The Los Angeles District, U. S. Army Corps of Engineers (Corps) is preparing an Environmental
The Los Angeles District, U. S. Army Corps of Engineers (Corps) is preparing an Environmental Assessment (EA) for the proposed widening of the Sweetwater River bridges on Interstate 805 (I-805) in San Diego County, between Chula Vista and National City. The State of California, Department of Transportation (CalTrans), has proposed to widen the freeway bridges crossing over the Sweetwater River. These improvements would also necessitate the need to construct new pier walls to support the extended bridge structure. The San Diego County, Department of Public Works (DPW) and the San Diego County Flood Control District would act as the non-Federal sponsor and operator of this facility. Accordingly, this EA is being prepared in response to an application by CalTrans for a Rivers and Harbors Act of 1899 (33 U.S.C. 403 et seq.) Section 408 permit to modify an existing Corps’ project, the Sweetwater River Channel Levee System.
All comments must be received by 5 p.m. on May 17, 2018.
If you have questions or would like additional information, please contact Mr.Ian Bordenave at (213) 452-3874.
PUBLIC NOTICE
_________________________________________________________________________________________
PUBLIC NOTICE OF PROPOSED ACTIVITY AND PREPARATION OF
ENVIRONMENTAL ASSESSMENT
W IDEN ING O F TH E S W EETW ATER RIV ER BR IDG ES ON INTER S TATE 8 0 5 ,
S AN D IEGO C OU N TY, C A LIFOR N IA.
U.S. ARMY CORPS OF ENGINEERS
LOS ANGELES DISTRICT
BUILDING STRONG®
Comment Period: April 17, 2018 to May 17, 2018
Direct comments to: Mr. Ian Bordenave
The Los Angeles District, U. S. Army Corps of Engineers (Corps) is preparing an Environmental
Assessment (EA) for the proposed widening of the Sweetwater River bridges on Interstate 805 (I-805)
in San Diego County, between Chula Vista and National City. The State of California, Department of
Transportation (CalTrans), has proposed to widen the freeway bridges crossing over the Sweetwater
River. These improvements would also necessitate the need to construct new pier walls to support the
extended bridge structure. The San Diego County, Department of Public Works (DPW) and the San
Diego County Flood Control District would act as the non-Federal sponsor and operator of this facility.
Accordingly, this EA is being prepared in response to an application by CalTrans for a Rivers and
Harbors Act of 1899 (33 U.S.C. 403 et seq.) Section 408 permit to modify an existing Corps' project,
the Sweetwater River Channel Levee System.
The proposed widening would effectively connect the decks of the two existing I-805 bridges with
closure pours and a new cast in place, reinforced concrete box girder. This would widen the
northbound and southbound median, and the northbound outside main-lanes/connector ramp, to
provide standard 12-foot lanes with 10-foot shoulder widths. Currently, the Sweetwater River bridges
provide 11-foot-wide lanes and 2-foot-wide median shoulder sections which extend across the existing
northbound bridge. This results in confined traffic conditions during the morning peak traffic period.
Other improvements would include replacing the existing guard rails, removal and replacement of the
existing joint seals, replacement of cracked and failed approach slabs on the main-lane and shoulder
sections of both existing bridges. Additionally, new 18-foot pier walls, and other appurtenant features,
would be constructed to support the extended bridge structure.
The Corps is requesting comments pertaining to the proposed project from Federal, state, local
agencies, and the public in general that would lead to the determination by decision makers on the
preparation of a Finding of No Significant Impact or whether an Environmental Impact Statement
would be required.
The Environmental Assessment is being prepared in compliance with the National Environmental
Protection Act (NEPA) other Federal laws, regulations, Executive Orders, and Corps' policies. The
Corps is the lead Federal agency for the Proposed Action, as no other agency is involved in
implementing the Proposed Action. Comments received will be considered in determining whether an
Environmental Impact Statement (EIS) will be required or whether a Finding of No Significant Impact
(FONSI) can be issued.
All comments must be received by 5 p.m. on May 17, 2018.
If you have questions or would like additional information, please contact Mr. Ian Bordenave,
Biological Sciences and Environmental Manager, at (213) 452-3874. Comments should be sent to:
Eduardo T. De Mesa
Chief, Planning Division,
U.S. Army Corps of Engineers, Los Angeles District
Attn: Mr. Ian Bordenave, (CESPL-PD-RL)
915 Wilshire Boulevard
Los Angeles, California 90017-3401
or by email at
ian.t.bordenave@usace.army.mil
2