LETTER OF PERMISSION: The proposed project is to construct a USA-based combined production, logistics, and administrative complex for
HARIBO. The complex consists of numerous buildings for production, operations, logistics and distribution, administration, and an on-site retail sales and entertainment venue
PROJECT DESCRIPTION AND PURPOSE: The proposed project is to construct a USA-based combined production, logistics, and administrative complex for HARIBO. The complex consists of numerous buildings for production, operations, logistics and distribution, administration, and an on-site retail sales and entertainment venue. This complex will allow HARIBO to reduce shipping and distribution time to maximize product shelf life and increase logistical efficiency; provide flexibility in product design to address changing customer tastes; and integrate production and administrative staff in a combined facility for operational efficiency.
Information for File # MVP-2018-00520-RAN
Applicant: HARIBO of America Manufacturing, LLC.
Corps Contact: Rachel Nuetzel
Address: 250 N. Sunnyslope Road, Suite 296, Brookfield WI 53005
E-Mail: Rachel.A.Nuetzel@usace.army.mil
Phone: 651-290-5729
Primary County: Kenosha
Sections: 13 and 24
Township: 1N
Range: 21E
Information Complete On: April 12, 2018
Posting Expires On: June 04, 2018
Authorization Type: LOP-06-WI
This application is being reviewed in accordance with the practices for documenting Corps
jurisdiction under Sections 9 & 10 of the Rivers and Harbors Act of 1899 and Section 404 of the
Clean Water Act identified in Regulatory Guidance Letter 08-02.
Project
PROJECT DESCRIPTION AND PURPOSE: The proposed project is to construct
a USA-based combined production, logistics, and administrative complex for
HARIBO. The complex consists of numerous buildings for production, operations,
logistics and distribution, administration, and an on-site retail sales and
entertainment venue. This complex will allow HARIBO to reduce shipping and
distribution time to maximize product shelf life and increase logistical efficiency;
provide flexibility in product design to address changing customer tastes; and
integrate production and administrative staff in a combined facility for operational
efficiency.
NAME, AREA AND TYPES OF WATERS (INCLUDING WETLANDS) SUBJECT
TO LOSS: The proposed project would result in the discharge of fill material in
and permanent loss of 0.60 acre of wetland (wet meadow and hardwood
swamp).
ALTERNATIVES CONSIDERED: Three other onsite design alternatives were
considered by the applicant for the project but were dismissed because they did
not meet the project purpose/need due to insufficient warehouse space.
COMPENSATORY MITIGATION: The applicant proposes to fulfill federal
compensatory mitigation requirements by purchasing credits from a federally
approved mitigation bank or the Wisconsin In-Lieu Fee program contingent upon
Corps approval.
Page 1 of 2
THREATENED OF ENDANGERED SPECIES: The proposed project is within the
known or historic range of the following Federally-listed species: Northern Longeared bat (threatened), Whooping crane (Experimental population, nonessential), and the Eastern Prairie Fringed Orchid (threatened). The Corps will
coordinate any potential effects to the species listed above and their critical
habitat with the USFWS.
Drawings
See enclosed exhibits labeled MVP-2018-00520-RAN Pages 1-2 of 2.
Page 2 of 2
MVP-2018-00520-RAN Page 1 of 2
Kenosha
County
Section 13,
T1N, R21E
HARIBO
Project Site
Wi l m
ot Av
e
C
Village of
Bristol
94
HARIBO Project Site
Section 24,
T1N, R21E
Village of
Pleasant
Prairie
Map Source: USGS National Map
Project Location
HARIBO Project Site
Project Location
Legend
Municipal Boundary
0 165 330
660
990
1,320
Feet
Project Parcel
Section Line
Parcel #: 91-4-121-241-0601
T1N, R21E, Sections 13 and 24
Village of Pleasant Prairie
Kenosha County, WI
Area = ~136 acres
MVP-2018-00520-RAN Page 2 of 2
SHEET NO.
FINAL PREFERRED
SITE PLAN
SHEET CONTENTS
XXX
DO NOT SCALE DRAWINGS
CHECKED BY:
DRAWN BY:
DESIGNED BY:
4526000-170487.01
FEBRUARY 14, 2018
XXX
DAY
DATE:
CLIENT NO.:
HIGHLANDS BUSINESS PARK
HARIBO MANUFACTURING OF AMERICA
PROJECT GREAT LAKE
ISSUED
M&H NO.:
© Copyright
This document, or any portion thereof, shall
not be duplicated, disclosed, or used on any
other project or extension of this project
except by written agreement with Mead &
Hunt, Inc. Mead & Hunt shall not be
responsible for any unauthorized use of, or
alteration to these documents.
Mead and Hunt, Inc.
2440 Deming Way
Middleton, WI 53562
phone: 608-273-6380
meadhunt.com
PLEASANT PRAIRIE, WI
W
LOT 1
C.S.M. NO. 837
W
W
TREE LINE
W
W
W
VILLAGE OF PLEASANT PRAIRIE
VILLAGE OF BRISTOL
W
WETLAND
W
TH D PUBLI .O.W.)
12(D0EDIC(VATAERIABLE R
W
NUEET)
AVEC STRE
OWNER: HARRY
C. SDYALIS
LOT 1
C.S.M. NO. 1065
Gate 1
Trailer yard
12 Truck parking
x
Truck scale
x
x
x
x
x
x
EMERGENCY ACCESS
WETLANDS
W
W
x
W
LOT 1
C.S.M. NO. 829
OWNER: DAVID J. BIRCH
W
W
7
W
x
W
W
W
x
120 Employee parking
W
OWNER: LAURIE
A. BIRCHELL
PARKING
128TH AVENUE
W
W
W
W
TREE LINE
ROADWAYS
TREE LINE
GRAVEL
BUILDINGS
W
W
WETLAND
UNDEVELOPED OR LANDSCAPE AREAS
(DED (VARIA
DESIGN CONCEPT 3 - PREFERRED
COU
GRAVEL
W
"C"
OAD
OT R HWAY
WILM NK HIGREET)
ST
BLIC
TRU
.)
R.O.W
NTY ICATED PU
BLE
WALKWAYS
W
OWNER:
PATRICK M.
PERLMAN
TREE LINE
WETLANDS
WETLAND
W
LOT 1
C.S.M. NO. 1066
W
128TH AVENUE
W
x
x
Loading yard
x
W
TREE LINE
W
GRAVEL
TREE LINE
W
Buffer warehouse
±0,00 = 710,00
TREE LINE
NORTH CORNER
SEC. 24, T1N, R21E
(FOUND CONC. MON. W/
BRASS CAP)
W
x
2
WETLAND
W
W
x
W
x
TREE LINE
W
W
W
U
W
H DP ER
0T ATE IABL
12(DEDIC(VAR
.O
)
UE
ET
ENSTRE
AVBLIC .W.)
W
x
Expansion area
warehouse
x
W
x
680.00'
[207.26 m]
W
x
High-bay
warehouse
Phase 2
x
W
W
x
W
400.00'
[121.92 m]
W
9
x
x
x
W
8
W
176.79'
[53.89 m]
W
W
x
Waste water
Fresh water
Power supply
Gas
W
x
Sprinkler
W
12
165.50'
[50.44 m]
x
W
Multistorey
car park
x
x
x
Expansion area
Phase 3
1
Boilerhouse
±0,00 = 710,00
Production area
±0,00 = 710,00
x
x
EXISTING
BUILDING
x
GRAVEL
Expansion area
Phase 2
799.30'
[243.63 m]
Expansion area
Phase 4
1
x
EXISTING
SILOS
x
x
1
TANK
Administration /
Cafeteria
±0,00 = 710,00
x
Expansion area
Phase 2
TREE LINE
x
x
3
x
x
x
x
5
HARIBO Park
x
x
82.43'
[25.12 m]
x
x
4
Shop
Fitness
Kindergarten
Museum
Gate 2
WALKWAY
10
Central Administration
±0,00 = 710,00
6
±0,00 = 710,00
11
x
341 Employee + visitor parking
x
x
x
x
Heliport
WETLAND
+119 Employee + visitor parking
TREE LINE
TREE LINE
TREE LINE
x
TREE LINE
TREE LINE
TREE LINE
EDGE OF WATER
EL.=685.5
03/2017
3/26/2018 9:36:47 AM
X:\4526000\170487.01\TECH\REPORTS\ENVIRONMENTAL\WETLAND PERMITTING\FINAL RECOMMENDED SITE PLAN_2018 02 16\FINAL SITE PLAN - PREFERRED.DWG
x