The applicant proposes to decommission-in-place a 20-inch natural gas pipeline.

Full PublicNotice Project Plans PROJECT DESCRIPTION: The applicant proposes to decommission-in-place a 20-inch natural gas pipeline located in water depths between approximately -3 feet to -16 feet. Approximately 350 feet of pipeline have been removed from the Gulf Intracoastal Waterway. In accordance with the Bureau of Safety and Environmental Enforcement (BSEE) 30 CFR 250.1750 pipeline decommissioning requirements, the applicant has: 1) disconnected from previously serviced production platform; 2) flushed by pigging and filled with seawater to equalize the line pressure; 3) removed a 50-foot section of riser pipe turn at the platform and plugged the remaining end; and 4) confirmed depth of cover at the pipeline ends and cover endpoints with 3 feet of protective sand/cement bags. Jetting was used to expose pipeline riser endpoints and allow pipe “cold cuts.”

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas