Home

Portland District

Run scraper

The U.S. Army Corps of Engineers

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The U.S. Army Corps of Engineers, Portland District, is providing an additional 30-day public review period for the draft Supplemental Environmental Assessment (SEA) and draft Finding of No Significant Impact (FONSI) for the long-term release of an additional 1,000 acre-feet of stored water for irrigation from the Willow Creek Dam and Lake Project.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas