Fieldwood Energy LLC decom 3.42mi pipe

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The applicant proposes decommissioning in place of approximately 3.42 miles of a 2.375-inch in diameter bulk gas lift Right-of-Way pipeline.

Full Public Notice Project Plans PROJECT DESCRIPTION: The applicant proposes decommissioning in place of approximately 3.42 miles of a 2.375-inch in diameter bulk gas lift Right-of-Way pipeline Segment No. 12796. The decommissioning process will consist of the flushing, cleaning, cutting, sealing of the pipeline in accordance with decommissioning requirements under 30 CFR 250.1703. There will be no dredged or fill materials involved in these operations. No structures will be installed. The applicants proposed plans are attached in 8 sheets.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas