Proposed Discharge of Fill for Road Construction (Robert C. Jackson Drive Extension) Maryville, Blount County, Tennessee
Public Notice 18-22
Nashville District
Application No. LRN-2018-00197
Date:May 23, 2018; Expires: June 23, 2018
Please address all comments to:
Nashville District Corps of Engineers
Eastern Regulatory Field Office (Attn: Cara Beverly)
501 Adesa Parkway, Suite 250
Lenoir City, Tennessee 37771
SUBJECT: Proposed Discharge of Fill for Road Construction (Robert C. Jackson Drive Extension) Maryville, Blount County, Tennessee
TO ALL CONCERNED: The work described below has been submitted for a Department of the Army Permit (DA) pursuant to Section 404 of the Clean Water Act (CWA). Before a permit can be issued, certification must be provided by the Tennessee Department of Environment and Conservation (TDEC)
Division of Water Resources pursuant to Section 401(1) (1) of the CWA, that applicable state water quality standards will not be violated by the work.
APPLICANT: City of Maryville
Attn: Mr. Dale Jayne
400 West Broadway Avenue
Maryville, TN 37801
LOCATION: The proposed project is located between Morganton Road and US Highway 321. The proposed impacts occur in unnamed tributaries and adjacent wetlands of Laurel Bank Branch, Tributary to Pistol Creek Mile 3.0, Little River Mile 9.3L, Maryville, Blount County, Tennessee. The project is located within the Pistol Creek Watershed HUC-12 060102010108.
The project site can be found on the Binfield, Tennessee 7.5 Minute quadrangle map. See Attachment 1.
DESCRIPTION: The applicant proposes to construct a roadway extension of Robert C. Jackson Drive in Maryville. The proposed 1.1 mile road will be constructed in an area connecting Morganton Road and West Lamar Alexander Parkway (US321). The proposed roadway project involves stream and wetland impacts as indicated in Table 1 below.
Feature
Latitude
Longitude
Impact
S1-Laurel Bank Branch-Perennial
35.74660
-84.01662
No Impacts; Span Arch Culvert
S2-Unnamed Tributary of Laurel Bank Branch-Perennial
35.74249
-84.01607
183 linear feet of 54-60-inch reinforced concrete piping with riprap outlet protection
S3-Unnamed Tributary of Laurel Bank Branch- Perennial
35.74103
-84.01525
150 linear feet of 30-inch reinforced concrete piping with riprap outlet protection
W1- Forested
35.74688
-84.01687
Discharge of Fill in 1.7 acres
W2- Forested
35.74608
-84.01674
Discharge of Fill in 1.4 acres
W3-Emergent
35.74134
-84.01534
Discharge of Fill in 0.04 acres
Plans and location maps of the proposed project are provided in this notice. If you wish to view
additional plans, please contact this office or visit our web site at: http://www.lrn.usace.army.mil/Media/PublicNotices.aspx
AVOIDANCE AND MINIMIZATION OF IMPACTS TO WATERS OF THE U.S.:
Impacts to waters of the U.S. (WOUS) were avoided as impacts to Laurel Bank Branch were eliminated during the design phase by use of span structure for the stream crossing.
Additionally, all impacts have been minimized to the maximum extent possible for road construction.
COMPENSATORY MITIGATION: The applicant has proposed to mitigate for impacts to 333 linear feet of stream channel with restoration of 1,100 linear feet along the left stream bank of Laurel Bank Branch and purchase of 200 stream in-lieu fee credits from Tennessee Stream Mitigation Program. Additionally, the applicant proposes to mitigate for impacts to 2.8 wetland acres with the preservation of 28 wetland acres and the enhancement of 1.6 wetland acres.
PUBLIC INTEREST REVIEW/CUMULATIVE EFFECTS: The decision whether to issue a permit will be based on an evaluation of the probable impacts including cumulative impacts of the activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit which reasonably may be expected to accrue from the work must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the work will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, cultural values, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shore erosion and accretion,
recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership, and, in general, the needs and welfare of the people. In addition, the evaluation of the impact of the activity on the public interest will include application of the guidelines promulgated by the Administrator, Environmental Protection Agency, under authority of
Section 404(b)(1) of the CWA(40 CFR Part 230).
SOLICITATION OF COMMENTS: The USACE is soliciting comments from the public; federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by USACE to determine whether to issue, modify, condition, or deny a permit for
this proposal. To make this decision, comments are used to assess impacts on endangered
species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. An Environmental Assessment will be prepared prior to a final decision concerning issuance or denial of the requested DA permit.
HISTORIC AND CULTURAL RESOURCES: A Phase I Survey was provided and is currently being reviewed. Therefore, an effects determination has not been made. This Public Notice also serves to initiate public involvement requirements of Section 106 of the National Historic Preservation Act of 1996, as amended. Copies of this notice are being sent to the office of the SHPO.
ENDANGERED/THREATENEND SPECIES REVIEW (Per Section 7 of the Endangered Species Act): Based on information provided by the consultant, and a review of the United States Fish and Wildlife Service (USFWS) website, http://ecos.fws.gov/ecos/indexPublic.do, and the Natural Heritage Program website,
http://environment- online.state.tn.us:8080/pls/enf_reports/f?p=9014:3::::::, the following federally-listed species are known to or believed to occur in project area.
Species Nomenclature
Federal Status
Clams
Finerayed pigtoe (Fusconaia cuneolus)
Endangered
Oyster mussel (Epioblasma capsaeformis)
Endangered
Fishes
Snail darter (Percina tanasi)
Threatened
Duskytail darter (Etheostoma percnurum)
Endangered
Flowering Plants
Virginia spiraea (Spiraea virginiana)
Threatened
Spreading avens (Geum radiatum)
Endangered
Mammals
Indiana bat (Myotis sodalis)
Endangered
Gray bat (Myotis grisescens)
Endangered
Northern Long-Eared Bat (Myotis septentrionalis)
Threatened
A copy of the notice is being furnished to the United States Fish and Wildlife Service (USFWS) for their review. This public notice serves as coordination with the USFWS pursuant to Section 7(c) of the Endangered Species Act of 1972 (as amended). Per this notification, we request comments from the USFWS concerning potential impacts to threatened and/or endangered species. After receipt of comments, the USACE will evaluate the potential effects on proposed and/or listed species and their designated critical habitat and initiate consultation with USFWS, if required
OTHER APPROVALS: In addition to the DA permit, other federal, state, and/or local approvals may be required for the proposed work, including:
a. Water Quality Certification from TDEC is required pursuant Section 401 (a)(1) of the Clean Water Act.
PUBLIC HEARING REQUESTS: Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application.
Requests for public hearings shall state, with particularity, the reasons for holding a public hearing.
COMMENT PERIOD: Written statements received in this office on or before June 23, 2018, will become a part of the record and will be considered in the determination. Any response to this notice should reference LRN-2018-00197 and be directed to the Regulatory Branch, Attention: Cara Beverly,
at the above address or email at cara.c.beverly@usace.army.mil
Sincerely,
/s/
Casey Ehorn
Chief, East Branch