TIMBALIER ISLAND AND TRINITY EAST ISLANDS RESTORATION PROJECT
IN TERREBONNE PARISH
NAME OF APPLICANT: Coastal Protection and Restoration Authority of Louisiana (CPRA), Attn: Justin Merrifield, Post Office Box 44027, Baton Rouge, Louisiana 70804.
LOCATION OF WORK: Located in Lake Pelto and Terrebonne Bay, south of Cocodrie, Louisiana, located in Terrebonne Parish, as shown on the enclosed drawings (Latitude 29.06678 N Longitude -90.48855 W). This project is located in Terrebonne Basin (West Central Louisiana Coastal HUC 08090302).
CHARACTER OF WORK: The applicant is requesting a Department of the Army permit authorization for the Restoration of Timbalier Island and Trinity East Islands through beach and dune fill placement utilizing offshore sand material located in federal waters. The project is a part of the Terrebonne Basin Barrier Island and Beach Nourishment Restoration Project (TE-143) located south of Cocodrie, Louisiana, in Terrebonne Parish. The project has been designed to restore the geomorphic and ecologic form and function of the barrier island features at Timbalier Island and Trinity East Island to provide and protect critical habitats. The project proposes to add sand material in areas most susceptible to breaching and provide benefits through the restoration and sustaining of important coastal habitats such as nesting habitat for numerous shorebird species. The applicant has stated that they have designed this project to be synergistic with currently implemented and future restoration projects. Approximately 16,130,359 cubic yards of native waterbottom material would be dredged (hydraulic cutterhead dredge and hopper dredge) and placed as fill for barrier island, dune, and marsh platform restoration/creation activities. Approximately 981 acres of beach, dune, and marsh habitat are proposed to be created as a result of the fill placement. Approximately 921 acres of waterbottoms would be impacted through dredging activities at the borrow sites. Approximately 91 acres of wetlands would be impacted as a result of the fill placement. Created beach and dune habitat and marsh platform habitat are proposed to be replanted with appropriate native ecospecies. The applicant has claimed that the project has been designed to avoid and minimize direct and secondary adverse wetland impacts to the maximum extent practicable. The applicant is proposing that the project derived benefits and habitat creation would outweigh any detrimental impacts to wetland areas as a result of project implementation. Compensatory mitigation requirements are not anticipated.
JOINT PUBLIC NOTICE
May 21, 2018
United States Army
Corps of Engineers
New Orleans District
Regulatory Branch
7400 Leake Avenue
New Orleans, Louisiana 70118
State of Louisiana
Department of Environmental Quality
Water Permits Division
Post Office Box 4313
Baton Rouge, Louisiana 70821-4313
(504) 862-1217
Project Manager
Kenny Blanke
Kenneth.G.Blanke@usace.army.mil
MVN 2018-0532-CQ
(225) 219-3225
Project Manager
Ms. Elizabeth Hill
WQC Application Number
WQC 180517-03
Interested parties are hereby notified that a permit application has been received by the
New Orleans District of the U.S. Army Corps of Engineers pursuant to: [X] Section 10 of the
Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [X] Section 404
of the Clean Water Act (86 Stat. 816; 33 USC 1344).
Application has also been made to the Louisiana Department of Environmental Quality,
Office of Environmental Services, for a Water Quality Certification (WQC) in accordance with
statutory authority contained in LRS30:2074 A(3), and provisions of Section 401 of the Clean
Water Act (P.L.95-17).
TIMBALIER ISLAND AND TRINITY EAST ISLANDS RESTORATION PROJECT
IN_TERREBONNE PARISH
NAME OF APPLICANT: Coastal Protection and Restoration Authority of Louisiana (CPRA),
Attn: Justin Merrifield, Post Office Box 44027, Baton Rouge, Louisiana 70804.
LOCATION OF WORK: Located in Lake Pelto and Terrebonne Bay, south of Cocodrie,
Louisiana, located in Terrebonne Parish, as shown on the enclosed drawings (Latitude
29.06678 N Longitude -90.48855 W). This project is located in Terrebonne Basin (West
Central Louisiana Coastal HUC 08090302).
CHARACTER OF WORK: The applicant is requesting a Department of the Army permit
authorization for the Restoration of Timbalier Island and Trinity East Islands through beach and
dune fill placement utilizing offshore sand material located in federal waters. The project is a
part of the Terrebonne Basin Barrier Island and Beach Nourishment Restoration Project (TE143) located south of Cocodrie, Louisiana, in Terrebonne Parish. The project has been
designed to restore the geomorphic and ecologic form and function of the barrier island features
at Timbalier Island and Trinity East Island to provide and protect critical habitats. The project
proposes to add sand material in areas most susceptible to breaching and provide benefits
through the restoration and sustaining of important coastal habitats such as nesting habitat for
numerous shorebird species. The applicant has stated that they have designed this project to
be synergistic with currently implemented and future restoration projects. Approximately
16,130,359 cubic yards of native waterbottom material would be dredged (hydraulic cutterhead
dredge and hopper dredge) and placed as fill for barrier island, dune, and marsh platform
restoration/creation activities. Approximately 981 acres of beach, dune, and marsh habitat are
proposed to be created as a result of the fill placement. Approximately 921 acres of
waterbottoms would be impacted through dredging activities at the borrow sites. Approximately
91 acres of wetlands would be impacted as a result of the fill placement. Created beach and
dune habitat and marsh platform habitat are proposed to be replanted with appropriate native
ecospecies. The applicant has claimed that the project has been designed to avoid and
minimize direct and secondary adverse wetland impacts to the maximum extent practicable.
The applicant is proposing that the project derived benefits and habitat creation would
outweigh any detrimental impacts to wetland areas as a result of project implementation.
Compensatory mitigation requirements are not anticipated.
The comment period for the Department of Army Permit and the Louisiana Department
of Environmental Quality will close in 20 days from the date of this joint public notice. Written
comments, including suggestions for modifications or objections to the proposed work, stating
reasons thereof, are being solicited from anyone having interest in this permit and/or this WQC
request and must be mailed so as to be received before or by the last day of the comment
period. Letters concerning the Corps of Engineers permit application must reference the
applicant's name and the Permit Application Number, and be mailed to the Corps of Engineers
at the address above, ATTENTION: REGULATORY BRANCH. Similar letters concerning the
Water Quality Certification must reference the applicant's name and the WQC application
number and be mailed to the Louisiana Department of Environmental Quality at the address
above. Individuals or parties may request an extension of time in which to comment on the
proposed work by writing or e-mailing the Corps of Engineers Project Manager listed above.
Any request must be specific and substantively supportive of the requested extension, and
received by this office prior to the end of the initial comment period. The Section Chief will
review the request and the requestor will be promptly notified of the decision to grant or deny
the request. If granted, the time extension will be continuous to the initial comment period and,
inclusive of the initial comment period, will not exceed a total of 30 calendar days.
The application for this proposed project is on file with the Louisiana Department of
Environmental Quality and may be examined during weekdays between 8:00 a.m. and 4:30
p.m. Copies may be obtained upon payment of costs of reproduction.
Bureau of Ocean Energy Management (BOEM): A lease for use of Federal sand resources
from South Pelto Area Lease Blocks 12 and 13 is required from BOEM. If you have any
questions concerning the lease application, you may contact Michael Miner at
Michael.Miner@boem.gov (504)736-2700. Please furnish BOEM a copy of all public notice
comments. Copies can be mailed to Greg Kozlowski, Deputy Regional Supervisor, Office of
Environment, Bureau of Ocean Energy Management, 1202 Elmwood Park Blvd., New Orleans,
LA 70123.
Note: The Bureau of Ocean Energy Management (BOEM) has sole regulatory authority over the
use of Outer Continental Shelf (OCS) sand resources and conveyance on the OCS under the
OCS Lands Act. The U.S. Army Corps of Engineers (Corps) requires a permit for all other
aspects of the project, including dredging of any state water bottom areas, as well as
conveyance and placement of sand resources. BOEM and the Corps are working
collaboratively to ensure effective implementation of the required National Environment Policy
Act (NEPA) process, the required Endangered Species Act (ESA) Section 7 consultations, the
Magnuson-Stevens Fishery and Conservation Management Act Essential Fish Habitat
consultation (Section 305), the National Historic Preservation Act Section 106 process, and the
Coastal Zone Management Act Section 307 consistency determination.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the probable
impacts, including cumulative impacts of the proposed activity on the public interest. That
decision will reflect the national concern for both protection and utilization of important
resources. The benefit which reasonably may be expected to accrue from the proposal must be
balanced against its reasonably foreseeable detriments. All factors which may be relevant to
the proposal will be considered including the cumulative effects thereof; among those are
conservation, economics, aesthetics, general environmental concerns, wetlands, historic
properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation,
shoreline erosion and accretion, recreation, water supply and conservation, water quality,
energy needs, safety, food and fiber production, mineral needs, considerations of property
ownership and, in general, the needs and welfare of the people.
The US Army Corps of Engineers is soliciting comments from the public, federal, state,
and local agencies and officials, Indian Tribes, and other interested parties in order to consider
and evaluate the impacts of this proposed activity. Any comments received will be considered
by the US Army Corps of Engineers to determine whether to make, modify, condition, or deny a
permit for this proposal. To make this decision, comments are used to assess impacts on
endangered species, historic properties, water quality, general environmental effects, and other
public interest factors listed above. Comments are used in the preparation of an Environmental
Assessment and/or an Environmental Impact Statement pursuant to the National Environmental
Policy Act. Comments are also used to determine the need for a public hearing and to
determine the overall public interest of the proposed activity.
The New Orleans District is unaware of properties listed on the National Register of
Historic Places near the proposed work. The possibility exists that the proposed work may
damage or destroy presently unknown archeological, scientific, prehistorical, historical sites, or
data. Copies of this notice are being sent to the State Archeologist and State Historic
Preservation Officer.
Our initial finding is that the proposed work would neither affect any species listed as
endangered by the U.S. Departments of Interior or Commerce, nor affect any habitat
designated as critical to the survival and recovery of any endangered species. Utilizing
Standard Local Operating Procedure for Endangered Species in Louisiana (SLOPES), dated
October 22, 2014, between the U.S. Army Corps of Engineers, New Orleans and U.S. Fish and
Wildlife Service, Ecological Services Office, the Corps has determined that with the inclusion of
special conditions, the proposed activity is not likely adversely affect the West Indian manatee
(Trichechus manatus).
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the
Magnuson-Stevens Fishery Conservation and Management Act. The applicant's proposal
would result in the destruction or alteration of 1,902 acres of EFH utilized by various life stages
of red drum and penaeid shrimp. Our initial determination is that the proposed action would not
have a substantial adverse impact on EFH or federally managed fisheries in the Gulf of Mexico.
Our final determination relative to project impacts and the need for mitigation measures is
subject to review by and coordination with the National Marine Fisheries Service.
If the proposed work involves deposits of dredged or fill material into navigable waters,
the evaluation of the probable impacts will include the application of guidelines established by
the Administrator of the Environmental Protection Agency. Also, a certification that the
proposed activity will not violate applicable water quality standards will be required from the
Department of Environmental Quality, Office of Environmental Services, before a permit is
issued.
Any person may request, in writing, within the comment period specified in this notice,
that a public hearing be held to consider this application. Requests for public hearings shall
state, with particularity, the reasons for holding a public hearing. You are requested to
communicate the information contained in this notice to any other parties whom you deem likely
to have interest in the matter.
The applicant has certified that the proposed activity described in the application
complies with and will be conducted in a manner that is consistent with the Louisiana Coastal
Resources Program. The Department of the Army permit will not be issued unless the applicant
received approval or a waiver of the Coastal Use Permit by the Department of Natural
Resources.
for
Enclosure
JOHN M. HERMAN
Chief, Central Evaluation Section
Regulatory Branch
STATE OF LOUISIANA
COASTAL PROTECTION AND RESTORATION AUTHORITY
INDEX TO SHEETS
SHEET NO.
1
2
3
4
5
6-7
8
9
10
11
12
13 - 14
15
16
17
18 - 19
20
21 - 22
23
24 - 25
26
27 - 28
29
30
31
32
33 - 36
TERREBONNE BASIN BARRIER ISLAND AND BEACH NOURISHMENT
STATE PROJECT NO. TE-143
TERREBONNE PARISH, LOUISIANA
PRELIMINARY
DESCRIPTION
TITLE SHEET
PROJECT OVERVIEW MAP
GENERAL NOTES
TIMBALIER ISLAND NOURISHMENT AREA
PLAN VIEW
TIMBALIER ISLAND NOURISHMENT
TYPICAL SECTIONS
TIMBALIER ISLAND ACCESS CHANNELS
TIMBALIER ISLAND DOCK REMOVAL
ACCESS CHANNEL
TIMBALIER ISLAND DOCK REMOVAL
DETAIL
TRINITY-EAST ISLAND NOURISHMENT
AREA PLAN VIEW
TRINITY-EAST ISLAND NOURISHMENT
TYPICAL SECTIONS
TRINITY-EAST ISLAND UPLAND ACCESS
CORRIDOR
TRINITY-EAST ISLAND ACCESS
CHANNELS
TRINITY-EAST ISLAND DOCK REMOVAL
ACCESS CHANNEL
TRINITY-EAST ISLAND DOCK REMOVAL
DETAIL
SHIP SHOAL BORROW AREA PLAN VIEW
SHIP SHOAL BORROW AREA TYPICAL
SECTIONS
SOUTH PELTO BORROW AREA PLAN
VIEW
SOUTH PELTO BORROW AREA TYPICAL
SECTIONS
TIMBALIER PUMP-OUT AREAS &
CONVEYANCE CORRIDORS OVERVIEW
TIMBALIER PUMP-OUT AREAS &
CONVEYANCE CORRIDORS PLAN VIEW
TRINITY-EAST PUMP-OUT AREAS &
CONVEYANCE CORRIDORS OVERVIEW
TRINITY-EAST PUMP-OUT AREAS &
CONVEYANCE CORRIDORS PLAN VIEW
OPTIONAL SEDIMENT PIPELINE
CROSSING TYPICAL DETAILS
SAND FENCING DETAILS
TIMBALIER ISLAND VEGETATIVE
PLANTING DETAILS
TRINITY-EAST ISLAND VEGETATIVE
PLANTING DETAILS
ALIGNMENT AND COORDINATE TABLES
BY
DESCRIPTION
TIMBALIER ISLAND
RESTORATION AREA
TRINITY-EAST ISLAND
RESTORATION AREA
LAKE PELTO
TERREBONNE
PARISH
CONVEYANCE
CORRIDORS
STATE / FEDERAL
WATER BOUNDARY
TIMBALIER
ISLAND PUMP
OUT AREAS
TRINITY-EAST
ISLAND PUMP
OUT AREAS
SOUTH PELTO
BORROW AREAS
GULF OF
MEXICO
SHIP SHOAL
BORROW AREA
30,000'
15,000'
0'
30,000'
NOTES:
1. FOR PERMITTING
PURPOSES ONLY. NOT TO
BE USED FOR
CONSTRUCTION.
2. RETAIN ENTIRE SET AS ONE,
INDIVIDUAL SHEETS
SHOULD NOT BE REMOVED.
60,000'
L
J
DATE
COASTAL
ENGINEERING
CONSULTANTS, INC.
PH: (225) 768-1982
8570 ANSELMO LANE
BATON ROUGE, LA 70810
DRAWN BY: STEVE DARTEZ
TIMBALIER
BAY
TERREBONNE
BAY
DESIGNED BY: MICHAEL T. POFF, P.E.
LICENSE NUMBER: 30048
LOUISIANA COASTAL PROTECTION
AND RESTORATION AUTHORITY
150 TERRACE AVENUE
BATON ROUGE, LA 70802
APPROVED BY: TRAVIS BYLAND, P.E.
TERREBONNE BASIN
BARRIER ISLAND AND BEACH
NOURISHMENT
TITLE SHEET
STATE PROJECT NUMBER: TE-143
DATE: APRIL 2018
FEDERAL PROJECT NUMBER:
SHEET 1 OF 36
CASSE-TETE ISLAND
TIMBALIER BAY
215,000 N
3,585,000 E
215,000 N
3,555,000 E
TIMBALIER
ISLAND
CALUMET ISLAND
TRINITY-EAST
ISLAND
LAKE PELTO
185,000 N
ST11
185,000 N
STATE / FEDERAL WATER
BOUNDARY
SP03
SP08
SP04
SP07
SP05
SP06
TRINITY-EAST ISLAND
PUMP OUT AREAS
155,000 N
3,495,000 E
OCS LEASE BLOCK
ST18 ST19
ST33
ST34
SOUTH PELTO
BORROW AREAS
155,000 N
ST32
ST35
155,000 N
ST31
ST36
LEGEND
ST30
ST37
BORROW AREA LIMITS
3,585,000 E
SP01
SP02
SP10
SP09
ST17
TIMBALIER ISLAND
PUMP OUT AREAS
3,525,000 E
SS67
SS66 SS68
SS69
ST16
3,585,000 E
ST09 ST10
3,555,000 E
185,000 N
3,525,000 E
CONVEYANCE
CORRIDORS
3,495,000 E
WHISKEY
ISLAND
215,000 N
3,525,000 E
215,000 N
3,495,000 E
TERREBONNE BAY
ISLAND RESTORATION
AREA
155,000 LIMITS
N
PUMP-OUT AREA
LIMITS
SS91
SS90
SS92
SS93
SP11 SP12
SP20 SP19
SP13 SP14
SP18 SP17
SHIP SHOAL
BORROW AREA
15,000'
7,500'
0'
BY
DESCRIPTION
15,000'
30,000'
DATE
GULF OF
MEXICO
ST51
ST52
COASTAL
ENGINEERING
CONSULTANTS, INC.
PH: (225) 768-1982
8570 ANSELMO LANE
BATON ROUGE, LA 70810
DRAWN BY: STEVE DARTEZ
CONVEYANCE
CORRIDOR
ALIGNMENTS
SP15
SP16
DESIGNED BY: MICHAEL T. POFF, P.E.
LICENSE NUMBER: 30048
LOUISIANA COASTAL PROTECTION
AND RESTORATION AUTHORITY
150 TERRACE AVENUE
BATON ROUGE, LA 70802
APPROVED BY: TRAVIS BYLAND, P.E.
ST50
ST53
NOTES:
1. ALL COORDINATES ARE NAD83,
PLANE, U.S.
ST49 LOUISIANA STATE ST48
SURVEY FEET.
ST54
ST55
TERREBONNE BASIN
BARRIER ISLAND AND BEACH
NOURISHMENT
PROJECT OVERVIEW MAP
STATE PROJECT NUMBER: TE-143
DATE: APRIL 2018
FEDERAL PROJECT NUMBER:
SHEET 2 OF 36
GENERAL NOTES:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
ANY EXCAVATED MATERIAL WILL BE, TO THE BEST OF KNOWLEDGE, FREE OF CONTAMINANTS AND/OR WILL BE DISPOSED OF IN AN APPROVED LANDFILL.
THE CONTRACTOR SHALL BECOME FAMILIAR WITH THE SITE, CONSTRUCTION PLANS, AND CONTRACT DOCUMENTS AND SHALL CONDUCT WORK IN STRICT ACCORDANCE WITH ALL PERMITS AND
APPROVALS OBTAINED FOR THIS PROJECT. THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF ANY ERRORS OR DISCREPANCIES IN THE PLANS PRIOR TO BIDDING.
AERIAL IMAGE REFERENCE: ©2018 MICROSOFT CORPORATION ©2018 DIGITAL GLOBE ©CNES (2018) DISTRIBUTION AIRBUS DS; BING.
PROBABLE PIPELINES SHOWN ARE FROM LOUISIANA DEPARTMENT OF NATURAL RESOURCES, OFFICE OF COASTAL MANAGEMENT - 2010, BUREAU OF OCEAN ENERGY MANAGEMENT - 2007, AND OCEAN
SURVEYS, INC. - 2011 & 2015.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING PIPELINE AND UTILITY OPERATORS AT THE TIME OF CONSTRUCTION. ALL PIPELINES AND UNDERGROUND UTILITIES SHALL BE FIELD
LOCATED AND MARKED.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING LOUISIANA ONE CALL SYSTEM (1-800-272-3020) A MINIMUM OF 48 HOURS PRIOR TO THE COMMENCEMENT OF ANY EXCAVATION (DIGGING,
DREDGING, JETTING, ETC.) OR DEMOLITION ACTIVITY. THE CONTRACTOR SHALL ALSO NOTIFY PIPELINE AND UTILITY OPERATORS 72 HOURS PRIOR TO ANY EXCAVATION.
THE WATER BOTTOM SHALL NOT BE DISTURBED DURING ACCESS TO THE PROPOSED WORK LOCATION, OR BY THE AUTHORIZED ACTIVITIES WHETHER IT BE BY DREDGING, WHEEL WASHING ,
PROPWASHING, JETTING, MUCKING, PLOWING, BULL DOZING OR ANY MEANS OF MOVING BOTTOM MATERIAL, EXCEPT AS DEPICTED ON THE PERMIT SHEETS. POWERED VESSELS SHALL BE OPERATED
SO AS NOT TO DISTURB THE WATER BOTTOM BY PROPELLER OR JET ACTION.
ALL LOGS, STUMPS, AND OTHER DEBRIS UNEARTHED DURING DREDGING SHALL BE REMOVED TO AN APPROVED OFFSITE DISPOSAL AREA.
THE CONTRACTOR MUST INSTALL AND MAINTAIN ANY SAFETY LIGHTS, SIGNS, AND SIGNALS PRESCRIBED BY THE U.S. COAST GUARD, THROUGH REGULATIONS OR OTHERWISE ON THE AUTHORIZED
FACILITIES.
ANY DAMAGE TO EXISTING U.S. COAST GUARD NAVIGATION AIDS OR PRIVATE NAVIGATION AIDS SHALL BE REPAIRED BY THE CONTRACTOR TO U.S. COAST GUARD STANDARDS AT THE EXPENSE OF THE
CONTRACTOR.
PIPELINES IN OPEN WATER AND/OR NAVIGABLE WATERS SHALL BE MARKED WITH BUOYS BY THE CONTRACTOR IN ACCORDANCE WITH TECHNICAL SPECIFICATIONS. THE CONTRACTOR SHALL MAINTAIN
BUOYS DURING CONSTRUCTION OR HAVE ADEQUATE NAVIGATIONAL EQUIPMENT ON THE DREDGE TO AVOID DREDGING IN RESTRICTED AREAS.
THE PROPOSED PROJECT AND ANY FUTURE MAINTENANCE WORK INVOLVING THE USE OF FLOATING CONSTRUCTION EQUIPMENT (BARGE MOUNTED CRANES, BARGE MOUNTED PILE DRIVING
EQUIPMENT, FLOATING DREDGE EQUIPMENT, DREDGE DISCHARGE PIPELINES, ETC.) IN FEDERAL WATERS, SHALL NOTIFY THE U.S. COAST GUARD SO THAT A NOTICE TO MARINERS, IF REQUIRED, MAY
BE PREPARED. NOTIFICATION, WITH A COPY OF THE PERMIT APPROVAL AND DRAWINGS, SHALL BE MAILED TO THE U.S. COAST GUARD, SECTOR NEW ORLEANS COMMAND CENTER, 201 HAMMOND
HIGHWAY, METAIRIE, LOUISIANA 70005, 30 DAYS BEFORE COMMENCEMENT OF WORK.
THE OFFSHORE WORK AREAS SHALL CONSIST OF THE BORROW AREAS AND CONVEYANCE CORRIDORS. THE INSHORE WORK AREA IS DEFINED BY A 150' OFFSET FROM THE OUTER LIMITS OF THE
ACCESS CHANNELS, TEMPORARY SIDECAST DISPOSAL AREAS, AND THE GULF TOE OF THE BEACH FILL TEMPLATE. THE CONTRACTOR SHALL BE REQUIRED TO CONFINE HIS/HER PLANT, EQUIPMENT,
AND OPERATIONS OF PERSONNEL WITHIN THE LIMITS OF THE WORK AREA, AREAS PERMITTED BY LAW, ORDINANCES, PERMITS, AND THE REQUIREMENTS OF THE CONTRACT DOCUMENTS.THE
CONTRACTOR SHALL NOT UNREASONABLY ENCUMBER THE PREMISES WITH PLANT OR EQUIPMENT.
THE CONTRACTOR SHALL FOLLOW CONVEYANCE CORRIDORS, ACCESS CHANNELS, UPLAND ACCESS CORRIDORS, AND / OR FILL TEMPLATES, AND SHALL NOT, AT ANY TIME, TRAVEL ON EXISTING
MARSH OR VEGETATED WETLANDS UNLESS SPECIFIED IN THE PERMIT OR THROUGH WRITTEN DIRECTION FROM ENGINEER.
THE CONTRACTOR SHALL WORK COOPERATIVELY WITH THE OWNER TO ADDRESS THE NOTIFICATION AND COORDINATION REQUIREMENTS WITH THE LANDOWNERS, UTILITY OPERATORS, AND PIPELINE
COMPANIES.
AS-BUILT DRAWINGS AND/OR PLATS SHALL HAVE WRITTEN ON THEM THE DATE OF COMPLETION OF SAID ACTIVITIES AND SHALL BE SUBMITTED TO THE LOUISIANA DEPARTMENT OF NATURAL
RESOURCES, OFFICE OF COASTAL MANAGEMENT, P.O. BOX 44487, BATON ROUGE, LA 70804-4487 WITHIN 30 DAYS FOLLOWING PROJECT COMPLETION.
THIS DRAWING SET IS FOR PERMITTING PURPOSES ONLY AND IS NOT TO BE USED FOR CONSTRUCTION.
SURVEY NOTES:
1.
2.
3.
4.
5.
6.
ALL COORDINATES ARE NORTH AMERICAN DATUM OF 1983 (NAD 83 - GEOID 12B), LOUISIANA STATE PLANE, SOUTHERN ZONE, U.S. SURVEY FEET. ALL RESTORATION AREA ELEVATIONS ARE BASED ON
NATIONAL GEODETIC SURVEY AND LOUISIANA DEPARTMENT OF NATURAL RESOURCES MONUMENTS.
MONUMENTS
ELEVATION
NORTHING
EASTING
TE23-SM-01
7.30'
224,296.33
3,645,688.77
TE118-SM-01
2.16'
207,570.44
3,601,096.02
TE118-SM-02
3.06'
207,952,34
3,604,313.92
TE118-SM-03
1.56'
228,233.63
3,597,696.59
OTHER LOCAL AREA SECONDARY MONUMENTS REQUIRING UPDATES.
MONUMENTS
ELEVATION
NORTHING
EASTING
LAST UPDATE
TE40-SM-01
5.00'
206,444.36
3,554,437.49
SEPT. 2003
TRINITY
4.67'
200,955.97
3,476,498.85
APR. 2002
ALL ELEVATIONS ARE IN NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88 - 2004.65), U.S. SURVEY FEET UNLESS OTHERWISE SPECIFIED.
SHIP SHOAL BORROW AREA PERFORMED BY OCEAN SURVEYS, INC., 2015-16. SOUTH PELTO BORROW AREA SURVEY PERFORMED BY OCEAN SURVEYS, INC. 2011. TRINITY-EAST PUMP-OUT AREAS,
TRINITY-EAST CONVEYANCE CORRIDOR, TIMBALIER PUMP-OUT AREAS, TIMBALIER CONVEYANCE CORRIDOR ELEVATIONS REFERENCED TO MLLW OBTAINED FROM NOAA NAUTICAL CHART 11357
"TIMBALIER AND TERREBONNE BAYS", 42nd EDITION, MAY 2012, NOS SURVEYS 1990-2011.
ALL ISLAND SURVEYS PROVIDED BY CPRA AS PART OF THE BARRIER ISLAND COMPREHENSIVE MONITORING PROGRAM, 2016.
INFORMATION SHOWN HERE IN REFLECTS CONDITIONS AS THEY EXISTED ON THE SURVEY DATE SHOWN AND CAN ONLY BE CONSIDERED INDICATIVE OF CONDITIONS AT THAT TIME.
BY
DESCRIPTION
DATE
COASTAL
ENGINEERING
CONSULTANTS, INC.
PH: (225) 768-1982
8570 ANSELMO LANE
BATON ROUGE, LA 70810
DRAWN BY: STEVE DARTEZ
DESIGNED BY: MICHAEL T. POFF, P.E.
LICENSE NUMBER: 30048
LOUISIANA COASTAL PROTECTION
AND RESTORATION AUTHORITY
150 TERRACE AVENUE
BATON ROUGE, LA 70802
APPROVED BY: TRAVIS BYLAND, P.E.
TERREBONNE BASIN
BARRIER ISLAND AND BEACH
NOURISHMENT
GENERAL NOTES
STATE PROJECT NUMBER: TE-143
DATE: APRIL 2018
FEDERAL PROJECT NUMBER:
SHEET 3 OF 36
PL
PL
PL
PL
WA
WA
WA
PL
PL
PL
PL
WA
WA
PL
WA
WA
PL
WA
PL
00+00
20+00
60+00
80+00
00
PL
PL
PL
PL
100+00
WA
00
220
+
PL
PL
00
00
160
+
PL
WA
PL
00
240
+
3,565,000 E
PL
3,555,000 E
PL
PL
3,545,000 E
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
180
+
PL
WA
WA
120
+
WA
00
PL
00
WA
140
+
40+00
PL
WA
WA
WA
WA
WA
WA
PL
SURVEY
BASELINE
PL
PL
WA
PL
PL
WA
WA
TBBL-02
WA
PL
PL
WA
WA
WA
PL
WA
PL
PL
PL
WA
A
TBBL-01
WA
PL
PL
W
WA
PL
WA
WA
WA
WA
200
+
A
WA
WA
WA
PL
PL
PL
A
PL
PL
PL
W
PL
PL
PL
PL
WA
PL
PL
PL
WA
WA
WA
PL
A'
PL
PL
PL
PL
PL
PL
PL
PL
PLPL
PL
PL
WA
PL
BEGINNING OF
PROJECT (TB-01)
PL
WA
B
PL
PL
PL
PL PL
PL
WA
PL
PL
WA
WA
WA
PL
PL
PL
TIMBALIER ISLAND
WA
PL
PL
WA
PL
WA
WA
PL
WA
WA
WA
B'
WA
PL
WA
PL
WA
PL
211,000 N
PL
WA
WA
END OF
PROJECT
(TB-02)
PL
211,000 N
WA
WA
TBBL-03
PL
PL
WA
PL
211,000 N
PL
WA
PL
PL
WA
TIMBALIER BAY
WA
PL
L
WA
PL
PL
TIMBALIER CONVEYANCE
PL
CORRIDOR
ALIGNMENT
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
2,500'
DATE
COASTAL
ENGINEERING
CONSULTANTS, INC.
PH: (225) 768-1982
8570 ANSELMO LANE
BATON ROUGE, LA 70810
DRAWN BY: BRETT BORNE, P.E.
DESIGNED BY: MICHAEL T. POFF, P.E.
LICENSE NUMBER: 30048
PL
DESCRIPTION
DUNE CREST
PL
PL
FILL EXTENTS
WA
WORK AREA
PL
PROBABLE PIPELINE
(CMD, 2010 & BOEM,
2007)
PL
PL
PL
3,545,000 E
PL
PL
PL
CONVEYANCE
CORRIDOR
ACCESS CHANNEL
ALIGNMENT
BEACH CREST
PL
NOTES:
PL
1. ALL COORDINATES ARE NAD83, LOUISIANA STATE PLANE,
U.S. SURVEY FEET.
2. AERIAL IMAGE REFERENCE: ©2018 MICROSOFT
CORPORATION ©2018 DIGITALGLOBE ©CNES (2018)
DISTRIBUTION AIRBUS DS; BING.
3. SAND FENCING SHALL BE INSTALLED ALONG THE
ALIGNMENT AND FOR THE LENGTH OF THE DUNE.
4. SEE SHEET 33 FOR ALIGNMENT AND COORDINATE TABLES.
5. FILL EXTENTS ARE APPROXIMATE AND WILL VARY DUE TO
BARRIER ISLAND DYNAMICS. LIMITS OF FILL SHALL BE
FIELD ADJUSTED AT TIME OF CONSTRUCTION.
201,000 N
3,555,000 E
PL
PL
PL
PL
PL
BY
0'
PL
PL
PL
1,250'
LEGEND
PL
PL
PL
PL
2,500'
PL
PL
201,000 N
PL
PL OF MEXICO
GULF
PL
PL
PL
PL
BEACH/DUNE FILL
MARSH FILL
LOUISIANA COASTAL PROTECTION
AND RESTORATION AUTHORITY
150 TERRACE AVENUE
BATON ROUGE, LA 70802
APPROVED BY: TRAVIS BYLAND, P.E.
TERREBONNE BASIN
BARRIER ISLAND AND BEACH
NOURISHMENT
TIMBALIER ISLAND
NOURISHMENT AREA
PLAN VIEW
STATE PROJECT NUMBER: TE-143
DATE: APRIL 2018
FEDERAL PROJECT NUMBER:
SHEET 4 OF 36
NOTES:
1.
2.
3.
4.
5.
LEGEND
SECTIONS ARE VIEWED AS LOOKING WEST.
EXISTING GRADE SURVEY PROVIDED BY CPRA AS PART
OF THE BARRIER ISLAND COMPREHENSIVE MONITORING
PROGRAM, 2016.
DIMENSIONS ARE PROVIDED FOR DESIGN PURPOSES AND
MAY NOT MEASURE ALONG THE SURVEY BASELINE.
A +1.0 FT ELEVATION CONSTRUCTION TOLERANCE SHALL
BE ACCOMMODATED FOR CONSTRUCTION PURPOSES.
MEAN HIGH WATER (MHW) AND MEAN LOW WATER (MLW)
DATA DERIVED FROM THE EAST TIMBALIER ISLAND
RESTORATION PROJECT (TE-118).
ELEVATION (NAVD88, FT)
15
SCALE:
EXISTING GRADE (2016)
H: 1" = 500'
V: 1" = 25'
BEACH & DUNE FILL
CONSTRUCTION
TOLERANCE
MARSH FILL
SOUTH
NORTH
A - A'
10
TARGET EL. +4.5'
1
25
5
TARGET EL. +2.0'
15
10
25
5
1
1
MHW = +0.88'
0
100'
TARGET EL. +7.0'
25
0
MLW = -0.37'
100'
429'
-5
-5
391'
-10
-10
-15
-2000
-1000
-1500
-500
500
0
1000
1500
-15
2000
DISTANCE FROM BASELINE (FT)
ELEVATION (NAVD88, FT)
15
SOUTH
10
NORTH
B - B'
25
TARGET EL. +7.0'
1
TARGET EL. +4.5'
5
0
100'
TARGET EL. +2.0'
25
1
10
5
MHW = +0.88'
MLW = -0.37'
0
25
1
-5
228'
-1000
-1500
-5
391'
-10
-15
-2000
15
100'
-10
0
-500
500
1000
1500
-15
2000
DISTANCE FROM BASELINE (FT)
BY
DESCRIPTION
DATE
COASTAL
ENGINEERING
CONSULTANTS, INC.
PH: (225) 768-1982
8570 ANSELMO LANE
BATON ROUGE, LA 70810
DRAWN BY: BRETT BORNE, P.E.
DESIGNED BY: MICHAEL T. POFF, P.E.
LICENSE NUMBER: 30048
LOUISIANA COASTAL PROTECTION
AND RESTORATION AUTHORITY
150 TERRACE AVENUE
BATON ROUGE, LA 70802
APPROVED BY: TRAVIS BYLAND, P.E.
TERREBONNE BASIN
BARRIER ISLAND AND BEACH
NOURISHMENT
TIMBALIER ISLAND
NOURISHMENT
TYPICAL SECTIONS
STATE PROJECT NUMBER: TE-143
DATE: APRIL 2018
FEDERAL PROJECT NUMBER:
SHEET 5 OF 32
PL
PL
DUNE CREST
LEGEND:
ACCESS CHANNEL
WA
PL
PL
214,000 N
EXISTING EL. -8'
WA
BEACH CREST
TBAW-01
WA
WA
3,547,500 E
214,000 N
WA
3,543,500 E
FILL EXTENTS
3,545,500 E
P
LEGEND
PL
,
TEMPORARY SIDECAST DISPOSAL
EXISTING EL. -7'
WA
PL
PL
WA
BEACH/DUNE FILL
EXISTING GRADE (2016)
WA
3,547,500 E
3,545,500 E
212,000 N
WA
PROBABLE PIPELINE
(CMD, 2010)
EXISTING EL. -5'
PL
WA
PL
5
EXISTING EL. -4'
WA
EXISTING EL. -3'
PL
PL
WA
WA
PL
C'
C
WA
WA
00
PL
150' (MAX)
30' BERM
(MIN)
-10
-15
-15
-600
0
600
DISTANCE FROM ALIGNMENT (FT)
NOTES:
1. CROSSING OF OIL & GAS PIPELINES SHALL BE IN
ACCORDANCE WITH PIPELINE OWNER AND
CONSTRUCTION CONTRACTOR CROSSING AGREEMENTS.
2. MATERIAL REMAINING IN THE TEMPORARY SIDECAST
DISPOSAL AREAS SHALL BE REWORKED TO ±0.5 FEET OF
THE PRE-CONSTRUCTION ELEVATIONS PRIOR TO
DEMOBILIZATION.
3. ELEVATIONS IN THE ACCESS CHANNEL RESULTING FROM
BACKFILLING OPERATIONS SHALL BE NO HIGHER THAN
+0.5 FEET OF THE PRE-CONSTRUCTION ELEVATION.
4. EXISTING GRADE SURVEY PROVIDED BY CPRA AS PART
OF THE BARRIER ISLAND COMPREHENSIVE MONITORING
PROGRAM, 2016.
5. ALL COORDINATES ARE NAD83, LOUISIANA STATE PLANE,
U.S. SURVEY FEET.
6. AERIAL IMAGE FROM ©2018 MICROSOFT CORPORATION
©2018 DIGITALGLOBE ©CNES (2018) DISTRIBUTION AIRBUS
DS; BING.
7. SEE SHEET 33 FOR ALIGNMENT AND COORDINATE TABLES.
PL
220
+
00
WA
120' (MAX)
EL.= -9.0'(MAX)
WA
210
+
00
WA
30' BERM
(MIN)
210,000 N
230
+
5
60' (MAX)
-5
-10
WA
00
PL
240
+
10
190' (MAX)
120' (MAX)
WA
00
WA
PL
200
+
WA
1,000'
EL. = +2.0' (MAX)
(TYP)
1
-5
WA
PL
WA
0'
WEST
0
W
208,000 N
6
60' (MAX)
MLW = -0.37'
EXISTING EL. -1'
WA
PL
3,543,500 E
MHW = +0.88'
0
A
TBAW-03
SURVEY
BASELINE
500'
EL. = +2.0' (MAX)
EXISTING EL. -2'
WA
WA
3,547,500 E
3,545,500 E
WA
PL
WA
210,000 N
WA
WA
TBAW-02
WA
PL
3,543,500 E
WA
WA
PL
WA
210,000 N
1,000'
C - C'
10
ELEVATION (NAVD88, FT)
PL
L
212,000 N
WA
PL
EXISTING EL. -6'
DESIGN
SCALE:
H: 1" = 300'
V: 1" = 15'
EAST
AREA
212,000WORK
N
PL
PL
PL
WA
TEMPORARY
SIDECAST DISPOSAL
WA
3,543,500
E
P
ACCESS CHANNEL
WA
PL
WA
PL
MARSH FILL
WA
DESCRIPTION
DATE
WA
BY
COASTAL
ENGINEERING
CONSULTANTS, INC.
PH: (225) 768-1982
8570 ANSELMO LANE
BATON ROUGE, LA 70810
DRAWN BY: STEVE DARTEZ
DESIGNED BY: MICHAEL T. POFF, P.E.
LICENSE NUMBER: 30048
LOUISIANA COASTAL PROTECTION
AND RESTORATION AUTHORITY
150 TERRACE AVENUE
BATON ROUGE, LA 70802
APPROVED BY: TRAVIS BYLAND, P.E.
TERREBONNE BASIN
BARRIER ISLAND AND BEACH
NOURISHMENT
TIMBALIER ISLAND
ACCESS CHANNEL - WEST
STATE PROJECT NUMBER: TE-143
DATE: APRIL 2018
FEDERAL PROJECT NUMBER:
SHEET 6 OF 36
LEGEND
WA
PL
PL
EXISTING EL. -9'
TEMPORARY SIDECAST DISPOSAL
EXISTING EL. -8'
WA
MARSH FILL
ACCESS CHANNEL
WA
PL
BEACH/DUNE FILL
LEGEND:
210,000 N
WA
BEACH CREST
WA
WA
3,556,500 E
DUNE CREST
TBAE-01
WA
210,000 N
3,558,500 E
PL
FILL EXTENTS
WA
3,554,500 E
210,000 N
EXISTING GRADE (2016)
WA
208,000 N
5
PL
208,000 N
EXISTING EL. -5'
WA
WA
PL
EXISTING EL. -4'
WA
PL
3,554,500 E
WA
PL
PL
PL
00
WA
WA
WA
WA
WA
WA
206,000 N
-5
PL
DATE
204,000 N
COASTAL
ENGINEERING
CONSULTANTS, INC.
WA
WA
00
WA
WA
WA
PH: (225) 768-1982
8570 ANSELMO LANE
BATON ROUGE, LA 70810
DRAWN BY: STEVE DARTEZ
DESIGNED BY: MICHAEL T. POFF, P.E.
LICENSE NUMBER: 30048
3,558,500 E
90+00
100+00
WA
120
+
PL
00
WA
PL
110
+
WA
PL
WA
PL
WA
WA
WA
DESCRIPTION
WA
BY
SURVEY
BASELINE
1,000'
150' (MAX)
120' (MAX)
30' BERM
(MIN)
-10
-15
0
600
NOTES:
1. CROSSING OF OIL & GAS PIPELINES SHALL BE IN
ACCORDANCE WITH PIPELINE OWNER AND
CONSTRUCTION CONTRACTOR CROSSING AGREEMENTS.
2. MATERIAL REMAINING IN THE TEMPORARY SIDECAST
DISPOSAL AREAS SHALL BE REWORKED TO ±0.5 FEET OF
THE PRE-CONSTRUCTION ELEVATIONS PRIOR TO
DEMOBILIZATION.
3. ELEVATIONS IN THE ACCESS CHANNEL RESULTING FROM
BACKFILLING OPERATIONS SHALL BE NO HIGHER THAN
+0.5 FEET OF THE PRE-CONSTRUCTION ELEVATION.
4. EXISTING GRADE SURVEY PROVIDED BY CPRA AS PART
OF THE BARRIER ISLAND COMPREHENSIVE MONITORING
PROGRAM, 2016.
5. ALL COORDINATES ARE NAD83, LOUISIANA STATE PLANE,
U.S. SURVEY FEET.
6. AERIAL IMAGE REFERENCE: ©2018 MICROSOFT
CORPORATION ©2018 DIGITALGLOBE ©CNES (2018)
DISTRIBUTION AIRBUS DS; BING.
7. SEE SHEET 33 FOR ALIGNMENT AND COORDINATE TABLES.
A
0'
0
DISTANCE FROM ALIGNMENT (FT)
80+00
500'
30' BERM
(MIN)
5
60' (MAX)
-5
120' (MAX)
-600
206,000 N
TBAE-02
1,000'
EL. = +2.0' (MAX)
(TYP)
1
170' (MAX)
MLW = -0.37'
PL
130
+
EXISTING EL. -1'
WA
MHW = +0.88'
0
6
60' (MAX)
10
-15
3,558,500 E
PL
D
WA
WEST
EL.= -9.0'(MAX)
WA
WA
EL. = +2.0' (MAX)
-10
PL
WA
EXISTING EL. -3'
WA
D'
WA
PL
WA
WA
EXISTING EL. -2'
PL
D - D'
EAST
10
ELEVATION (NAVD88, FT)
WA
WA
PROBABLE PIPELINE
PL
208,000 N (CMD, 2010)
WA
PL
WORK AREA
3,558,500 E
PL
TEMPORARY
SIDECAST DISPOSAL
3,556,500 E
3,554,500 E
DESIGN
SCALE:
H: 1" = 300'
V: 1" = 15'
EXISTING EL. -6'
WA
WA
WA
PL
EXISTING EL. -7'
ACCESS CHANNEL
LOUISIANA COASTAL PROTECTION
AND RESTORATION AUTHORITY
150 TERRACE AVENUE
BATON ROUGE, LA 70802
APPROVED BY: TRAVIS BYLAND, P.E.
TERREBONNE BASIN
BARRIER ISLAND AND BEACH
NOURISHMENT
TIMBALIER ISLAND
ACCESS CHANNEL - EAST
STATE PROJECT NUMBER: TE-143
DATE: APRIL 2018
FEDERAL PROJECT NUMBER:
SHEET 7 OF 36
LEGEND
PL
FILL EXTENTS
TBDR-01
WA
WA
WA
WA
211,000 N
PL
WA
EXISTING EL. -7'
3,564,500 E
WA
WA
WA
PL
WA
PL
E
PL
WA
WA
PL
PL
PL
PL
TBDR-02
EXISTING EL. -3'
PL
PL
A
EXISTING EL. -1'
WA
MHW = +0.88'
0
175' (MAX)
120' (MAX)
30' BERM
(MIN)
-10
150' (MAX)
120' (MAX)
EL.= -9.0'(MAX)
30' BERM
(MIN)
-10
-15
-15
0
600
NOTES:
1. CROSSING OF OIL & GAS PIPELINES SHALL BE IN
ACCORDANCE WITH PIPELINE OWNER AND
CONSTRUCTION CONTRACTOR CROSSING AGREEMENTS.
2. MATERIAL REMAINING IN THE TEMPORARY SIDECAST
DISPOSAL AREAS SHALL BE REWORKED TO ±0.5 FEET OF
THE PRE-CONSTRUCTION ELEVATIONS PRIOR TO
DEMOBILIZATION.
3. ELEVATIONS IN THE ACCESS CHANNEL RESULTING FROM
BACKFILLING OPERATIONS SHALL BE NO HIGHER THAN
+0.5 FEET OF THE PRE-CONSTRUCTION ELEVATION.
4. EXISTING GRADE SURVEY PROVIDED BY CPRA AS PART
OF THE BARRIER ISLAND COMPREHENSIVE MONITORING
PROGRAM, 2016.
5. ALL COORDINATES ARE NAD83, LOUISIANA STATE PLANE,
U.S. SURVEY FEET.
6. AERIAL IMAGE REFERENCE: ©2018 MICROSOFT
CORPORATION ©2018 DIGITALGLOBE ©CNES (2018)
DISTRIBUTION AIRBUS DS; BING.
7. SEE SHEET 33 FOR ALIGNMENT AND COORDINATE TABLES.
PL
TBDR-04
PL
WA
40+00
WA
50+00
WA
WA
WA
60+00
WA
WA
WA
DESCRIPTION
30+00
WA
205,000 N
205,000 N
20+00 3,564,500 E
PL
PL
3,560,500 E
-5
DISTANCE FROM ALIGNMENT (FT)
WA
70+00
5
45' (MAX)
-5
PL
DOCK
0'
SURVEY
BASELINE
1,200'
DATE
COASTAL
ENGINEERING
CONSULTANTS, INC.
WA
WA
PH: (225) 768-1982
8570 ANSELMO LANE
BATON ROUGE, LA 70810
DRAWN BY: STEVE DARTEZ
EL. = +2.0' (MAX)
(TYP)
1
0
TBDR-03
BY
6
45' (MAX)
MLW = -0.37'
WA
600'
10
A
1,200'
WEST
W
WA
WA
WA
WA
PL
WA
EL. = +2.0' (MAX)
-600
207,000 N
PL
W
A
207,000 N
W
EXISTING EL. -2'
ELEVATION (NAVD88, FT)
WA
WA
PL
PL
EXISTING EL. -4'
E - E'
EAST
10
5
EXISTING EL. -5'
E'
SCALE:
H: 1" = 300'
V: 1" = 15'
209,000 N
EXISTING EL. -6'
PROBABLE PIPELINE
(CMD, 2010)
3,560,500 E
209,000 N
WA
WORK AREA
PL
3,562,500 E
WA
WA
PL
DOCK
DESIGN
WA
PL
TEMPORARY
SIDECAST DISPOSAL
EXISTING GRADE (2016)
EXISTING EL. -8'
PL
ACCESS CHANNEL
TEMPORARY SIDECAST DISPOSAL
WA
MARSH FILL
3,564,500 E
WA
WA
PL
BEACH/DUNE FILL
ACCESS CHANNEL
211,000 N
3,562,500 E
BEACH CREST
3,564,500 E
PL
DUNE CREST
WA
LEGEND:
EXISTING EL. -9'
DESIGNED BY: MICHAEL T. POFF, P.E.
LICENSE NUMBER: 30048
LOUISIANA COASTAL PROTECTION
AND RESTORATION AUTHORITY
150 TERRACE AVENUE
BATON ROUGE, LA 70802
APPROVED BY: TRAVIS BYLAND, P.E.
TERREBONNE BASIN
BARRIER ISLAND AND BEACH
NOURISHMENT
TIMBALIER ISLAND
DOCK REMOVAL
ACCESS CHANNEL
STATE PROJECT NUMBER: TE-143
DATE: APRIL 2018
FEDERAL PROJECT NUMBER:
SHEET 8 OF 36
10 EQUAL SPACES @ 10'-0" O.C.
10'
(TYP.)
8'
EL. +7.0' NAVD88
7'
(TYP.)
3"x12"x8' C.C.A. TREATED
TIMBER DECKING, EL. +4.0' NAVD88
CLASS "B" TREATED TIMBER PILE
LENGTH: 30' (TYP.), EL. +7.0' NAVD88
EL. +4.0' NAVD88
MHW = +0.88' NAVD88
MLW = -0.37' NAVD88
4"x8" TREATED
TIMBER X-BRACES
8"x12" TREATED TIMBER BOARDS
ELEVATION VIEW
TIMBALIER ISLAND DOCK FACILITY
NOT TO SCALE
102'
10 EQUAL SPACES @ 10'-0" O.C.
3"x12"x8' C.C.A. TREATED
TIMBER DECKING
1'
SECTION 1 - 1'
DOCK DETAIL (TIMBER)
NOT TO SCALE
1
NOTES:
1. DOCK INSTALLED AS PART OF TIMBALIER ISLAND
DUNE/MARSH RESTORATION PROJECT (TE-40).
2. ALL MATERIALS REMAINING AS PART OF THE DOCK SHALL
BE REMOVED AND DISPOSED OF IN AN APPROVED
DISPOSAL FACILITY IN ACCORDANCE WITH ALL FEDERAL
AND STATE LAWS.
3. ALL PILINGS ASSOCIATED WITH THE DOCK STRUCTURE
SHALL BE REMOVED TO A DEPTH OF AT LEAST TEN (10)
FEET BELOW EXISTING GROUND.
4. DOCK FASTENING HARDWARE IS COMPRISED OF 7/8"
GALVANIZED BOLTS WITH O.G. WASHERS AND NUTS.
5. ELEVATIONS OF CONSTRUCTION ARE ONLY RELEVANT TO
THE TIME OF CONSTRUCTION AND MAY NOT REFLECT
CURRENT CONDITIONS.
6. DOCK DRAWINGS OBTAINED FROM THE TIMBALIER ISLAND
DUNE/MARSH RESTORATION PROJECT (TE-40) AS-BUILT
DRAWINGS.
BY
DESCRIPTION
DATE
PLAN VIEW
NOT TO SCALE
COASTAL
ENGINEERING
CONSULTANTS, INC.
PH: (225) 768-1982
8570 ANSELMO LANE
BATON ROUGE, LA 70810
DRAWN BY: STEVE DARTEZ
DESIGNED BY: MICHAEL T. POFF, P.E.
LICENSE NUMBER: 30048
LOUISIANA COASTAL PROTECTION
AND RESTORATION AUTHORITY
150 TERRACE AVENUE
BATON ROUGE, LA 70802
APPROVED BY: TRAVIS BYLAND, P.E.
TERREBONNE BASIN
BARRIER ISLAND AND BEACH
NOURISHMENT
TIMBALIER ISLAND
DOCK REMOVAL DETAIL
STATE PROJECT NUMBER: TE-143
DATE: APRIL 2018
FEDERAL PROJECT NUMBER:
SHEET 9 OF 32
PL
PL
3,491,000 E
WA
WA
WA
WA
PL
3,479,000 E
PL
WA
WA
WA
S
OY
S
A
WA
S
OY
WA
WA
WA
WA
WA
WA
PL
PL
PL
PL
PL
PL
PL
197,000 N
3,491,000 E
WA
YS
O
WA
YS
O
OY
WA
WA
W
PL
OYS
OYS
A
S
OY
280+00
300+00
3,467,000 E
W
PL
PL
PL
PL
PL
197,000 NPL
PL
PL
PL
PL
PL
NOTES:
1. ALL COORDINATES ARE NAD83, LOUISIANA STATE PLANE,
U.S. SURVEY FEET.
2. AERIAL IMAGE REFERENCE: ©2018 MICROSOFT
CORPORATION ©2018 DIGITALGLOBE ©CNES (2018)
DISTRIBUTION AIRBUS DS; BING.
3. SAND FENCING SHALL BE INSTALLED ALONG THE
ALIGNMENT AND FOR THE LENGTH OF THE FILL.
4. SEE SHEET 34 FOR ALIGNMENT AND COORDINATE TABLES.
5. UPLAND ACCESS CORRIDOR SHALL BE ALLOWED ONLY
OVER UNVEGETATED SEGMENTS OF ISLAND.
6. FILL EXTENTS ARE APPROXIMATE AND WILL VARY DUE TO
BARRIER ISLAND DYNAMICS. LIMITS OF FILL SHALL BE
FIELD ADJUSTED AT TIME OF CONSTRUCTION.
3,000'
DATE
COASTAL
ENGINEERING
CONSULTANTS, INC.
PH: (225) 768-1982
8570 ANSELMO LANE
BATON ROUGE, LA 70810
DRAWN BY: BRETT BORNE, P.E.
PL
PL
197,000 N
DESCRIPTION
PL
PL
G
0'
SURVEY
BASELINE
PL
GULF OF MEXICO
TEBL-01
TEBL-02
PL
F
PL
TRINITY/EAST CONVEYANCE
CORRIDOR ALIGNMENT
1,500'
A
WA
PL
140+00
WA
PL
200+00
220+00
WA
260+00
WA
WA
240+00
A
WA
WA
PL
WA
WA
180+00
PL
WA
160+00
A
PL
W
TEBL-03
WA
0
60+0
PL
W
PLOYS
A
PL
PL
PL
OYS
W
00
100+
G'
PL
END OF
PROJECT (TE-02)
PL
A
BEGINNING OF
PROJECT (TE-01)
00
120+
PL
W
PL
WA
OY
S
F'
0
80+0
S
OY
S
OY
OYS
PL
PL
PL
PL
PL
OYS
PL
W
PL
3,479,000 E
3,467,000 E
PL
PL
PLPL
PL
PL
OYS
PL
PL
TRINITY- EAST ISLAND
0
40+0
PL
WA
PL
PL
WA
PL
0
20+0
PL
WA
PL
PL
WA
PL
PL
0
00+0
PLPL
WA
WA
PL
PL
PL
BY
209,000 N
WA
PL
3,000'
209,000 N
PL
PLPL
LAKE PELTO
WA
PLPL
209,000 N
DESIGNED BY: MICHAEL T. POFF, P.E.
LICENSE NUMBER: 30048
LOUISIANA COASTAL PROTECTION
AND RESTORATION AUTHORITY
150 TERRACE AVENUE
BATON ROUGE, LA 70802
APPROVED BY: TRAVIS BYLAND, P.E.
LEGEND
PL
PL
ACCESS CHANNEL
UPLAND ACCESS
PL
CORRIDOR
PL
WORK AREA
PL
PL
BEACH CREST
FILL EXTENTS
WA
BEACH FILL
OYS
CONVEYANCE
CORRIDOR
TERREBONNE BASIN
BARRIER ISLAND AND BEACH
NOURISHMENT
PL
OYSTER LEASE
(LDWF, 2018)
PROBABLE PIPELINE
(CMD 2010, BOEM,
2007)
TRINITY-EAST ISLAND
NOURISHMENT AREA
PLAN VIEW
STATE PROJECT NUMBER: TE-143
DATE: APRIL 2018
FEDERAL PROJECT NUMBER:
SHEET 10 OF 36
LEGEND
NOTES:
1.
2.
3.
4.
5.
6.
SECTIONS ARE VIEWED AS LOOKING WEST.
EXISTING GRADE SURVEY PROVIDED BY CPRA AS PART
OF THE BARRIER ISLAND COMPREHENSIVE MONITORING
PROGRAM, 2016.
DIMENSIONS ARE PROVIDED FOR DESIGN PURPOSES AND
MAY NOT MEASURE ALONG THE SURVEY BASELINE.
A +1.0 FT ELEVATION CONSTRUCTION TOLERANCE SHALL
BE ACCOMMODATED FOR CONSTRUCTION PURPOSES.
FULL POSSIBLE TEMPLATE EXTENTS SHOWN FOR
CONSISTENCY WITH THE DESIGN PLAN VIEW AND TO
ACCOUNT FOR POTENTIAL CHANGES IN THE EXISTING
GRADE BETWEEN PERMITTING AND CONSTRUCTION. NO
EXISTING TOPOGRAPHY WILL BE DEGRADED BELOW
DESIGN TEMPLATE ELEVATIONS.
MEAN HIGH WATER (MHW) AND MEAN LOW WATER (MLW)
DATA DERIVED FROM THE EAST TIMBALIER ISLAND
RESTORATION PROJECT (TE-118).
ELEVATION (NAVD88, FT)
15
BEACH FILL
DESIGN
CONSTRUCTION TOLERANCE
POSSIBLE DESIGN EXTENTS
POSSIBLE TOLERANCE EXTENTS
NORTH
F - F'
10
859'
TARGET EL. +5.0'
25
1
5
10
5
MHW = +0.88'
0
15
0
MLW = -0.37'
-5
-5
-10
-10
15
ELEVATION (NAVD88, FT)
H: 1" = 500'
V: 1" = 25'
SOUTH
-15
-2000
-1500
-1000
-500
0
DISTANCE FROM BASELINE (FT)
500
1000
1500
SOUTH
10
1000'
TARGET EL. +5.0'
15
10
25
5
0
-15
2000
NORTH
G - G'
5
1
MHW = +0.88'
0
MLW = -0.37'
-5
-5
-10
-10
-15
-2000
BY
SCALE:
EXISTING GRADE (2016)
DESCRIPTION
-1500
-1000
DATE
-500
0
DISTANCE FROM BASELINE (FT)
COASTAL
ENGINEERING
CONSULTANTS, INC.
PH: (225) 768-1982
8570 ANSELMO LANE
BATON ROUGE, LA 70810
DRAWN BY: BRETT BORNE, P.E.
DESIGNED BY: MICHAEL T. POFF, P.E.
LICENSE NUMBER: 30048
500
LOUISIANA COASTAL PROTECTION
AND RESTORATION AUTHORITY
150 TERRACE AVENUE
BATON ROUGE, LA 70802
APPROVED BY: TRAVIS BYLAND, P.E.
1000
1500
TERREBONNE BASIN
BARRIER ISLAND AND BEACH
NOURISHMENT
-15
2000
TRINITY-EAST ISLAND
NOURISHMENT
TYPICAL SECTIONS
STATE PROJECT NUMBER: TE-143
DATE: APRIL 2018
FEDERAL PROJECT NUMBER:
SHEET 11 OF 36
A
OY
S
A
WA
OYS
OY
S
WA
WA
PL
PL
WA
WA
WA
WA
WA
WA
WA
WA
WA
WA
WA
WA
WA
WA
WA
WA
WA
WA
WA
WA
PL
WA
WA
WA
240+00
TEUC-02
WA
WA
WA
WA
WA
WA
PL
WA
PL A
W
WA
PL
WA
WA
WA
WA
WA
WA
PL
WA
WA
A
PL
WA
PL
W
PL
WA
A
PL
PL
W
PL
PL
160+00
200+00
220+00
PL
WA
180+00
WA
PL
WA
WA
PL
W
OYS
A
WA
PL
W
PL
TEUC-01
A
WA
YS
O
PL
W
202,500 N
W
PL
PL
OYS
3,478,500 E
3,474,500 E
S
OYS
WA
PL
WA
OYS
A
202,500 N
W
WA
A
PL
PL
OYS
W
3,470,500 E
A
PL
PL
PL
W
OY
WA
A
WA
PL
202,500 N
PL
W
WA
PL
WA
OYS
A
PL
W
PL
PL
WA
S
OY
A
PL
PL
W
WA
PL
PL
PL
PL
PL
TEUC-03
PL
WA
PL
WA
PL
TEUC-05
PL
PL
PL
PL
PL
3,474,500 E
3,470,500 E
TEUC-04
PL
PL
PL
PL
PL
198,500 N
LEGEND
198,500 N
PL
PL
BEACH CREST
1,000'
500'
0'
BY
DESCRIPTION
NOTES:
1. ALL COORDINATES ARE NAD83, LOUISIANA STATE PLANE,
U.S. SURVEY FEET.
2. AERIAL IMAGE REFERENCE: ©2018 MICROSOFT
CORPORATION ©2018 DIGITALGLOBE ©CNES (2018)
DISTRIBUTION AIRBUS DS; BING.
3. SEE SHEET 34 FOR ALIGNMENT AND COORDINATE TABLES.
4. UPLAND ACCESS CORRIDOR SHALL BE ALLOWED ONLY
OVER UNVEGETATED SEGMENTS OF ISLAND.
1,000'
DATE
COASTAL
ENGINEERING
CONSULTANTS, INC.
PH: (225) 768-1982
8570 ANSELMO LANE
BATON ROUGE, LA 70810
DRAWN BY: STEVE DARTEZ
DESIGNED BY: MICHAEL T. POFF, P.E.
LICENSE NUMBER: 30048
LOUISIANA COASTAL PROTECTION
AND RESTORATION AUTHORITY
150 TERRACE AVENUE
BATON ROUGE, LA 70802
APPROVED BY: TRAVIS BYLAND, P.E.
FILL EXTENTS
BEACH/DUNE FILL
ACCESS CHANNEL
ALIGNMENT
WA
OYS
PL
CONVEYANCE
PL
CORRIDORSPL
UPLAND ACCESS PL
CORRIDOR
WORK AREA
OYSTER LEASE
(LDWF, 2018)
PROBABLE PIPELINE
(CMD, 2010)
TERREBONNE BASIN
TRINITY-EAST ISLAND
BARRIER ISLAND AND BEACH
UPLAND ACCESS CORRIDOR
NOURISHMENT
STATE PROJECT NUMBER: TE-143
DATE: APRIL 2018
FEDERAL PROJECT NUMBER:
SHEET 12 OF 36
LEGEND
PL
OYS
PL
S
O Y PL
S
OY
PL
BEACH FILL
S
OY
S
OY
YS
O
OY
WA
OYS
WA
3,470,500 E
WA
WA
WA
EXISTING EL. -1'
S
WA
OY
S
WA
OYS
WA
WA
PL
PL
OYS
WA
WA
WA
PL
PL
WA
PL
PL
PL
S
OY
WA
WA
200,500 N
WA
PL
WA
220+00
WA
198,500 N
198,500 N
1,000'
500'
0'
BY
DESCRIPTION
-5
170' (MAX)
140' (MAX)
30' BERM
(MIN)
150' (MAX)
140' (MAX)
EL.= -9.0'(MAX)
30' BERM
(MIN)
-10
-15
-15
-600
0
600
DISTANCE FROM ALIGNMENT (FT)
NOTES:
1. CROSSING OF OIL & GAS PIPELINES SHALL BE IN
ACCORDANCE WITH PIPELINE OWNER AND
CONSTRUCTION CONTRACTOR CROSSING AGREEMENTS.
2. MATERIAL REMAINING IN THE TEMPORARY SIDECAST
DISPOSAL AREAS SHALL BE REWORKED TO ±0.5 FEET OF
THE PRE-CONSTRUCTION ELEVATIONS PRIOR TO
DEMOBILIZATION.
3. ELEVATIONS IN THE ACCESS CHANNEL RESULTING FROM
BACKFILLING OPERATIONS SHALL BE NO HIGHER THAN
+0.5 FEET OF THE PRE-CONSTRUCTION ELEVATION.
4. EXISTING GRADE SURVEY PROVIDED BY CPRA AS PART
OF THE BARRIER ISLAND COMPREHENSIVE MONITORING
PROGRAM, 2016.
5. ALL COORDINATES ARE NAD83, LOUISIANA STATE PLANE,
U.S. SURVEY FEET.
6. AERIAL IMAGE REFERENCE: ©2018 MICROSOFT
CORPORATION ©2018 DIGITALGLOBE ©CNES (2018)
DISTRIBUTION AIRBUS DS; BING.
7. SEE SHEET 34 FOR ALIGNMENT AND COORDINATE TABLES.
8. UPLAND ACCESS CORRIDOR SHALL BE ALLOWED ONLY
OVER UNVEGETATED SEGMENTS OF ISLAND.
PL
WA
WA
WA
WA
198,500 N
1,000'
DATE
6 (TYP)
1
-5
PL
COASTAL
ENGINEERING
CONSULTANTS, INC.
PH: (225) 768-1982
8570 ANSELMO LANE
BATON ROUGE, LA 70810
DRAWN BY: STEVE DARTEZ
0
3,472,500 E
3,470,500 E
3,468,500 E
WA
230+W0A0
WA
240+00
WA
250+00
260+00
WA
WA
WA
WA
W
5
45' (MAX)
MLW = -0.37'
200,500 N
PL
TEAW-02
A
45' (MAX)
-10
3,472,500 E
OYS
OYS
WA
EXISTING EL. -5'
MHW = +0.88'
0
EL. = +2.0' (MAX)
EL. = +2.0' (MAX)
WA
OYS
OYS
H
WA
OYS
OYS
10
A
S
OY
3,560,500 E
OY
OYS
WA
OYS
PL
OYS
WEST
10
5
EXISTING EL. -4'
PL
H - H'
EAST
202,500 N
EXISTING EL. -7'
EXISTING EL. -6'
PL
OYS
DESIGN
SCALE:
H: 1" = 300'
V: 1" = 15'
ELEVATION (NAVD88, FT)
S
OYS
WA
EXISTING EL. -8'
H'
3,468,500 E
EXISTING EL. -9'
3,472,500 E
YS
O
WA
WA
OYS
PL
EXISTING GRADE (2016)
PL
202,500 N
PROBABLE PIPELINE
(CMD, 2010)
PL
PL
WA
S
OY
OYSTER LEASE
(LDWF, 2018)
OYS
PL
PL
WORK AREA
209,000 N
TEMPORARY SIDECAST DISPOSAL
PL
TEAW-01
UPLAND CORRIDOR
WA
ACCESS CHANNEL
PL
ACCESS CHANNEL
S
TEMPORARY
OY
SIDECAST
DISPOSAL
S
OYS
LEGEND:
PL
OY
OYS
204,500 N
3,472,500 E
204,500 N
3,470,500 E
PL
BEACH CREST
OYS
S
OY
3,560,500 E
PL
FILL EXTENTS
WA
211,000 N
DESIGNED BY: MICHAEL T. POFF, P.E.
LICENSE NUMBER: 30048
LOUISIANA COASTAL PROTECTION
AND RESTORATION AUTHORITY
150 TERRACE AVENUE
BATON ROUGE, LA 70802
APPROVED BY: TRAVIS BYLAND, P.E.
TERREBONNE BASIN
BARRIER ISLAND AND BEACH
NOURISHMENT
TRINITY-EAST ISLAND
ACCESS CHANNEL - WEST
STATE PROJECT NUMBER: TE-143
DATE: APRIL 2018
FEDERAL PROJECT NUMBER:
SHEET 13 OF 36
LEGEND
3,480,000 E
3,478,000 E
ACCESS CHANNEL
TEAE-01
WA
3,479,000 E
I'
WA
WA
WA
205,000 N
I
5
EXISTING EL. -7'
EXISTING EL. -5'
A
WA
W
EXISTING EL. -4'
W
A
EXISTING EL. -3'
W
W
A
EXISTING EL. -2'
W
A
W
A
WA
W
TEAE-02
A
W
W
A
A
A
A
W
A
A
W
A
WA
PL
3,480,000 E
PL
1,000'
500'
0'
-5
170' (MAX)
140' (MAX)
30' BERM
(MIN)
150' (MAX)
140' (MAX)
EL.= -9.0'(MAX)
30' BERM
(MIN)
-10
-15
-15
-600
0
600
DISTANCE FROM ALIGNMENT (FT)
NOTES:
1. CROSSING OF OIL & GAS PIPELINES SHALL BE IN
ACCORDANCE WITH PIPELINE OWNER AND
CONSTRUCTION CONTRACTOR CROSSING AGREEMENTS.
2. MATERIAL REMAINING IN THE TEMPORARY SIDECAST
DISPOSAL AREAS SHALL BE REWORKED TO ±0.5 FEET OF
THE PRE-CONSTRUCTION ELEVATIONS PRIOR TO
DEMOBILIZATION.
3. ELEVATIONS IN THE ACCESS CHANNEL RESULTING FROM
BACKFILLING OPERATIONS SHALL BE NO HIGHER THAN
+0.5 FEET OF THE PRE-CONSTRUCTION ELEVATION.
4. EXISTING GRADE SURVEY PROVIDED BY CPRA AS PART
OF THE BARRIER ISLAND COMPREHENSIVE MONITORING
PROGRAM, 2016.
5. ALL COORDINATES ARE NAD83, LOUISIANA STATE PLANE,
U.S. SURVEY FEET.
6. AERIAL IMAGE REFERENCE: ©2018 MICROSOFT
CORPORATION ©2018 DIGITALGLOBE ©CNES (2018)
DISTRIBUTION AIRBUS DS; BING.
7. SEE SHEET 34 FOR ALIGNMENT AND COORDINATE TABLES.
WA
W
PL
6 (TYP)
1
-10
00
120+
WA
5
45' (MAX)
-5
203,000 N
00
130+
150+00
160+00
WA
WA
PL
10
0
A
WA
PL
EL. = +2.0' (MAX)
45' (MAX)
MLW = -0.37'
A
140+00
PL
WA
MHW = +0.88'
0
EXISTING EL. -1'
W
WEST
EL. = +2.0' (MAX)
A
W
W
3,478,000 E
A
EXISTING EL. -6'
3,482,000 E
W
W
TEAE-03
203,000 N
I - I'
EAST
10
WA
3,478,000 E
SCALE:
H: 1" = 300'
V: 1" = 15'
WA
209,000 N
DESIGN
WA
WA
PROBABLE PIPELINE
(CMD, 2010)
PL
EXISTING GRADE (2016)
EXISTING EL. -9'
EXISTING EL. -8'
WORK AREA
WA
TEMPORARY SIDECAST DISPOSAL
WA
WA
WA
TEMPORARY
SIDECAST DISPOSAL
ACCESS CHANNEL
WA
BEACH FILL
LEGEND:
207,000 N
3,482,000 E
207,000 N
BEACH CREST
ELEVATION (NAVD88, FT)
FILL EXTENTS
211,000 N
1,000'
PL
201,000
N
PL
BY
DESCRIPTION
DATE
COASTAL
ENGINEERING
CONSULTANTS, INC.
PH: (225) 768-1982
8570 ANSELMO LANE
BATON ROUGE, LA 70810
DRAWN BY: STEVE DARTEZ
DESIGNED BY: MICHAEL T. POFF, P.E.
LICENSE NUMBER: 30048
LOUISIANA COASTAL PROTECTION
AND RESTORATION AUTHORITY
150 TERRACE AVENUE
BATON ROUGE, LA 70802
APPROVED BY: TRAVIS BYLAND, P.E.
TERREBONNE BASIN
BARRIER ISLAND AND BEACH
NOURISHMENT
TRINITY-EAST ISLAND
ACCESS CHANNEL - EAST
STATE PROJECT NUMBER: TE-143
DATE: APRIL 2018
FEDERAL PROJECT NUMBER:
SHEET 14 OF 36
208,600 N
LEGEND:
3,493,600 E
208,600 N
3,492,000 E
3,490,400 E
208,600 N
ACCESS CHANNEL
TEMPORARY SIDECAST DISPOSAL
DESIGN
WA
WA
EXISTING EL. -9'
EXISTING GRADE (2016)
TEDR-01
WA
SCALE:
H: 1" = 300'
V: 1" = 15'
WA
WA
EXISTING EL. -6'
EXISTING EL. -5'
WA
WA
WA
TEDR-03
EXISTING EL. -4'
WA
WA
TEDR-02
WA
3,490,400 E
WA
WA
WA
WA
800'
140' (MAX)
30' BERM
(MIN)
-10
-15
0'
0
600
DISTANCE FROM ALIGNMENT (FT)
3,493,600 E
203,800 N
400'
150' (MAX)
EL.= -9.0'(MAX)
NOTES:
1. CROSSING OF OIL & GAS PIPELINES SHALL BE IN
ACCORDANCE WITH PIPELINE OWNER AND
CONSTRUCTION CONTRACTOR CROSSING AGREEMENTS.
2. MATERIAL REMAINING IN THE TEMPORARY SIDECAST
DISPOSAL AREAS SHALL BE REWORKED TO ±0.5 FEET OF
THE PRE-CONSTRUCTION ELEVATIONS PRIOR TO
DEMOBILIZATION.
3. ELEVATIONS IN THE ACCESS CHANNEL RESULTING FROM
BACKFILLING OPERATIONS SHALL BE NO HIGHER THAN
+0.5 FEET OF THE PRE-CONSTRUCTION ELEVATION.
4. EXISTING GRADE SURVEY PROVIDED BY CPRA AS PART
OF THE BARRIER ISLAND COMPREHENSIVE MONITORING
PROGRAM, 2016.
5. ALL COORDINATES ARE NAD83, LOUISIANA STATE PLANE,
U.S. SURVEY FEET.
6. AERIAL IMAGE REFERENCE: ©2018 MICROSOFT
CORPORATION ©2018 DIGITALGLOBE ©CNES (2018)
DISTRIBUTION AIRBUS DS; BING.
7. SEE SHEET 34 FOR ALIGNMENT AND COORDINATE TABLES.
TEDR-04
3,492,000 E
3,490,400 E
WA
203,800 N
140' (MAX)
30' BERM
(MIN)
-15
WA
CHANNEL
TEMPORARY
SIDECAST DISPOSAL
-5
170' (MAX)
-600
0
10+0
203,800 NACCESS
6 (TYP)
1
-5
0
20+0
DOCK
5
0
0
30+0
LEGEND
10
45' (MAX)
MLW = -0.37'
0
00+0
EXISTING EL. -1'
MHW = +0.88'
0
EL. = +2.0' (MAX)
45' (MAX)
-10
DOCK
WA
205,400 N
3,492,000 W
EA
J'
EXISTING EL. -2'
WA
205,400 N
EXISTING EL. -3'
WA
EXISTING EL. -7'
WEST
EL. = +2.0' (MAX)
5
WA
EXISTING EL. -8'
J - J'
EAST
10
ELEVATION (NAVD88, FT)
WA
WA
207,000 N
J
3,493,600 E
3,490,400 E
WA
207,000 N
800'
WORK AREA
BY
DESCRIPTION
DATE
COASTAL
ENGINEERING
CONSULTANTS, INC.
PH: (225) 768-1982
8570 ANSELMO LANE
BATON ROUGE, LA 70810
DRAWN BY: STEVE DARTEZ
DESIGNED BY: MICHAEL T. POFF, P.E.
LICENSE NUMBER: 30048
LOUISIANA COASTAL PROTECTION
AND RESTORATION AUTHORITY
150 TERRACE AVENUE
BATON ROUGE, LA 70802
APPROVED BY: TRAVIS BYLAND, P.E.
TERREBONNE BASIN
BARRIER ISLAND AND BEACH
NOURISHMENT
TRINITY-EAST ISLAND
DOCK REMOVAL
ACCESS CHANNEL
STATE PROJECT NUMBER: TE-143
DATE: APRIL 2018
FEDERAL PROJECT NUMBER:
SHEET 15 OF 36
10 EQUAL SPACES @ 8'-10 9/16" O.C.
10'
(TYP.)
8'
EL. +7.0' NAVD88
7'
(TYP.)
3"x12"x8' C.C.A. TREATED
TIMBER DECKING
CLASS "B" TREATED TIMBER PILE
LENGTH: 30' (TYP.)
20'
EL. +4.0' NAVD88
MHW = +0.88' NAVD88
MLW = -0.37' NAVD88
4"x8" TREATED
TIMBER X-BRACES
8"x12" TREATED TIMBER BOARDS
ELEVATION VIEW
TIMBALIER ISLAND DOCK FACILITY
NOT TO SCALE
100'
10 EQUAL SPACES @ 8'-10 9/16" O.C.
3"x12"x8' C.C.A. TREATED
TIMBER DECKING
SECTION 2-2'
DOCK DETAIL (TIMBER)
NOT TO SCLAE
2'
19.4'
8'
2
PLAN VIEW
NOTES:
1. DOCK INSTALLED AS PART OF THE ISLE DERNIERES
RESTORATION PROJECT - EAST ISLAND - PHASE 0.
2. ALL MATERIALS REMAINING AS PART OF THE DOCK SHALL
BE REMOVED AND DISPOSED OF IN AN APPROVED
DISPOSAL FACILITY IN ACCORDANCE WITH ALL FEDERAL
AND STATE LAWS.
3. ALL PILINGS ASSOCIATED WITH THE DOCK STRUCTURE
SHALL BE REMOVED TO A DEPTH OF AT LEAST TEN (10)
FEET BELOW EXISTING GROUND.
4. DOCK FASTENING HARDWARE IS COMPRISED OF 7/8"
GALVANIZED BOLTS WITH O.G. WASHERS AND NUTS.
5. ELEVATIONS OF CONSTRUCTION ARE ONLY RELEVANT TO
THE TIME OF CONSTRUCTION AND MAY NOT REFLECT
CURRENT CONDITIONS.
6. DOCK DRAWINGS OBTAINED FROM THE ISLE DERNIERES
RESTORATION PROJECT - EAST ISLAND PHASE 0 (TE-20)
AS-BUILT DRAWINGS.
BY
DESCRIPTION
DATE
NOT TO SCALE
COASTAL
ENGINEERING
CONSULTANTS, INC.
PH: (225) 768-1982
8570 ANSELMO LANE
BATON ROUGE, LA 70810
DRAWN BY: STEVE DARTEZ
DESIGNED BY: MICHAEL T. POFF, P.E.
LICENSE NUMBER: 30048
LOUISIANA COASTAL PROTECTION
AND RESTORATION AUTHORITY
150 TERRACE AVENUE
BATON ROUGE, LA 70802
APPROVED BY: TRAVIS BYLAND, P.E.
TERREBONNE BASIN
BARRIER ISLAND AND BEACH
NOURISHMENT
TRINITY-EAST ISLAND
DOCK REMOVAL DETAIL
STATE PROJECT NUMBER: TE-143
DATE: APRIL 2018
FEDERAL PROJECT NUMBER:
SHEET 16 OF 36
AA
AA
LEGEND
DESIGN CUT TOE
PL
AA
BATHYMETRIC CONTOUR
(OSI, 2015)
PL
OSI-15-VC-1
AA
PL
AA
AA
3,499,200 E
AA
AA
3,496,800 E
AA
AA
OSI-15-VC-2
PL
PL
150,200 N
PL
AA
SS-02
PL
PL
AA
AA
PL
AA
SS-04
AA
AA
AA
OSI-15-VC-16
PL
OSI-15-VC-25
AA
AA
OSI-15-VC-10
AA
OSI-15-VC-7
PL
OSI-15-VC-26
OSI-15-VC-19
AA
SS-08
147,800 N
AA
3,492,000 E
AA
AA
AA
PL
K'
OSI-15-VC-20
OSI-15-VC-13
OSI-15-VC-4
AA
AA
OSI-15-VC-18
SS-07
OSI-15-VC-9
AA
SS-03
3,016,000 E
AA
AA
OSI-15-VC-15
OSI-15-VC-3
ALLOWABLE ANCHOR AREA
AA
AA
L'
OSI-15-VC-12
OSI-15-VC-6
SS-09
CONVEYANCE CORRIDORS
150,200 N
AA
AA
OSI-15-VC-8
SS-11
SS-10
AVOIDANCE AREAS (OSI, 2015)
2015 SURVEY LIMITS
PL
M'
150,200 N
DESIGN CUT: -37FT
MAX DISTURBANCE -40FT
PL
AA
OSI-15-VC-5
AA
AA
3,492,000 E
PIPELINES (OSI, 2015)
AA
AA
N'
DESIGN CUT: -40FT
MAX DISTURBANCE: -43FT
147,800 N
AA
AA
PL
PL
AA
AA
OSI-15-VC-1
VIBRACORE (OSI, 2015)
AA
AA
SS-01
DESIGN CUT: -36FT
MAX DISTURBANCE: -39FT
AA
PL
DESIGN CUT: -38FT
MAX DISTURBANCE: -41FT
AA
2015 SURVEY LIMITS
DESIGN CUT: -35FT
MAX DISTURBANCE: -38FT
SS-05
OSI-15-VC-14
OSI-15-VC-23
OSI-15-VC-11
OSI-15-VC-30
OSI-15-VC-24
OSI-15-VC-21
OSI-15-VC-29
OSI-15-VC-17
AA
SS-07
OSI-15-VC-22
SS-06
600'
0'
BY
DESCRIPTION
AA
AA
AA
AA
AA
AA
SURVEY
AA
BASELINE
AA
AA
SSBL-01
AA
PL
AA
00+00
PL
04+00
08+00
12+00
PL 3,016,000 E
145,400 N
16+00
20+00
32+00
36+00
40+00
44+00
145,400 N
24+00
K
48+00
60+00
64+00
68+00
145,400 N
145,400 N
NOTES:
1. GEOPHYSICAL, GEOTECHNICAL, AND PIPELINE DATA FROM OSI, 2015.
2. ELEVATIONS ARE NAVD88, U.S. SURVEY FEET.
3. COORDINATES ARE NAD83, LA STATE PLANE, U.S. SURVEY FEET.
4. SEE SHEET 35 FOR ALIGNMENT AND COORDINATE TABLES.
5. CURRENTLY PERMITTED UNDER C.U.P. NO. P20170043 AND C.O.E. NO. MVN 2015-0895-CQ.
1,200'
DATE
COASTAL
ENGINEERING
CONSULTANTS, INC.
PH: (225) 768-1982
8570 ANSELMO LANE
BATON ROUGE, LA 70810
DRAWN BY: STEVE DARTEZ
AA
28+00
AA
3,499,200 E
AA
L
72+00
80+00
84+00
145,400 N
1,200'
OSI-15-VC-27
OSI-15-VC-28
AA
M
88+00
92+00
96+00
100+00
3,492,000 E
104+00
108+00
N
AA
52+00
AA
3,496,800 E
AA
56+00
AA
76+00
AA
3,494,400 E
AA
AA
AA
AA
SSBL-02
AA
AA
DESIGNED BY: MICHAEL T. POFF, P.E.
LICENSE NUMBER: 30048
LOUISIANA COASTAL PROTECTION
AND RESTORATION AUTHORITY
150 TERRACE AVENUE
BATON ROUGE, LA 70802
APPROVED BY: TRAVIS BYLAND, P.E.
TERREBONNE BASIN
SHIP SHOAL BORROW AREA
BARRIER ISLAND AND BEACH
PLAN VIEW
NOURISHMENT
STATE PROJECT NUMBER: TE-143
DATE: APRIL 2018
FEDERAL PROJECT NUMBER:
SHEET 17 OF 36
EXISTING GRADE (2015)
DESIGN DREDGE CUT
100H:1V PIPELINE
SLOPE OFFSET
DESIGN LIMIT OF DISTURBANCE
VC-24
LEGEND:
NOTES:
1. GEOPHYSICAL AND GEOTECHNICAL DATA
FROM OSI, INC., 2015.
2. ELEVATIONS ARE SHOWN IN NAVD88 U.S.
SURVEY FEET.
4. MEAN HIGH WATER = +0.88FT NAVD88, MEAN
LOW WATER = -0.37 FT NAVD88.
VIBRACORE (2015)
SCALE:
H: 1" = 500'
V: 1" = 25'
SOUTH
NORTH
-15
K - K'
-20
-25
VC-26
-20
VC-22
ELEVATION (FT, NAVD88)
-15
-30
-35
-30
-35
-38FT
-40FT
-41FT
-40
-25
-43FT
-40
-45
-45
-50
2500
-50
0
500
1000
1500
2000
DISTANCE FROM BASELINE (FEET)
SOUTH
NORTH
-15
L - L'
-25
-30
-35
-25
-30
-35FT
-37FT
-38FT
-40FT
-40
VC-15
-20
VC-16
-20
VC-17
ELEVATION (FT, NAVD88)
-15
-38FT
-41FT
-35
-40
-45
-45
-50
-50
0
500
1000
1500
2000
2500
3000
3500
DISTANCE FROM BASELINE (FEET)
BY
DESCRIPTION
DATE
COASTAL
ENGINEERING
CONSULTANTS, INC.
PH: (225) 768-1982
8570 ANSELMO LANE
BATON ROUGE, LA 70810
DRAWN BY: STEVE DARTEZ
DESIGNED BY: MICHAEL T. POFF, P.E.
LICENSE NUMBER: 30048
LOUISIANA COASTAL PROTECTION
AND RESTORATION AUTHORITY
150 TERRACE AVENUE
BATON ROUGE, LA 70802
APPROVED BY: TRAVIS BYLAND, P.E.
TERREBONNE BASIN
SHIP SHOAL BORROW AREA
BARRIER ISLAND AND BEACH
TYPICAL SECTIONS
NOURISHMENT
STATE PROJECT NUMBER: TE-143
DATE: APRIL 2018
FEDERAL PROJECT NUMBER:
SHEET 18 OF 36
VC-24
LEGEND:
NOTES:
1. GEOPHYSICAL AND GEOTECHNICAL DATA
FROM OSI, INC., 2015.
2. ELEVATIONS ARE SHOWN IN NAVD88 U.S.
SURVEY FEET.
4. MEAN HIGH WATER = +0.88FT NAVD88, MEAN
LOW WATER = -0.37 FT NAVD88.
EXISTING GRADE (2015)
DESIGN DREDGE CUT
100H:1V PIPELINE
SLOPE OFFSET
DESIGN LIMIT OF DISTURBANCE
VIBRACORE (2015)
SCALE:
H: 1" = 500'
V: 1" = 25'
SOUTH
NORTH
-15
M - M'
-30
-35
VC-9
-25
VC-8
-20
VC-10
-20
VC-11
ELEVATION (FT, NAVD88)
-15
-30
-35FT
-37FT
-38FT
-40FT
-40
-25
-35
-38FT
-41FT
-40
-45
-45
-50
0
500
1000
1500
2000
2500
3000
3500
-50
4500
4000
DISTANCE FROM BASELINE (FEET)
SOUTH
NORTH
-15
-30
-35
VC-6
-25
-20
VC-5
N - N'
VC-7
-20
VC-29
ELEVATION (FT, NAVD88)
-15
-25
-30
-36FT
-35FT
-37FT
-39FT
-38FT
-40FT
-40
-38FT
-41FT
-40
-45
-45
-50
0
-35
-50
500
1000
1500
2000
2500
3000
3500
4000
4500
DISTANCE FROM BASELINE (FEET)
BY
DESCRIPTION
DATE
COASTAL
ENGINEERING
CONSULTANTS, INC.
PH: (225) 768-1982
8570 ANSELMO LANE
BATON ROUGE, LA 70810
DRAWN BY: STEVE DARTEZ
DESIGNED BY: MICHAEL T. POFF, P.E.
LICENSE NUMBER: 30048
LOUISIANA COASTAL PROTECTION
AND RESTORATION AUTHORITY
150 TERRACE AVENUE
BATON ROUGE, LA 70802
APPROVED BY: TRAVIS BYLAND, P.E.
TERREBONNE BASIN
SHIP SHOAL BORROW AREA
BARRIER ISLAND AND BEACH
TYPICAL SECTIONS
NOURISHMENT
STATE PROJECT NUMBER: TE-143
DATE: APRIL 2018
FEDERAL PROJECT NUMBER:
SHEET 19 OF 36
AA
CEC-11-VC-1
Q
AA
AA
AA
AA
AA
AA
AA
PL
AA
PL
AA
AA
AA
AA
AA
PL
CHVC-05-13
SP-06
0
+0
24
PL
AA
PL
0
+0
16
AA
AA
SP-02
AA
PL
CHVC-05-12
AA
AA
AA
AA
AA
AA
AA
AA
AA
AA
P
147,000 N
EXPANSION AREA - A
0
+0
88
AA
3,505,000 E
AA
0
+0
72
0
+0
80
AA
AA
AA
PL
PL
PL
SP-05
0
+0
96
PL
PL
PL
LEGEND
10
DESCRIPTION
00
4+
BY
00
2+
0'
PL
750'
11
PL
1,500'
SPBL-02
1,500'
DATE
DESIGN CUT TOE
DESIGN CUT: -40FT
MAX DISTURBANCE: -43FT
BA-143
BORROW AREA
DESIGN CUT: -42FT
MAX DISTURBANCE -45FT
2011 SURVEY LIMITS
DESIGN CUT: -44FT
MAX DISTURBANCE: -47FT
COASTAL
ENGINEERING
CONSULTANTS, INC.
PH: (225) 768-1982
8570 ANSELMO LANE
BATON ROUGE, LA 70810
DRAWN BY: STEVE DARTEZ
SURVEY
BASELINE
0
+0
64
PL
PL
PL
147,000 N
CAMINADA HEADLAND BEACH AND
DUNE RESTORATION (BA-143)
PERMITTED BORROW AREA
(MVN-2012-02134-WPP, P20121150)
0
+0
56
PL
PL
O
0
+0
48
AA
AA
SP-04
3,515,000 E
PL
AA
AA
AA
0
+0
40
PL
PL
AA
AA
AA
0
+0
32
AA
CEC-12-VC-5
PL
SPBL-01
AA
O'
AA
PL
0
+0
08
AA
PL
AA
AA
PL
0
+0
00
AA
SP-03
PL
152,000 N
AA
AA
AA
SP-01
PL
AA
AA
AA
AA
AA
AA
AA
AA
PL
SP-11
AA
CEC-12-VC-7
AA
SP-10
CEC-12-VC-3
PL
3,515,000 E
AA
AA
AA
R
P'
AA
AA
AA
AA
PL
PL
AA
AA
AA
152,000 N
AA
PL
SP-08
SP-12
PL
AA
PL
Q'
AA
AA
3,505,000 E
R' AA
SP-09
AA
CEC-11-VC-2A
AA
2011
SURVEY
LIMITS
AA
AA
AA
SP-07
AA
PL
EXPANSION AREA - B
DESIGNED BY: MICHAEL T. POFF, P.E.
LICENSE NUMBER: 30048
LOUISIANA COASTAL PROTECTION
AND RESTORATION AUTHORITY
150 TERRACE AVENUE
BATON ROUGE, LA 70802
APPROVED BY: TRAVIS BYLAND, P.E.
NOTES:
1. GEOPHYSICAL AND GEOTECHNICAL DATA FROM
OSI, 2011-12 AND GEOTECHNICAL DATA FROM
CPE, 2005.
2. ELEVATIONS ARE NAVD88, US SURVEY FEET.
3. COORDINATES ARE NAD83, LA STATE PLANE, US
SURVEY FEET.
4. SEE SHEET 35 FOR ALIGNMENT AND COORDINATE
TABLES.
5. CURRENTLY PERMITTED UNDER C.U.P. NO.
P20170043 AND C.O.E. NO. MVN 2015-0895-CQ.
-34
BATHYMETRIC CONTOUR
(OSI 2011)
CONVEYANCE CORRIDORS
AA
PL
ALLOWABLE ANCHOR AREA
PIPELINES (OSI, 2011)
TERREBONNE BASIN
BARRIER ISLAND AND BEACH
NOURISHMENT
SOUTH PELTO BORROW
AREA PLAN VIEW
STATE PROJECT NUMBER: TE-143
DATE: APRIL 2018
FEDERAL PROJECT NUMBER:
SHEET 20 OF 36
LEGEND:
SCALE:
H: 1" = 500'
V: 1" = 25'
DESIGN DREDGE CUT
EXISTING GRADE (2011)
DESIGN LIMIT OF DISTURBANCE
VIBRACORE
(CEC-12-VC-1, OSI 2012)
(CHVC-05-12, CPE 2005)
ELEVATION (FT, NAVD88)
NOTES:
1. GEOPHYSICAL AND GEOTECHNICAL DATA FROM OSI, 2011.
2. ELEVATIONS ARE SHOWN IN NAVD88 U.S. SURVEY FEET.
3. MEAN HIGH WATER = +0.88FT NAVD88, MEAN LOW WATER = -0.37
FT NAVD88.
-15
SOUTHEAST
NORTHWEST
O - O'
-20
-15
-20
-25
-25
-30
-30
CHVC-05-12
-35
-35
-40FT
-43FT
1
(TYP) 3
-40
-45
-50
0
500
-42FT
-45FT
-40
-44FT
-47FT
1000
1500
2000
2500
3000
3500
-45
-50
4500
4000
ELEVATION (FT, NAVD88)
DISTANCE ALONG PROFILE (FEET)
-15
SOUTHEAST
-20
NORTHWEST
P - P'
-20
-25
-25
-30
CEC-12-VC-7
CEC-12-VC-5
CHVC-05-12
-30
-35
-40
-45
-50
0
-15
-35
1
(TYP) 3
-42FT
-45FT
-44FT
-47FT
500
1000
1500
-40FT
-43FT
2000
2500
3000
-40
-45
3500
-50
4500
4000
DISTANCE ALONG PROFILE (FEET)
BY
DESCRIPTION
DATE
COASTAL
ENGINEERING
CONSULTANTS, INC.
PH: (225) 768-1982
8570 ANSELMO LANE
BATON ROUGE, LA 70810
DRAWN BY: STEVE DARTEZ
DESIGNED BY: MICHAEL T. POFF, P.E.
LICENSE NUMBER: 30048
LOUISIANA COASTAL PROTECTION
AND RESTORATION AUTHORITY
150 TERRACE AVENUE
BATON ROUGE, LA 70802
APPROVED BY: TRAVIS BYLAND, P.E.
TERREBONNE BASIN
BARRIER ISLAND AND BEACH
NOURISHMENT
SOUTH PELTO BORROW
AREA TYPICAL SECTIONS
STATE PROJECT NUMBER: TE-143
DATE: APRIL 2018
FEDERAL PROJECT NUMBER:
SHEET 21 OF 36
LEGEND:
SCALE:
H: 1" = 500'
V: 1" = 25'
EXISTING GRADE (2011)
DESIGN DREDGE CUT
VIBRACORE
(CEC-11-VC-1, OSI 2011)
DESIGN LIMIT OF DISTURBANCE
ELEVATION (FT, NAVD88)
NOTES:
1. GEOPHYSICAL AND GEOTECHNICAL DATA FROM OSI, 2011.
2. ELEVATIONS ARE SHOWN IN NAVD88 U.S. SURVEY FEET.
3. MEAN HIGH WATER = +0.88FT NAVD88, MEAN LOW WATER = -0.37
FT NAVD88.
-15
SOUTHWEST
NORTHEAST
Q - Q'
-20
-25
-15
-20
-25
CEC-11-VC-2A
CEC-11-VC-1
-30
-30
1
3 (TYP)
-35
-40
-42FT
-45FT
-44FT
-47FT
-45
-50
0
500
1000
1500
-35
-40FT
-43FT
-40
-45
2000
2500
3000
3500
-50
4500
4000
ELEVATION (FT, NAVD88)
DISTANCE ALONG PROFILE (FEET)
-15
SOUTHEAST
-20
NORTHWEST
R - R'
-25
-20
-25
CEC-11-VC-1
-30
-30
1
3 (TYP)
-35
-40
-35
-40
-44FT
-47FT
-45
-50
0
-15
500
1000
-45
1500
2000
2500
3000
3500
-50
4500
4000
DISTANCE ALONG PROFILE (FEET)
BY
DESCRIPTION
DATE
COASTAL
ENGINEERING
CONSULTANTS, INC.
PH: (225) 768-1982
8570 ANSELMO LANE
BATON ROUGE, LA 70810
DRAWN BY: STEVE DARTEZ
DESIGNED BY: MICHAEL T. POFF, P.E.
LICENSE NUMBER: 30048
LOUISIANA COASTAL PROTECTION
AND RESTORATION AUTHORITY
150 TERRACE AVENUE
BATON ROUGE, LA 70802
APPROVED BY: TRAVIS BYLAND, P.E.
TERREBONNE BASIN
BARRIER ISLAND AND BEACH
NOURISHMENT
SOUTH PELTO BORROW
AREA TYPICAL SECTIONS
STATE PROJECT NUMBER: TE-143
DATE: APRIL 2018
FEDERAL PROJECT NUMBER:
SHEET 22 OF 36
PL
PL
PL
PL
PL
PL
PL
PL
ST09 ST10
ST16
OCS LEASE BOUNDARY
PL
PROBABLE PIPELINE
(OSI, 2011, CMD, 2010, &
BOEM, 2007)
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
TIMBALIER CONVEYANCE
PL
CORRIDOR
8.34 NM
PL
PL
PL
PL
PL
PPLL
PL
PL
PL
PL
PL P
PL L
PL
PL
PPL
L
PL
PL
PL
PL
TERREBONNE BASIN
BARRIER ISLAND AND BEACH
NOURISHMENT
PL
PPL
L
PL
PL
PL
PL
PL
PL
PPL
LPL
PL
PL
PL
PL
PL
PL
PLPL
PLPL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PPL
L
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PPL
L PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PLPL
PLPL
PPL
L
PL
PL
P
PPL L LPL
PLPL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PPL
L
PL
PL
PL
PLPL
PL
PL
PL
PL
PL
PL PPLL
PL
PLPL
PL
PL
PL
APPROVED BY: TRAVIS BYLAND, P.E.
PL
150 TERRACE AVENUE
BATON ROUGE, LA 70802
PL
PL
PL
PL
DESIGNED BY: MICHAEL T. POFF, P.E.
LICENSE NUMBER: 30048
LOUISIANA COASTAL PROTECTION
AND RESTORATION AUTHORITY
PL
PL
PL
PL
PL
NOTES:
1. SEE SHEET 36 FOR ALIGNMENT AND COORDINATE TABLES.
COASTAL
ENGINEERING
CONSULTANTS, INC.
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
3.05 NM
PL
PL
PL
PL PPLLPL
PL
PL
PL
PL
PL
PL
PL
PPPLLL
PL
PL
PL
PL
PL
PL PL
PL
PL
PL PL
TIMBALIER
BAY
PL
PL
PL
PL
L PL
PPL
PL
PL
PL
PL
1.44 NM
DETAIL ON
SHEET 25
DATE
PL
PL
PL
ST32
ST35
PL
PL
10,000'
PL
PL
PL
TIMBALIER PUMP-OUT
PLL
AREA NO. 2
P
PL
PL
PL
PL
PH: (225) 768-1982
8570 ANSELMO LANE
BATON ROUGE, LA 70810
DRAWN BY: STEVE DARTEZ
PL
PL
PL
PL
PL
PL
PPPLLL
DESCRIPTION
PL
PL
PL
ST50
PL
PL
PL
PL
PL
PPPLLL
PL
PLPLL
PL
TIMBALIER PUMP-OUT
AREA NO. 1
PL
PL
PL
PL
PL
ST33
ST34
PL
PL
PL
PL
BY
PL
PL
PLPL
0'
PL PL
PL
PL
PL
PL
PL
PL
PL
5,000'PLPL
PL
PL
PL
PL
L PL
PL
PL
L
PL
PL
PL
PL
PL
PL
P
PLL
PL
PL
PL
PL
PLP
PL
P
ST53
10,000'
PL
PL
PLP
L
PPL
PL
L
PL
PLL
PPL
PLPL
PL
PLP
L
PL
PLPL
P
PLL
TIMBALIER ISLAND
PL
PL
PPLL
ST51
ST52
PL
P
PL
L
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
GULF OF
MEXICO
PL
PL
PL
PL P L
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
L
PL
PL
PL
PL
PPLL
PL
PL
ST11
ST05
SP06
PL
PL
PL
SP15
SP16
PL
PL
DETAILP ON
L
SHEET 24
FEDERAL / STATE
WATER BOUNDARY
PL
PL
PL
CONVEYANCE CORRIDOR
ALIGNMENT
PL
PL
ST03 ST04
SP08 SP07
SP13 SP14
SP18 SP17
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
BORROW AREA LIMITS
PL
PL
PL
PL
PL
PL
PL
P
PL
PL
PL
PL
PL
PL
PL
PL
SOUTH PELTO
BORROW AREAS
PL
PL
PL
PL PL
PUMP-OUT
AREA
LIMITS
PL
L
PL
PL
PL
SHIP SHOAL
BORROW AREA
PL
PL PL
0.78 NM PL
PL
PL
PL
ISLAND NOURISHMENT
AREA LIMITS
PL
PL
PLP
L
PL
PL
PL
PL
PL
PL
LEGEND
PL
PL
SP03
SP08
PL
PL
TIMBALIER PUMP-OUT
AREAS & CONVEYANCE
CORRIDORS OVERVIEW
STATE PROJECT NUMBER: TE-143
DATE: APRIL 2018
FEDERAL PROJECT NUMBER:
SHEET 23 OF 36
PL
PL
PL
PL
PL
PL
PL
PL
PL
AA
PL
PL
AA
AA
AA
AA
PL
SOUTH PELTO
BORROW AREAS
PL
AA
AA
PL
PL
AA
PL
AA
PL
AA
PL
PL
TBCC-03B
AA
AA
PL
AA
AA
AA
PL
PL
PL
PL
AA
PL
AA
AA
TBCC-03A
AA
PL
PL
PL
PL
PL
PL
AA
AA
PL
PL
PL
AA
PL
PL
PL
PL
AA
P
PL
AA
TBCC-02
L
PL
PL
PL
PL
PL
NOTES:
1. ELEVATIONS FROM NOAA NAUTICAL CHART 11357 "TIMBALIER AND
TERREBONNE BAYS", 43rd EDITION, MAY 2014, NOS SURVEYS
1990-2011 RELATIVE TO MEAN LOWER LOW WATER.
2. ALLOWABLE ANCHOR AREA EXTENDS 250 FT BEYOND THE LIMITS
OF THE CONVEYANCE CORRIDORS AND BORROW AREAS.
3. SEE SHEET 36 FOR ALIGNMENT AND COORDINATE TABLES.
PL
PL
EXISTING EL. -34'
PL
PL
PL
AA
500 FT
TIMBALIER CONVEYANCE
CORRIDOR
PL
PL
PL
PL
PL
PL
PL
PL
PL
AA
PL
L
L
SHIPP SHOAL P
PL
BORROW
PL AREA
L
P
PL
TBCC-01
PL
PL
PL
PL
PL
PL
PL
PL
PL
AA
SP14
PL
AA
AA
PL
TBCC-06
PL
EXISTING EL. -29'
AA
PL
AA
PL
PL
AA
PL
PL
AA
AA
PL
SP17
PL
EXISTING EL. -28'
ST04
PL
TBCC-05
ST03
AA
SP07
TBCC-04
SP08
PL
AA
SP13
PL
SP18
PL
AA
EXISTING EL. -29'
AA
AA
PL
AA
AA
PL
AA
PL
AA
PL
AA
PL
ALLOWABLE
ANCHOR AREA
PL
SP16
DATE
SP15
CONTINUED ON SHEET 25
COASTAL
ENGINEERING
CONSULTANTS, INC.
PH: (225) 768-1982
8570 ANSELMO LANE
BATON ROUGE, LA 70810
DRAWN BY: STEVE DARTEZ
DESIGNED BY: MICHAEL T. POFF, P.E.
LICENSE NUMBER: 30048
LOUISIANA COASTAL PROTECTION
AND RESTORATION AUTHORITY
150 TERRACE AVENUE
BATON ROUGE, LA 70802
APPROVED BY: TRAVIS BYLAND, P.E.
AA
DESCRIPTION
5,000'
AA
PL
0'
BY
AA
2,500'
EXISTING EL. -41'
AA
PROBABLE PIPELINE
(CMD, 2010 & BOEM, 2007)
PL
5,000'
PL
AA
PL
PL
TIMBALIER CONVEYANCE
CORRIDOR
AA
PL
TIMBALIER CONVEYANCE
CORRIDOR COORDINATE
PL
EXISTING EL. -37'
AA
OCS LEASE BOUNDARY
PL
AA
PL
CONVEYANCE CORRIDOR
TBCC-01
PL
AA
BORROW AREA LIMITS
ST03
PL
AA
LEGEND
AA
PL
PL
500 FT
SP06
TERREBONNE BASIN
BARRIER ISLAND AND BEACH
NOURISHMENT
TIMBALIER PUMP-OUT
AREAS & CONVEYANCE
CORRIDORS PLAN VIEW
STATE PROJECT NUMBER: TE-143
DATE: APRIL 2018
FEDERAL PROJECT NUMBER:
SHEET 24 OF 36
CONTINUED FROM SHEET 24
PL
PL
PL
PL
PL
AA
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL PL
PL PL
PL
PL
AA
AA
AA
AA
AA
AA
TIMBALIER PUMP-OUT
AREA NO. 2
PL
PL
PL PL
PL
PL
TIMBALIER CONVEYANCE
CORRIDOR
PL
EXISTING EL. -13'
PL
PL
PL
PL
PL
PL
AA
PLPL
PL
PL PL
PL
PL
AA
PL
AA
AA
PL
PL
PL
PL
PL
AA
AA
PL
AA
AA
PL
AA
AA
AA
AA
PL
PL
PLPL
AA
PL
PL
PL
PL
PL
PL
PL
EXISTING
EL. -25'
PL
PL
EXISTING EL. -22'
AA
AA
AA
PL
TBPO-07
AA
PL
EXISTING
EL. -30'
AA
PL
TBCC-11PL
PL
AA
AA
AA
PL
PL
500 FT
PL
AA
PL
EXISTING EL. -10'
PL
PL
AA
AA
PL
AA
AA
AA
PL
AA
PL
AA
PL
PL
PL
PL
PL
COASTAL
ENGINEERING
CONSULTANTS, INC.
DESIGNED BY: MICHAEL T. POFF, P.E.
LICENSE NUMBER: 30048
PL
PL
PL
PL
PL
NOTES:
1. ELEVATIONS FROM NOAA NAUTICAL CHART 11357 "TIMBALIER AND
TERREBONNE BAYS", 43rd EDITION, MAY 2014, NOS SURVEYS
1990-2011 RELATIVE TO MEAN LOWER LOW WATER.
2. ALLOWABLE ANCHOR AREA EXTENDS 250 FT BEYOND THE LIMITS
OF THE CONVEYANCE CORRIDORS AND PUMP-OUT AREAS.
3. SEE SHEET 36 FOR ALIGNMENT AND COORDINATE TABLES.
DATE
PL
TBPO-08
2000 FT
PH: (225) 768-1982
8570 ANSELMO LANE
BATON ROUGE, LA 70810
DRAWN BY: STEVE DARTEZ
PL
PL
DESCRIPTION
5,000'
PL
BY
PL
0'
PL
2,500'
PL
5,000'
PL
PL
ALLOWABLE ANCHOR AREA
AA
AA
TBCC-09
PL
PROBABLE PIPELINE
(CMD, 2010 & BOEM, 2007)
PL
AA
ST17
ST32
PL
TBCC-01
TBPO-06
TBCC-10
AA
2000 FT
PL
EXISTING EL. -16'
AA
PL
500 FT
TIMBALIER PUMP-OUT
AREA COORDINATE
TIMBALIER CONVEYANCE
CORRIDOR
COORDINATE
PL
TBPO-01
PL
AA
PL
EXISTING EL. -36'
PL
PL
PL
EXISTING EL. -32'
TBPO-05
OCS LEASE BOUNDARY
ST16
PL
PL
TIMBALIER CONVEYANCE
CORRIDOR
AA
PL
TBCC-08
CONVEYANCE CORRIDOR
PL
PL
TBPO-03
PUMP-OUT
AREA LIMITS
PL
PL
PL
ST11
PL
AA
TBPO-04
PL
GULF OF MEXICO
EXISTING EL. -39'
AA
PL
ISLAND NOURISHMENT
PL
AREA LIMITS
L
PL
AA
PL
PL
PL
TBPO-02
TBPO-01
TIMBALIER PUMP-OUT
AREA NO. 1
PLP
TIMBALIER ISLAND
2000 FT
TBCC-07
2000 FT
PL
ST16
AA
PL
PL
PL
PL
ST33
AA
ST33
PL
PL
PL
PL
PL
PL
PL
PPL
L
AA
PL
PL
LEGEND
PL
PL
PL
PL
PL
EXISTING EL. -40'
AA
PL
PL
PL
AA
PL
PL
PL
PL
PL
PL
AA
PL
PL
PL
PL
PLPL
FEDERAL / STATE
WATER BOUNDARY
PL
PL
PL
PL
PL
PL
TIMBALIER CONVEYANCE
PL
PL
CORRIDOR
PL
PL
PL
PL
PL
EXISTING EL. -40'
PL
PL
PL
PL
PL
PL
PL
PL
AA
PL
AA
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
500 FT
PL
PL
PL PL
PL
PL
AA
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
AA
AA
AA
PL
PL
PL
PL
PL
PL
PL
AA
EXISTING EL. -41'
SP05
SP06
AA
SP15
AA
P
PL
PL
PL
LOUISIANA COASTAL PROTECTION
AND RESTORATION AUTHORITY
150 TERRACE AVENUE
BATON ROUGE, LA 70802
APPROVED BY: TRAVIS BYLAND, P.E.
TERREBONNE BASIN
BARRIER ISLAND AND BEACH
NOURISHMENT
PL
TIMBALIER PUMP-OUT
AREAS & CONVEYANCE
CORRIDORS PLAN VIEW
STATE PROJECT NUMBER: TE-143
DATE: APRIL 2018
FEDERAL PROJECT NUMBER:
SHEET 25 OF 36
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PLPPL
PL L
DESIGNED BY: MICHAEL T. POFF, P.E.
LICENSE NUMBER: 30048
PPLL
PL
LOUISIANA COASTAL PROTECTION
AND RESTORATION AUTHORITY
150 TERRACE AVENUE
BATON ROUGE, LA 70802
APPROVED BY: TRAVIS BYLAND, P.E.
PL
PL
LL
PP
PL
PL
LEASE
BOUNDARY
PL
PL
TERREBONNE BASIN
BARRIER ISLAND AND BEACH
NOURISHMENT
PL
PL
PL
NOTES:
1. SEE SHEET 36 FOR ALIGNMENT AND COORDINATE TABLES.
COASTAL
ENGINEERING
CONSULTANTS, INC.
PL
POCS
L
PP
LL
PL
PL
L
PPL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PLPL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL P L
PL
PL
PL
PL
PL
PLPL
PL
PL
ST16
PL
8,000'
CONVEYANCE CORRIDOR
ALIGNMENT
PL
PL
PL
PL
PL
PL
PL
BORROW AREA LIMITS
PL
GULF OF
MEXICO
PL
L
PL
PL
PL
PL
PL
PL
LL
PP
PL
PUMP-OUT
AREA LIMITSPL
P
PL
PL
PL
PL
PL
PL
PL
PL
PL
P PL
PL L
PL
L
PL P
DETAIL ON
SHEET 27
PL
PPLL
PL PL
PL
PL
PL
PL
PL PL
PL
PL
PL PL
PL
ISLAND NOURISHMENT
AREA LIMITS
PL
PL
PL
P
PL L
LEGEND
L
PL P
PL
PL
PL PL
PL
TRINITY-EAST
CONVEYANCE
CORRIDOR
PL
PL
DATE
PL
PL L
P PL
DETAIL ON
SHEET 28
PL
PL
PL
PL
SP02 SP03
DESCRIPTION
LAKE PELTO
PL
PL
PL
PH: (225) 768-1982
8570 ANSELMO LANE
BATON ROUGE, LA 70810
DRAWN BY: STEVE DARTEZ
PL
PL
PL
SP09 SP08
PL
PL
SP13
0'
PL
PL
TRINITY-EAST
ISLAND
PL
PL
PL
PL
BY
PL
PL L
P
1.25 NM
PL
PL
PL
PL
4.19 NM
PL
PL
SP18
4,000'
PLP
L
PL
PL
PL
PL
TRINITY-EAST
PUMP-OUT
AREA NO. 2
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
L
PLP
PL
PL
3.47 NM
PL
PL
PL
PL
PL
PL
PL
PLP
L
PL
PL
PL
PL
PL
PL
PL
SP12
SP19
PL
PL
PL
PL
PL
FEDERAL / STATE
WATER BOUNDARY
PL
SHIP SHOAL
PL
BORROW
AREA
PL
SP01
PLL
P
PL
PL
PL
P
PL
PL
PL
TRINITY-EAST
PUMP-OUT AREA NO. 1
PL
PL
P
L
PL
PL
PL
PL
PL
PL
PL
8,000'
SP10
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
L
PPL
PL PLL
P
PL
PL
PL
PL
PL
PL
PL
PL
SS67
PL
PL
PL
PL
PL
PL
SS68
PL
PL
SS91 SP11
SS92 SP20
PL
PL
PL
PL
PL
PL
PPLL
PL
L
P
PL
PL
PL
PL
PL
PL
PL
PPL
L
PL
PL
PL
PL
PROBABLE PIPELINE PLPL
(CMD, 2010 & BOEM, 2007)
TRINITY-EAST PUMP-OUT
AREAS & CONVEYANCE
CORRIDORS OVERVIEW
STATE PROJECT NUMBER: TE-143
DATE: APRIL 2018
FEDERAL PROJECT NUMBER:
SHEET 26 OF 36
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
AA
PL
PL
PL
PL
PL
PL
PL PL
PL
PL
PL
TEPO-04
PL
AA
AA
PL
PL
PL
AA
PL
PL
AA
PL
PL
PL
PL
PL
AA
AA
AA
AA
PL
PL
PL
PL
CONTINUED ON SHEET 28
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
AA
PL
AA
PL
AA
PL
AA
AA
AA
AA
AA
AA
AA
AA
AA
PL
AA
AA
PL
PL
PL
PL
PL
PL
PUMP-OUT AREA LIMITS
CONVEYANCE CORRIDOR
PL
PL
PL
PL
SP09
PL
PL
TEPO-01
PL
PL
PL
PL
PL
AA
AA
AA
AA
AA
NOTES:
1. ELEVATIONS FROM NOAA NAUTICAL CHART 11357 "TIMBALIER AND
TERREBONNE BAYS", 43rd EDITION, MAY 2014, NOS SURVEYS 1990-2011
PL
RELATIVE TO MEAN LOWER LOW WATER.
PL
2. ALLOWABLE ANCHOR AREA EXTENDS 250 FT BEYOND THE LIMITS OF THE
CONVEYANCE CORRIDORS, PUMP-OUT AREAS, AND BORROW AREA.
3. SEE SHEET 36 FOR ALIGNMENT AND COORDINATE TABLES.
TECC-01
PL
DATE
COASTAL
ENGINEERING
CONSULTANTS, INC.
PH: (225) 768-1982
8570 ANSELMO LANE
BATON ROUGE, LA 70810
DESIGNED BY: MICHAEL T. POFF, P.E.
LICENSE NUMBER: 30048
LOUISIANA COASTAL PROTECTION
AND RESTORATION AUTHORITY
150 TERRACE AVENUE
BATON ROUGE, LA 70802
APPROVED BY: TRAVIS BYLAND, P.E.
OCS LEASE BOUNDARY
TRINITY-EAST PUMP-OUT
AREA COORDINATE
TRINITY-EAST CONVEYANCE
CORRIDOR COORDINATE
PL
PROBABLE PIPELINE
(CMD, 2010 & TE-40, 2005 )
AA
ALLOWABLE ANCHOR AREA
PL
3,000'
PL
PL
DESCRIPTION
PL
PL
PL
PL
AA
PL
PL
PL
PL
PL
LEGEND
BORROW AREA LIMITS
PL
PL
PL
PL
PL
AA
PL
PL
PL
SP08
AA
AA
PL
PL
PL
PL
SP13
PL
SP18
PLPL
PL
PL
PL
SP09
PL
PL
PL
PL
SP12
AA
SP19
PL
DRAWN BY: STEVE DARTEZ
2000 FT
PL
AA
EXISTING EL. -27'
PL
BY
AA
TRINITY-EAST
CONVEYANCE CORRIDOR
PL
PL
0'
TECC-02
PL
500 FT
PL
PL
1,500'
AA
AA
AA
AA
AA
TEPO-03
PL
PL
TECC-03
TRINITY-EAST
PUMP-OUT AREA NO. 1
PL
PL
AA
AA
AA
AA
PL
AA
AA
PL
PL
AA
PL
AA
AA
PL
AA
PL
PL
PL
PL
PL
3,000'
AA
AA
TECC-01
PL
PL
PL
PL
L
PLP
PL
AA
AA
AA
AA
AA
AA
AA
EXISTING EL. -24'
AA
AA
AA
P
PL
AA
AA
AA
PL
AA
PL
PL
PL
PL
PL
AA
AA
AA
2000 FT
EXISTING EL. -36'
SHIP SHOAL
BORROW LAREA
PL
500 FT
AA
PL
PL
PL
TEPO-01
AA
PL
PL
PL
TEPO-02
PL
PL
PL
PL
PL
PL
PL
L
PPL
AA
PPL
L
PL
PL
PL
PL
EXISTING EL. -33'
EXISTING EL. -34'
PL
PL
PL
PL
PL
PL
PL
PL
PL
A
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL L
P
L
L
PL
PL
PL
PL
TERREBONNE BASIN
BARRIER ISLAND AND BEACH
NOURISHMENT
TRINITY-EAST PUMP-OUT
AREAS & CONVEYANCE
CORRIDORS PLAN VIEW
STATE PROJECT NUMBER: TE-143
DATE: APRIL 2018
FEDERAL PROJECT NUMBER:
SHEET 27 OF 36
PL
PL
PL
PL
PL
PL
PL
FEDERAL / STATE
WATER BOUNDARY
L
TECC-06
PL
PL
PL
PL
AA
PL
AA
AA
PL
PL
PL
AA
AA
PL
500 FT
TRINITY-EAST
CONVEYANCE CORRIDOR
AA
AA
PL
PL
LEGEND
AA
AA
ISLAND NOURISHMENT
AREA LIMITS
AA
AA
PL
2000 FT
PUMP-OUT AREA
LIMITS
PL
AA
AA
GULF OF MEXICO
CONVEYANCE CORRIDOR
AA
AA
AA
AA
AA
PL
PL
TECC-05
SP01
TEPO-07
AA
PL
AA
TEPO-01
PL
TEPO-08
NOTES:
1. ELEVATIONS FROM NOAA NAUTICAL CHART 11357 "TIMBALIER AND
TERREBONNE BAYS", 43rd EDITION, MAY 2014, NOS SURVEYS
1990-2011 RELATIVE TO MEAN LOWER LOW WATER.
2. ALLOWABLE ANCHOR AREA EXTENDS 250 FT BEYOND THE LIMITS
OF THE CONVEYANCE CORRIDORS AND PUMP-OUT AREAS.
3. SEE SHEET 36 FOR ALIGNMENT AND COORDINATE TABLES.
TECC-01
PL
2000 FT
PL
500 FT
PL
AA
AA
AA
AA
AA
AA
AA
AA
AA
AA
AA
AA
AA
PL
PL
AA
SP02
SP09
AA
AA
SP01
SP10
AA
TECC-04
AA
AA
TEPO-06
PL
PL
AA
AA
TEPO-05
AA
AA
AA
AA
AA
AA
AA
EXISTING EL. -31'
AA
AA
EXISTING EL. -28'
PL
AA
AA
EXISTING EL. -27'
PL
AA
AA
EXISTING EL. -22'
AA
PL
AA
EXISTING EL. -14'
EXISTING EL. -21'
TRINITY-EAST
PUMP-OUT AREA NO. 2
AA
PL
CONTINUED FROM SHEET 27
AA
3,000'
1,500'
0'
BY
DESCRIPTION
3,000'
DATE
COASTAL
ENGINEERING
CONSULTANTS, INC.
PH: (225) 768-1982
8570 ANSELMO LANE
BATON ROUGE, LA 70810
DRAWN BY: STEVE DARTEZ
PL
PL
PL
AA
EXISTING EL. -15'
DESIGNED BY: MICHAEL T. POFF, P.E.
LICENSE NUMBER: 30048
LOUISIANA COASTAL PROTECTION
AND RESTORATION AUTHORITY
150 TERRACE AVENUE
BATON ROUGE, LA 70802
APPROVED BY: TRAVIS BYLAND, P.E.
OCS LEASE BOUNDARY
TRINITY-EAST PUMP-OUT
AREA COORDINATE
TRINITY-EAST CONVEYANCE
CORRIDOR COORDINATE
PL
PROBABLE PIPELINE
(CMD, 2010 & TE-40, 2005 )
AA
ALLOWABLE ANCHOR AREA
TERREBONNE BASIN
BARRIER ISLAND AND BEACH
NOURISHMENT
TRINITY-EAST PUMP-OUT
AREAS & CONVEYANCE
CORRIDORS PLAN VIEW
STATE PROJECT NUMBER: TE-143
DATE: APRIL 2018
FEDERAL PROJECT NUMBER:
SHEET 28 OF 36
ARTICULATED CONCRETE MAT
(NOTE 2 & 5)
SEDIMENT PIPELINE
(NOTE 1)
EXISTING GRADE
(NOTE 1)
CONSTRUCTION CONTRACTOR:
OIL/GAS PIPELINE
OPTIONAL TEMPORARY ARTICULATED
CONCRETE MAT PROTECTION CROSSING
PHONE NUMBER:
PROJECT NAME:
PERMIT NUMBER:
NOT TO SCALE
ARTICULATED
CONCRETE MAT TAG
FLOTATION DEVICES
(NOTE 3)
(NOTE 5)
SEA LEVEL
SEDIMENT PIPELINE
(NOTE 1)
(NOTE 1)
(NOTE 4)
EXISTING GRADE
OIL/GAS PIPELINE
OPTIONAL TEMPORARY FLOTATION CROSSING
NOT TO SCALE
NOTES:
1. MEANS AND METHODS OF SEDIMENT PIPELINE CROSSING OF AN OIL/GAS PIPELINE SHALL BE COORDINATED BY THE CONSTRUCTION CONTRACTOR WITH THE OIL/GAS PIPELINE OPERATOR.
2. ARTICULATED CONCRETE MAT CONSTRUCTION AND COVERAGE AREA SHALL BE COORDINATED BY THE CONSTRUCTION CONTRACTOR WITH THE OIL/GAS PIPELINE OPERATOR
3. FLOTATION DEVICE CONSTRUCTION AND PLACEMENT SHALL BE DETERMINED BY INDUSTRY STANDARDS FOR SEDIMENT PIPELINE SUPPORT AND CONSTRUCTION CONTRACTOR STANDARD EQUIPMENT.
4. ANGLE OF SEDIMENT PIPELINE DEPARTURE FROM EXISTING GRADE SHALL BE DETERMINED BY INDUSTRY STANDARDS FOR SEDIMENT PIPELINE SUPPORT AND CONSTRUCTION CONTRACTOR EQUIPMENT.
5. INDIVIDUAL MAT SEGMENTS SHALL BE IDENTIFIED WITH THE ATTACHMENT OF A 2 INCH X 4 INCH TAG. TAGS SHALL BE MADE OF A NON-CORROSIVE MATERIAL AND ATTACHED IN A MANNER AS TO PREVENT GALVANIC CORROSION
WITH THE LONGITUDINAL CABLES OF THE MATS. THE TAGS SHALL BE STAMPED OR ENGRAVED IN ACCORDANCE WITH THE ARTICULATED CONCRETE MAT TAG DETAIL ABOVE AND THE CONTRACT SPECIFICATIONS.
BY
DESCRIPTION
DATE
COASTAL
ENGINEERING
CONSULTANTS, INC.
PH: (225) 768-1982
8570 ANSELMO LANE
BATON ROUGE, LA 70810
DRAWN BY: STEVE DARTEZ
DESIGNED BY: MICHAEL T. POFF, P.E.
LICENSE NUMBER: 30048
LOUISIANA COASTAL PROTECTION
AND RESTORATION AUTHORITY
150 TERRACE AVENUE
BATON ROUGE, LA 70802
APPROVED BY: TRAVIS BYLAND, P.E.
TERREBONNE BASIN
BARRIER ISLAND AND BEACH
NOURISHMENT
OPTIONAL SEDIMENT
PIPELINE CROSSING
TYPICAL DETAILS
STATE PROJECT NUMBER: TE-143
DATE: APRIL 2018
FEDERAL PROJECT NUMBER:
SHEET 29 OF 36
3.0' SEE NOTE 1
3.0' SEE NOTE 1
FENCING POST
(TYPICAL)
SAND FENCING
(TYPICAL)
30'
30'
450'
NOTES:
1. THE DISTANCE BETWEEN FENCES SHALL BE INCREASED FROM 3.0' TO
8.0' AT EVERY FIFTH GAP TO ALLOW ALL-TERRAIN VEHICLE ACCESS.
FENCING GAPPING DIMENSIONS
NOT TO SCALE
4' WOOD SLATS
3/8"x1-1/2"
MINIMUM 13 GAUGE STEEL
GALVANIZED WIRE STRANDS
50'
DUNE CREST
SAND
FENCING
25
BEACH AND DUNE FILL
1
25
1
100'
FINAL GRADE
MARSH FILL
8'x4"x4" OR 8'x4"x3" DIMENSIONED POSTS UNTREATED #2 GRADE LUMBER
FENCING SECTION TYPICAL
NOT TO SCALE
FENCING DETAIL
NOT TO SCALE
BY
DESCRIPTION
DATE
COASTAL
ENGINEERING
CONSULTANTS, INC.
PH: (225) 768-1982
8570 ANSELMO LANE
BATON ROUGE, LA 70810
DRAWN BY: STEVE DARTEZ
DESIGNED BY: MICHAEL T. POFF, P.E.
LICENSE NUMBER: 30048
LOUISIANA COASTAL PROTECTION
AND RESTORATION AUTHORITY
150 TERRACE AVENUE
BATON ROUGE, LA 70802
APPROVED BY: TRAVIS BYLAND, P.E.
TERREBONNE BASIN
BARRIER ISLAND AND BEACH
NOURISHMENT
SAND FENCING DETAILS
STATE PROJECT NUMBER: TE-143
DATE: APRIL 2018
FEDERAL PROJECT NUMBER:
SHEET 30 OF 36
LEGEND
BEACH/DUNE FILL PLANTING
(BITTER PANICUM)
MARSH FILL PLANTING
(SMOOTH CORDGRASS)
TIMBALIER
BAY
NOTES:
1. BITTER PANICUM PLANTS SHALL BE PLANTED ON
SEVEN (7) FOOT CENTERS WITH ROWS TEN (10)
FEET APART.
2. SMOOTH CORDGRASS PLANTS SHALL BE PLANTED
ON THREE (3) FOOT CENTERS WITH ROWS THREE
(3) FEET APART.
3. SPECIES OF PLANTS ARE SUBJECT TO CHANGE
DUE TO SITE CONDITIONS AND / OR CONSTRUCTION
VARIABLES.
TIMBALIER
ISLAND
GULF
OF
MEXICO
3,000'
1,500'
0'
3,000'
NORMAL
GROUND
NORMAL
GROUND
TOP OF ROOT MEDIA TO
BE PLANTED 1" BELOW
NORMAL GROUND
BASE OF PLANT 2"-4"
BELOW NORMAL GROUND
FERTILIZER TABLET
TO BE PLACED WITHIN
2"-4" OF ROOTBALL EDGE,
3" BELOW NORMAL
GROUND AS SPECIFIED
BY
DESCRIPTION
SMOOTH CORDGRASS
PLUG
BITTER PANICUM
4" CONTAINER
DATE
COASTAL
ENGINEERING
CONSULTANTS, INC.
PH: (225) 768-1982
8570 ANSELMO LANE
BATON ROUGE, LA 70810
DRAWN BY: STEVE DARTEZ
DESIGNED BY: MICHAEL T. POFF, P.E.
LICENSE NUMBER: 30048
LOUISIANA COASTAL PROTECTION
AND RESTORATION AUTHORITY
150 TERRACE AVENUE
BATON ROUGE, LA 70802
APPROVED BY: TRAVIS BYLAND, P.E.
TERREBONNE BASIN
BARRIER ISLAND AND BEACH
NOURISHMENT
TIMBALIER ISLAND
VEGETATIVE PLANTING
DETAILS
STATE PROJECT NUMBER: TE-143
DATE: APRIL 2018
FEDERAL PROJECT NUMBER:
SHEET 21 OF 36
LEGEND
BEACH/DUNE FILL PLANTING
(BITTER PANICUM)
LAKE
PELTO
NOTES:
1. BITTER PANICUM PLANTS SHALL BE PLANTED ON
SEVEN (7) FOOT CENTERS WITH ROWS TEN (10)
FEET APART.
2. SPECIES OF PLANTS ARE SUBJECT TO CHANGE
DUE TO SITE CONDITIONS AND / OR CONSTRUCTION
VARIABLES.
TRINITY-EAST
ISLAND
GULF
OF
MEXICO
3,000'
1,500'
3,000'
0'
NORMAL
GROUND
BASE OF PLANT 2"-4"
BELOW NORMAL GROUND
FERTILIZER TABLET
TO BE PLACED WITHIN
2"-4" OF ROOTBALL EDGE,
3" BELOW NORMAL
GROUND AS SPECIFIED
BY
DESCRIPTION
DATE
COASTAL
ENGINEERING
CONSULTANTS, INC.
PH: (225) 768-1982
8570 ANSELMO LANE
BATON ROUGE, LA 70810
DRAWN BY: STEVE DARTEZ
DESIGNED BY: MICHAEL T. POFF, P.E.
LICENSE NUMBER: 30048
BITTER PANICUM
4" CONTAINER
LOUISIANA COASTAL PROTECTION
AND RESTORATION AUTHORITY
150 TERRACE AVENUE
BATON ROUGE, LA 70802
APPROVED BY: TRAVIS BYLAND, P.E.
TERREBONNE BASIN
BARRIER ISLAND AND BEACH
NOURISHMENT
TRINITY-EAST ISLAND
VEGETATIVE PLANTING
DETAILS
STATE PROJECT NUMBER: TE-143
DATE: APRIL 2018
FEDERAL PROJECT NUMBER:
SHEET 32 OF 36
BY
DESCRIPTION
DATE
COASTAL
ENGINEERING
CONSULTANTS, INC.
PH: (225) 768-1982
8570 ANSELMO LANE
BATON ROUGE, LA 70810
DRAWN BY: STEVE DARTEZ
DESIGNED BY: MICHAEL T. POFF, P.E.
LICENSE NUMBER: 30048
LOUISIANA COASTAL PROTECTION
AND RESTORATION AUTHORITY
150 TERRACE AVENUE
BATON ROUGE, LA 70802
APPROVED BY: TRAVIS BYLAND, P.E.
TERREBONNE BASIN
BARRIER ISLAND AND BEACH
NOURISHMENT
STATE PROJECT NUMBER: TE-143
FEDERAL PROJECT NUMBER:
ALIGNMENT AND
COORDINATE TABLES
DATE: APRIL 2018
SHEET 33 OF 36
BY
DESCRIPTION
DATE
COASTAL
ENGINEERING
CONSULTANTS, INC.
PH: (225) 768-1982
8570 ANSELMO LANE
BATON ROUGE, LA 70810
DRAWN BY: STEVE DARTEZ
DESIGNED BY: MICHAEL T. POFF, P.E.
LICENSE NUMBER: 30048
LOUISIANA COASTAL PROTECTION
AND RESTORATION AUTHORITY
150 TERRACE AVENUE
BATON ROUGE, LA 70802
APPROVED BY: TRAVIS BYLAND, P.E.
TERREBONNE BASIN
BARRIER ISLAND AND BEACH
NOURISHMENT
STATE PROJECT NUMBER: TE-143
FEDERAL PROJECT NUMBER:
ALIGNMENT AND
COORDINATE TABLES
DATE: APRIL 2018
SHEET 34 OF 36
BY
DESCRIPTION
DATE
COASTAL
ENGINEERING
CONSULTANTS, INC.
PH: (225) 768-1982
8570 ANSELMO LANE
BATON ROUGE, LA 70810
DRAWN BY: STEVE DARTEZ
DESIGNED BY: MICHAEL T. POFF, P.E.
LICENSE NUMBER: 30048
LOUISIANA COASTAL PROTECTION
AND RESTORATION AUTHORITY
150 TERRACE AVENUE
BATON ROUGE, LA 70802
APPROVED BY: TRAVIS BYLAND, P.E.
TERREBONNE BASIN
BARRIER ISLAND AND BEACH
NOURISHMENT
STATE PROJECT NUMBER: TE-143
FEDERAL PROJECT NUMBER:
ALIGNMENT AND
COORDINATE TABLES
DATE: APRIL 2018
SHEET 35 OF 36
BY
DESCRIPTION
DATE
COASTAL
ENGINEERING
CONSULTANTS, INC.
PH: (225) 768-1982
8570 ANSELMO LANE
BATON ROUGE, LA 70810
DRAWN BY: STEVE DARTEZ
DESIGNED BY: MICHAEL T. POFF, P.E.
LICENSE NUMBER: 30048
LOUISIANA COASTAL PROTECTION
AND RESTORATION AUTHORITY
150 TERRACE AVENUE
BATON ROUGE, LA 70802
APPROVED BY: TRAVIS BYLAND, P.E.
TERREBONNE BASIN
BARRIER ISLAND AND BEACH
NOURISHMENT
STATE PROJECT NUMBER: TE-143
FEDERAL PROJECT NUMBER:
ALIGNMENT AND
COORDINATE TABLES
DATE: APRIL 2018