The U.S. Army Corps of Engineers is seeking public and agency comments concerning environmental or socioeconomic issues that should be addressed in the course of the NEPA process for the proposed revision of the 1998 Dale Hollow and Wolf Creek water control manuals.

The U.S. Army Corps of Engineers is seeking public and agency comments concerning environmental or socioeconomic issues that should be addressed in the course of the NEPA process for the proposed revision of the 1998 Dale Hollow and Wolf Creek water control manuals. Currently, the control flow at Celina varies seasonally based on crop season (April 15th – December 15th) at 30,000 cubic feet per second (cfs) and flood season (December 15th – April 15th) at 40,000 cfs. The revised water control manuals propose a control flow at Celina that would not vary seasonally and be 40,000 cfs year round. This change in the manual would slightly increase water elevations downstream of both Dale Hollow and Wolf Creek Dams. A public meeting is planned for Tuesday May 22, 2018 from 5 to 7 p.m. at Dale Hollow Resource Managers Office, 540 Dale Hollow Dam Road, Celina, TN. 38551, to discuss any concerns or comments of the proposed revision of the water control manuals for Dale Hollow Dam and Wolf Creek Dam.

DEPARTMENT OF THE ARMY NASHVILLE DISTRICT, CORPS OF ENGINEERS 110 9TH AVENUE SOUTH, ROOM A-405 NASHVILLE, TENNESSEE 37203 IN REPLY REF REFER TO TO

April 23, 2018

Project Planning Branch

SUBJECT: Revision of 1998 Water Control Manuals for Dale Hollow Dam and Wolf Creek Dam

TO ALL INTERESTED PARTIES: The U.S. Army Corps of Engineers, Nashville District (USACE), is initiating scoping under the National Environmental Policy Act (NEPA) to evaluate the impacts of the proposed revision of the 1998 Dale Hollow and Wolf Creek water control manuals. The purpose of water control manuals at Dale Hollow and Wolf Creek Dams is to serve as a guide for the day-to-day and emergency regulation of the project, and to provide background information on the project. The manuals present the plan of regulation for the project and furnish information pertinent to its operation. The focus of this scoping letter is to solicit comments concerning a modification to the water control manuals that changes the control flow at Celina, Tennessee. Currently, the control flow at Celina varies seasonally based on crop season (April 15th ­ December 15th) at 30,000 cubic feet per second (cfs) and flood season (December 15th ­ April 15th) at 40,000 cfs. The revised water control manuals propose a control flow at Celina that would not vary seasonally and be 40,000 cfs year round. This change in the manual would slightly increase water elevations downstream of both Dale Hollow and Wolf Creek Dams. Four maps (Figures 1 ­ 4) are enclosed which show inundation changes in four reaches resulting from the difference between 30,000 and 40,000 cfs. Similar areas would be inundated from the change during crop season. Also changed in the water control manuals: 1) Hydropower ramp rates, while still limited to two units per hour, are now strongly preferred to be limited to one unit per hour unless a power emergency necessitates a two unit per hour ramp rate; 2) Minimum flow are now the discharge equivalent to one hour of generation during every 24-hour period from June 1st through November 15th; 3) The Pool between elevations 631.0 ­ 651.0 mean sea level is now known as the Conservation Pool instead of the Power Pool. A public meeting is planned for Tuesday May 22, 2018 from 5:00pm to 7:00 pm at Dale Hollow Resource Managers Office, 540 Dale Hollow Dam Road, Celina, TN. 38551, to discuss any concerns or comments of the proposed revision of the water control manuals for Dale Hollow Dam and Wolf Creek Dam. This letter serves to solicit scoping comments from the public; federal, state, local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity as part of the USACE planning

-2-

process and in accordance with the NEPA process. We encourage comments not only about resources in the immediate project area, but also of plans or proposals for any other development that may impact or influence project resources. Comments are used to assess impacts on fish, wildlife, endangered species, water quality, historic properties, water supply, conservation, economics, aesthetics, wetlands, flood hazards, floodplain values, land use, navigation, shore erosion, sedimentation, recreation, energy needs, safety, climate change, considerations of property ownership, general environmental effects, cumulative effects, and in general, the needs and welfare of the people. This letter also serves to initiate the public involvement requirements of Section 106 of the National Historic Preservation Act of 1966, as amended. Comments may be submitted within 30 days of the date of this letter to the address on the letterhead or electronically to Cody.A.Flatt@usace.army .mil. For additional information regarding the proposed project, please contact Cody Flatt at (615) 7367954. Sincerely,

for Angela A. Dunn Chief, Project Planning Branch Enclosures

-3-

Figure 1. Water inundation map of Obey and Cumberland Rivers confluence

Figure 2. Water inundation map at Cumberland River Mile 409

-4-

Figure 3. Water inundation map at Cumberland River Mile 424

Figure 4. Water inundation map below Wolf Creek Dam

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits