You can copy from here when filling out the rest of the page.
Chris Eckert, with Teck Alaska Incorporated, 3105 Lakeshore Drive, Bldg. A, Suite 101, Anchorage, AK, 99517, Tel. 907-754-5139, email: chris.eckert@teck.com. The stated purpose of the project is twofold, One; Waste dump facility and access road: Placement of contaminated waste rock from Aqqaluk and Qanaiyaq deposits into 31.7 acres, including uplands and wetlands. Two; Tailings storage pond: The placement of 68,085 cubic yards of clean fill into 12 acres of uplands, and the placement of 20,104 cubic yards of clean gravel into 12.5 acres of wetlands to raise the level of the Red Dog Mine Tailings Pond. This will include raising all sides of the tailings pond, including the main and back dams from 986 feet to 1,006 feet above mean sea level in phases between 2018 and 2024. The main haul road will also be relocated to accommodate the back dam raise. The approximate fill height would vary from roughly 30 inches to 108 inches. It is anticipated that there would be five culvert crossings in the road for storm water runoff, but location and number would be evaluated once construction has begun. All work would be performed in accordance with the enclosed plan (sheets 1-4), dated March 2018.The project site is located within Section 29, T. 31N., R. 18W., Kateel River Meridian; Latitude 68.0520º N., Longitude 162.8479º W.; near Kivalina, Alaska. Please contact Janet Post at (907) 753-2831 by fax at (907) 753-5567, or by email at Janet.l.Post@usace.army.mil if further information is desired concerning this notice.
Chris Eckert, with Teck Alaska Incorporated, 3105 Lakeshore Drive, Bldg. A, Suite 101, Anchorage, AK, 99517, Tel. 907-754-5139, email: chris.eckert@teck.com. The stated purpose of the project is twofold, One; A waste dump facility and access road: Placement of contaminated waste rock from Aqqaluk and Qanaiyaq deposits into 31.7 acres, including uplands and wetlands. Two; Tailings storage pond: The placement of 68,085 cubic yards of clean fill into 12 acres of uplands, and the placement of 20,104 cubic yards of clean gravel into 12.5 acres of wetlands to raise the level of the Red Dog Mine Tailings Pond. This will include raising all sides of the tailings pond, including the main and back dams from 986 feet to 1,006 feet above mean sea level in phases between 2018 and 2024. The main haul road will also be relocated to accommodate the back dam raise. The applicant proposes to discharge 4300 cubic yards (CY) of fill material into 1.2 acres of waters of the U.S., including wetlands for residential development. The applicant would excavate overburden and construct a 26 foot wide road leading to four residential lots on Loon Ave. The total length of the road to be constructed would be 1200 linear feet with a total surface disturbance of approximately 0.73-acre. The overburden depth at the road centerline varies from roughly 12 inches to 60 inches. Once the road would be excavated to bed rock, it would then be filled with one foot minus pit run shot rock. The approximate fill height would vary from roughly 30 inches to 108 inches. It is anticipated that there would be five culvert crossings in the road for storm water runoff, but location and number would be evaluated once construction has begun. Along with the road, there would also be four residential lots developed. Each lot would consist of a driveway and house pad. Driveways would be approximately 14 feet wide by 40 feet long. House pads would be approximately 60 feet by 80 feet in order to create enough room for the structure and vehicles. All work would be performed in accordance with the enclosed plan (sheets 1-4), dated March 2018.The project site is located within Section 29, T. 31N., R. 18W., Kateel River Meridian; Latitude 68.0520º N., Longitude 162.8479º W.; near Kivalina, Alaska. Please contact Janet Post at (907) 753-2831 by fax at (907) 753-5567, or by email at Janet.l.Post@usace.army.mil if further information is desired concerning this notice.
POA-1984-12-M51, Middle Fork Red Dog Creek_PN