LETTER OF PERMISSION: The Village of Pleasant Prairie is seeking to prepare the project area for future entities to develop a 460 acre business park. The proposed project would provide the public infrastructure for a business park including roadways, utilities, and stormwater conveyance features.
PROJECT DESCRIPTION AND PURPOSE: The Village of Pleasant Prairie is seeking to prepare the project area for future entities to develop a 460 acre business park. The proposed project would provide the public infrastructure for a business park including roadways, utilities, and stormwater conveyance features.
Information for File # MVP-2018-00152-KBH
Applicant: Village of Pleasant Prairie
Corps Contact: Kendra Holman
Address: Army Corps of Engineers
180 5th Street East, Suite 700
St. Paul, MN 55101-1678
E-Mail:Kendra.Holman@usace.army.mil
Phone: (651) 290-5249
Primary County: Kenosha
Section: 24
Township: 1N
Range: 21E
Information Complete On: March 29, 2018
Posting Expires On: June 30, 2018
Authorization Type: LOP-06-WI
This application is being reviewed in accordance with the practices for documenting Corps
jurisdiction under Sections 9 & 10 of the Rivers and Harbors Act of 1899 and Section 404 of the
Clean Water Act identified in Regulatory Guidance Letter 08-02.
Project
PROJECT DESCRIPTION AND PURPOSE: The Village of Pleasant Prairie is seeking to
prepare the project area for future entities to develop a 460 acre business park. The proposed
project would provide the public infrastructure for a business park including roadways, utilities,
and stormwater conveyance features.
The project would include a new roadway, Goldbear Drive, would include two 12' lanes in each
direction along with a 22' wide median, and a 110' wide right of way (ROW). Utilities are
proposed to run under both Goldbear Drive and 128th Ave.
A 10' wide Multiuse Path is also proposed outside of the south side of the Goldbear Drive ROW,
which will provide pedestrian and bike access along the road and to the overall Prairie
Highlands Park. The 10' path width is necessary to support both pedestrian and bike traffic both
into and out of the park.
Proposed public water, sanitary, and storm sewer lines would be located within the public
roadways that provide utility services to the overall park. There are also a few locations along
the perimeter of the park where public utilities would be installed or realigned. Along the north
side of the overall site, along 128th Ave and Wilmot Road, public water main would be installed
which would result in 0.2 acre of temporary wetland impacts. Along east side of the overall site,
where the proposed Goldbear Drive would connect with 120th Ave / W. Frontage Rd, there
would be 0.85 acre of permanent impacts to wetland 7 and 11.
NAME, AREA AND TYPES OF WATERS (INCLUDING WETLANDS) SUBJECT TO LOSS: The
proposed project would involve the permanent discharge of fill material into 0.85 acres of
permanent impact of shallow marsh and wet meadow type wetland. There will be 0.2 acre of
temporary impact to shallow marsh wetland.
Page 1 of 2
ALTERNATIVES CONSIDERED: The proposed alternative (Alternative 1) is described above.
The applicant also considered the following alternatives.
Alternative 2: (Curve) This option provides a realignment of Goldbear Drive that includes an "S
Curve" to connect to the existing access point onto 120th Avenue. This option does result in a
reduction of the overall wetland impacts; however this alternative does not meet the current
WisDOT geometry requirements for safety, and it would encroach on the Haribo site.
Alternative 3: (Shift Road 400') This option provides a realignment of Goldbear Drive that
includes an "S Curve" to completely avoid the existing wetlands. There would be a loss of onsite
parking and removal/relocation of an access route to the Haribo site. This would also account
for a loss of about 2.4 acres for the road and ROW dedication, as well as about another 1 acre
of the stormwater outlot located directly east of the Haribo site along 120th Avenue would also
be impacted. Additional pond volume would be displaced and need to be relocated elsewhere
based on this alignment. Additional construction costs are also necessary for the relocation and
adjustment of the current medial opening for the intersection of 120th Avenue.
Alternative 4: (Shift Road 90') This option provides a realignment of Goldbear Drive that
includes an "S Curve" to connect a new access point onto 120th Avenue slightly north of the
existing access point. This will require approximately 0.45 acre of ROW dedication/property
acquisition of the Haribo property. Additional construction costs are also necessary for the
relocation and adjustment of the current median opening for the intersection of 120th Avenue.
This alternative encroaches onto the Haribo site.
COMPENSATORY MITIGATION: To compensate for permanent unavoidable adverse impacts
to wetlands, the applicant proposes to purchase credits from a wetland bank. The proposed
replacement ratio is 1.2:1 (1.2 credits for every 1 acre impacted).
DRAWINGS: The attached figures include an overview of the proposed project, aquatic
resource locations, and corresponding impacts.
Drawings
See attached figures labeled MVP-2018-00152-KBH pages 1 of 2 through 2 of 2.
Page 2 of 2
1 of 2
Map Legend
Study Area (453.73 Acres)
Copyright:© 2013 National
Geographic Society, i-cubed
Esri, HERE, DeLorme,
MapmyIndia, © OpenStreetMap
contributors, and the GIS user
community
0
1,000
°
2,000
1 inch = 2,000 feet
August 21, 2017
1170246
Village of Pleasant Prairie
Prairie Highland Corporate Park
Village of Pleasant Prairie
Kenosha County, Wisconsin
Document Path: H:\1170246\GIS\Wetland Figures\Figure 1 - Topographic Map.mxd
MVP-2018-00152-KBH
Figure 1
Topographic/
Site Location
Map
2 of 2
0
www.pinnacle-engr.com
MVP-2018-00152-KBH
500'
1" = 250'
WETLAND IMPACTS KEY
ROADWAY WETLAND IMPACTS
-0.85 AC
1" = 250'
ARA
12-12-17
C-1
C-1
COPYRIGHT 2017
PLEASANT PRAIRIE, WI
WETLAND IMPACTS
SHEET
WETLAND IMPACTS
ENGINEERING I NATURAL RESOURCES I SURVEYING
REVISIONS
SCALE
PINNACLE ENGINEERING GROUP
WISCONSIN OFFICE:
15850 W. BLUEMOUND ROAD
BROOKFIELD, WI 53005
(262) 754-8888
CHICAGO I MILWAUKEE : NATIONWIDE
PRAIRIE HIGHLANDS
CORPORATE PARK
START DATE
w w w . p i n n a c l e - e n g r . c o m
PEG PM
PLAN I DESIGN I DELIVER
PEG JOB No. 897.00-WI
FOR REVIEW ONLY
TEMPORARY UTILITY WETLAND IMPACTS
-0.20 AC