You can copy from here when filling out the rest of the page.
The project proposes an Extension of existing, previously authorized bank stabilization for an additional 270 linear feet of Yellowstone River bank, which would result in permanent impacts to approximately 270 linear feet of Riverine waters of the United States. The work will entail reshaping the existing near vertical bank to an approximately 2:1 slope and placement of a keyway along the toe of the reshaped b to a depth of three feet below the existing channel bed. Approximately 480 cubic yards of riprap will be placed for the keyway and along the reshaped bank. The channelward encroachment of the project will be 16 feet.
The project proposes an Extension of existing, previously authorized bank stabilization for an additional 270 linear feet of Yellowstone River bank, which would result in permanent impacts to approximately 270 linear feet of Riverine waters of the United States. The work will entail reshaping the existing near vertical bank to an approximately 2:1 slope and placement of a keyway along the toe of the reshaped b to a depth of three feet below the existing channel bed. Approximately 480 cubic yards of riprap will be placed for the keyway and along the reshaped bank. The channelward encroachment of the project will be 16 feet."