by contacting the IEPA at the address or telephone number shown below.

Written comments concerning possible impacts to water quality should be addressed to the following agency, along with a copy of the comments provided to the Corps of Engineers:

Illinois Environmental Protection Agency Bureau of Water Watershed Management Section 1021 N. Grand Avenue East P.O. Box 19276 Springfield, Illinois 62794-9276

If you have any questions please contact the IEPA at (217) 782-3362.

Department of Natural Resources: The applicant has applied to the Illinois Department of Natural, Office of Water Resources (IDNR-OWR) for a permit pursuant to the State of Illinois Rivers, Lake and Streams Act (615 ILCS 5). Comments concerning the IDNR-OWR permit should be addressed to the following agency, along with a copy of the comments provided to the Corps of Engineers:

Illinois Department of Natural Resources Office of Water Resources Michael A. Bilandic Building 160 N. LaSalle Street, Suite S-700 Chicago, IL 60601

If you have any questions please contact the IDNR at (312) 793-5947.

Endangered and Threatened Species: The Corps of Engineers has determined that the proposed activity would not affect any federally-listed endangered or threatened species or critical habitat for any endangered or threatened species, pursuant to the Endangered Species Act of 1973, as amended (16 U.S.C. 1531 et seq.). Therefore, consultation with the U.S. Fish and Wildlife Service pursuant to Section 7 of the Endangered Species Act does not appear to be warranted at this time.

Historic Properties/Cultural Resources: Preliminary review indicates that the proposed activity is not likely to adversely affect any historic property which is listed, or eligible for listing, on the National Register of Historic Places.

Environmental Impact Statement A preliminary determination has been made that an environmental impact statement is not required for the proposed work.

Public Hearing Any person may request in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for public hearing shall state with particularity the reasons for holding a public hearing. A request for a hearing may be denied if substantive reasons for holding a hearing are not provided or if there is otherwise no valid interest to be served.

It should be noted that materials submitted as part of the permit application become part of the public record and are thus available to the general public under the procedures of the Freedom of Information Act (FOIA). Individuals may submit a written request to obtain materials under FOIA or make an appointment to view the project file at the Chicago District Corps of Engineers Office of Counsel.

Interested parties wishing to comment on the proposed activity must do so in writing no later than May 21, 2018. It is presumed that all parties receiving this notice will wish to respond to this public notice; therefore, a lack of response will be interpreted as meaning that there is no objection to the project as described.

This public notice is not a paid advertisement and is for public information only. Issuance of this notice does not imply Corps of Engineers endorsement of the project as described.

If you have any questions, please contact Mr. Soren Hall of my staff by telephone at (312) 846-5532, or email at Soren.G.Hall@usace.army.mil. It should be noted that ALL comments received by this office (via hard copy or electronic) will only be accepted with the full name and address of the individual commenting. You can also visit our website at http://www.lrc.usace.army.mil/Missions/Regulatory.aspx for more information on our program.

FOR THE DISTRICT COMMANDER:

Original Signed

Kathleen G. Chernich Chief, East Section Regulatory Branch

PUBLIC NOTICE APPLICATION FOR PERMIT U.S. ARMY CORPS OF ENGINEERS CHICAGO DISTRICT

PUBLIC NOTICE/APPLICATION NUMBER: LRC-2016-00603 COMMENT PERIOD BEGINS: April 19, 2018 COMMENT PERIOD EXPIRES: May 21, 2018 U.S. Army Corps of Engineers APPLICANT Terry Rozdolsky 595 Circle Lane Lake Forest, Illinois 60045 PROPOSED ACTION Proposal to construct a shoreline protection system in Lake Michigan (See attached drawings). A detailed description of this proposal is provided on page 2 of this notice. LOCATION OF PROPOSED ACTION 595 Circle Lane in Lake Forest, Lake County, Illinois (Latitude 42.23055, Longitude -87.81194). Interested parties are hereby notified that an application has been received for a Department of the Army permit for the activity described herein and as shown on the attached drawings. You are invited to provide your comments by May 21, 2018 on the proposed work, which will become part of the record and will be considered in the decision. A permit will be issued or denied under Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403) and Section 404 Action of the Clean Water Act of 1972(33 U.S.C. 1344). Written comments shall be mailed to: U.S. Army Corps of Engineers Chicago District, Regulatory Branch Attn: LRC-2016-00603, Mr. Soren Hall 231 South LaSalle Street, Suite 1500 Chicago, Illinois 60604-1437

-2It should be noted that ALL comments received by this office (via hard copy or electronic) will only be accepted with the full name and address, and email address, if available of the individual commenting, and must be received by the close of the public notice period. Electronic comments may be sent to the project manager at Soren.G.Hall@usace.army.mil. PROJECT DESCRIPTION The proposed project includes stabilization of 520 feet of shoreline along Lake Michigan. The north 190 feet of lakefront contains an existing undersized revetment with vegetative cover above. The existing slope has evidence of slope creep and slips. The south 330 feet of lakefront is actively eroding bluff as much as 70 feet high. This section of shoreline has been unprotected and has eroded 30-50 feet over the last several years. The proposed project would include reestablishing a stable bluff slope in the south segment, installation of a revetment along the entire shoreline, the construction of a breakwater protected beach cell in the northern segment, and accommodate access to the water through the proposed access ramp and beach. The proposed work would preserve the exiting slope in the north segment without alteration. The southern segment of eroding bluff would be reestablished at a slope of 2.25:1 to 2:1. According to the application materials, the proposed beach cell in the north segment would allow wave energy to be absorbed over the leading breakwater and crash on to the created beach before impacting the proposed restructured revetment along the edge of the bluff. This would reduce the potential for lowering of the lake bed due to erosion that can occur with a standalone stone revetment. The beach cell would also partially protect the southern segment of shoreline by deflecting the largest waves that come out of the north / northwest. This would also reduce the potential for lake bottom erosion in front of the proposed south parcel revetment. The slope regrading would straighten the shoreline that is currently concave and further reduce the wave focusing energy that is occurring in this location. The total fill for this work below the ordinary high water mark (OHWM) elevation of 582.03' NAVD88 would be 0.76 acres. Mitigation is proposed to be purchased from a wetland mitigation bank at a ratio of 3:1 for a total of 2.28 acres of required mitigation. The beach cell and the area north of the proposed quarrystone groin would capture sand from the littoral drift if not prefilled. Therefore, these areas would be prefilled with 1800 cubic yards of sand, which included 20% overfill. Access for the property owner would be provided through the construction of the ramp and the breakwater protected beach. This ramp is large enough to provide access to the water for small watercraft, but not for a boat. Access over the north groin would be provided with the inclusion of stairs constructed over the groin. Access would also be provided along the top west edge of the stone revetment to the south end of the property where another set of stone steps would be constructed.

-3AVOIDANCE & MINIMIZATION The applicant has stated the following concerning avoidance and minimization of impacts to Waters of the United States: Fill will be limited to the extent required to create a safe and stable slope within the specific areas indicated on the attached plans. MITIGATION The applicant has stated the following concerning compensatory mitigation for unavoidable impacts to Waters of the United States: To compensate for the proposed 0.76 acres of fill, 2.28 acres of wetland mitigation credits will be purchased from a Corps approved bank. The Corps has not verified the adequacy of this mitigation proposal at this time and will make the final determination on whether the proposed mitigation is appropriate and practicable in accordance with 33 CFR Part 332. REGULATORY AUTHORITY This proposed action will be reviewed according to the provisions of Section 10 of the Rivers and Harbors Act of 1899 and Section 404 of the Clean Water Act of 1972. JURISDICTION This application will be reviewed according to the provisions of Section 10 of the Rivers and Harbors Act of 1899 and Section 404 of the Clean Water Act of 1972 due to placement of fill in Lake Michigan. Lake Michigan is a traditional navigable water and is therefore jurisdictional. EVALUATION FACTORS The decision whether to issue a permit will be based on an evaluation of probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the people. In addition, if the proposed activity involves the discharge of dredged or fill material into waters of the United States, the evaluation of the impact on the public interest will include application of Section 404(b)(1) guidelines (40 CFR 230) promulgated by the U.S. Environmental Protection Agency. The Corps of Engineers is also soliciting comments from the public, Federal, state and local agencies, Indian tribes, and other interested parties in order to consider and evaluate the potential impacts of the proposed activity. Once this office completes a review of the comments received, it will be determined whether to issue, modify, condition, or deny a permit for this proposal.

-4To prepare this decision, comments are taken into consideration to assess impacts on the public interest factors listed above, as well as endangered species, historic properties, water quality, and general environmental effects. Comments will be used in the preparation of an Environmental Assessment and/or Environmental Impact Statement pursuant to the National Environmental Policy Act. A determination concerning the need for a public hearing will also be based on the comments received. PRELIMINARY EVALUATION OF SELECTED FACTORS WATER QUALITY: The applicant has applied to the Illinois Environmental Protection Agency (IEPA) for water quality certification, or waiver thereof, for the proposed activity in accordance with Section 401 of the Clean Water Act. Certification or waiver indicates that the IEPA believes the activity will not violate applicable water quality standards. The review by the IEPA is conducted in accordance with the Illinois water quality standards under 35 Illinois Administrative Code Subtitle C by providing an antidegradation assessment, which includes an evaluation of alternatives to any proposed increase in pollutant loading that may result from this activity. The "Fact Sheet" containing the antidegradation assessment for this proposed project may be found on the IEPA's web site, at www.epa.state.il.us/public-notices/. In the event that the IEPA is unable to publish the "Fact Sheet" corresponding to the timeframe of this Joint Public Notice, a separate public notice and "Fact Sheet" will be published by the IEPA at the web site identified above. You may also obtain a copy of the "Fact Sheet" by contacting the IEPA at the address or telephone number shown below. Written comments concerning possible impacts to water quality should be addressed to the following agency, along with a copy of the comments provided to the Corps of Engineers: Illinois Environmental Protection Agency Bureau of Water Watershed Management Section 1021 N. Grand Avenue East P.O. Box 19276 Springfield, Illinois 62794-9276 If you have any questions please contact the IEPA at (217) 782-3362. DEPARTMENT OF NATURAL RESOURCES: The applicant has applied to the Illinois Department of Natural, Office of Water Resources (IDNR-OWR) for a permit pursuant to the State of Illinois Rivers, Lake and Streams Act (615 ILCS 5). Comments concerning the IDNR-OWR permit should be addressed to the following agency, along with a copy of the comments provided to the Corps of Engineers: Illinois Department of Natural Resources Office of Water Resources Michael A. Bilandic Building

-5160 N. LaSalle Street, Suite S-700 Chicago, IL 60601 If you have any questions please contact the IDNR at (312) 793-5947. ENDANGERED AND THREATENED SPECIES: The Corps of Engineers has determined that the proposed activity would not affect any federallylisted endangered or threatened species or critical habitat for any endangered or threatened species, pursuant to the Endangered Species Act of 1973, as amended (16 U.S.C. 1531 et seq.). Therefore, consultation with the U.S. Fish and Wildlife Service pursuant to Section 7 of the Endangered Species Act does not appear to be warranted at this time. HISTORIC PROPERTIES/CULTURAL RESOURCES: Preliminary review indicates that the proposed activity is not likely to adversely affect any historic property which is listed, or eligible for listing, on the National Register of Historic Places. ENVIRONMENTAL IMPACT STATEMENT A preliminary determination has been made that an environmental impact statement is not required for the proposed work. PUBLIC HEARING Any person may request in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for public hearing shall state with particularity the reasons for holding a public hearing. A request for a hearing may be denied if substantive reasons for holding a hearing are not provided or if there is otherwise no valid interest to be served. It should be noted that materials submitted as part of the permit application become part of the public record and are thus available to the general public under the procedures of the Freedom of Information Act (FOIA). Individuals may submit a written request to obtain materials under FOIA or make an appointment to view the project file at the Chicago District Corps of Engineers Office of Counsel. Interested parties wishing to comment on the proposed activity must do so in writing no later than May 21, 2018. It is presumed that all parties receiving this notice will wish to respond to this public notice; therefore, a lack of response will be interpreted as meaning that there is no objection to the project as described. This public notice is not a paid advertisement and is for public information only. Issuance of this notice does not imply Corps of Engineers endorsement of the project as described. If you have any questions, please contact Mr. Soren Hall of my staff by telephone at (312) 8465532, or email at Soren.G.Hall@usace.army.mil. It should be noted that ALL comments received by this office (via hard copy or electronic) will only be accepted with the full name

-6and address of the individual commenting. You can also visit our website at http://www.lrc.usace.army.mil/Missions/Regulatory.aspx for more information on our program.

FOR THE DISTRICT COMMANDER: ORIGINAL SIGNED

Kathleen G. Chernich Chief, East Section Regulatory Branch

ARCH D 24" x 36"

INLET RIM: 654.72 INV: 650.22

| | W

| W |

| W |

| W |

N

| W |

26

@

1.0

%

53

CEDBOX CEDBOX

CEDBOX 657.39 657.04 55 54 657.13

DR

Approved:_____

CS PV

SCALE: 1" = 30'

30

60

ROZDOLSKY RESIDENCE

| W

|

Checked:_____

0

C.O.

10" PVC SDR 26

CLIENT

TERRY ROZDOLSKY C.O.

| W

@ 1.0%

Stone Wall

|

Designer: _____

R 26 C SD 6" PV

| W |

CATCH BASIN RIM: 652.10 INV: 648.35

TRENCH DRAIN W/ BACKFLOW PREVENTER RIM: 640.60 INV: 637.75

MANHOLE RIM: 655.40 INV: 638.75

30

10"

K

CATCH BASIN RIM: 650.50 INV: 647.90 (10" W) IMV: 637.00 (12" E)

Y CU T

2" | | W

PROJECT

6"

L595 CIRCLE LN LAKE FOREST, IL 60045 PV

C

SD

| W

Project Management Initials:

R

|

6"

PV C

26

@

1. 0%

CONSULTANT

SD R2

6@

1.0

%

12 "

C

SD

R

26

@

AECOM 303 E. WACKER DRIVE SUITE 1400 312.373.7700 tel 312.373.6800 fax www.aecom.com

CATCH BASIN RIM: 648.00 INV: 645.60

PV

1. 0

%

8"

PV

C

SD

R

26

@

1.

0%

STMH RIM: 652.36

CATCH BASIN RIM: 648.00 INV: 634.80 (12" W)

SOUTH PARCEL

NORTH PARCEL

STMH RIM: 649.35

Raised Planter

E DP

"H

650

6

2.25:1

conc.

brick

2:1

2.25:1

0 C9

649

12

Stone Retaining Wall

Stone Steps

648

640 2:1

2.25:1

640

630 2.25:1

2:1

630 2.25:1

620

620

2:1

2.25:1

2.25:1

2.25:1

3.5:1

59

600

600

600 2:1

0 59

590

5

586

588

2:1

590

FLAT ARMOR STONE ACCESS

595

88

586

582

586

LIMIT OF SAND ACCRETION

81

ACCESS RAM P

5

ISSUE/REVISION

A

2018-02-26

I/R

DATE

FOR PERMIT DESCRIPTION

582

0

581 580

1.5:1

58

9

57

578 584

57

7

LIMIT OF SAND ACRETION

M C2

576

PLACE 1,800 CUBIC YARDS OF SAND BEACH NOURISHMENT

584

PROJECT NUMBER

60529863

IDNR LIMIT FOR OFFSHORE CONSTRUCTION

SHEET TITLE

PROPOSED PLAN TOP OF ROCK EL 577.76 G C2

Last saved by: PASQUESIS(2018-02-26) Last Plotted: 2018-02-27 Filename: P:\60529863\900_CAD_GIS\910_CAD\20-SHEETS\C\60529863_C-02.DWG

57 6

Concrete Structure

X

TOTAL STONE FILL BELOW OHWM = 0.76 ACRES

C C2

Printed on ___% Post-Consumer Recycled Content Paper

LIMIT OF SAND ACRETION

588

ORDINARY HIGH WATER MARK ELEVATION 582.03 NAVD88 EXISTING TOE OF BLUFF

FLAT ARMOR STONE ACCESS

590

582

1.5:1

2:1

610

610

5

STONE BLANKET ARMOR 1.5:1

2.25:1

2.25:1

610

59 0 58 6

2:1

2:1

2:1

620

SHEET NUMBER

C-02

ELEVATION

655.0

650.0

650.0

645.0

645.0

640.0

640.0

635.0

635.0

630.0

630.0

625.0

625.0

620.0

620.0

615.0

615.0

610.0

610.0

605.0

605.0

PROJECT

ROZDOLSKY RESIDENCE

CLIENT

ELEVATION

ARCH D 24" x 36" Approved:_____ Checked:_____ Designer: _____ Project Management Initials:

655.0

TERRY ROZDOLSKY L595 CIRCLE LN LAKE FOREST, IL 60045

CONSULTANT

600.0

600.0

595.0

595.0

590.0

590.0

585.0

585.0

580.0

580.0 1.5'

575.0

575.0

570.0 0+00

AECOM 303 E. WACKER DRIVE SUITE 1400 312.373.7700 tel 312.373.6800 fax www.aecom.com

570.0 0+10

0+20

0+30

0+40

0+50

0+60

0+70

0+80

0+90

1+00

1+10

1+20

1+30

1+40

1+50

1+60

1+70

1+80

1+90

2+00

2+10

2+20

2+30

2+40

2+50

2+60

2+70

2+802+84

STATION C C2

SECTION SCALE: 1:10

590.0

10

590.0

585.0

585.0

9.6'

580.0

580.0

0 10 VERT SCALE 1"=10'

20 20

ELEVATION

ELEVATION

10

HORIZ SCALE 1"=10' 0 10

1.5'

575.0

575.0

0+00

0+10

0+20

0+30

0+40

0+50

0+60

0+70

0+80

0+88

STATION

Printed on ___% Post-Consumer Recycled Content Paper

SECTION SCALE: 1:5

630.0

630.0

625.0

625.0

620.0

620.0

615.0

615.0

610.0

610.0

605.0

605.0

600.0

600.0

595.0

595.0

590.0

590.0

ISSUE/REVISION

ELEVATION

ELEVATION

Last saved by: PASQUESIS(2018-02-26) Last Plotted: 2018-02-27 Filename: P:\60529863\900_CAD_GIS\910_CAD\20-SHEETS\C\60529863_C-03_CROSS SECTIONS.DWG

M C2

A

2018-02-26

I/R

DATE

FOR PERMIT DESCRIPTION

9.6'

585.0

585.0

580.0

580.0 1.5'

575.0

575.0

570.0 0+00

570.0 0+10

0+20

0+30

0+40

0+50

0+60

0+70

0+80

0+90

1+00

1+10

1+20

1+30

1+40

1+50

1+60

1+70

1+80

1+90

2+00

2+10

2+20

2+30

2+40

2+50

2+59

PROJECT NUMBER

60529863 SHEET TITLE

SECTIONS I

STATION G C2

SECTION SCALE: 1:10

SHEET NUMBER

C-03

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas