LETTER OF PERMISSION: The Village of Pleasant Prairie is seeking to prepare the project area for future entities to develop a 460 acre business park. The proposed project would provide the public infrastructure for a business park including roadways, utilities, and stormwater conveyance features.

PROJECT DESCRIPTION AND PURPOSE: The Village of Pleasant Prairie is seeking to prepare the project area for future entities to develop a 460 acre business park. The proposed project would provide the public infrastructure for a business park including roadways, utilities, and stormwater conveyance features.

Information for File # MVP-2018-00152-KBH Applicant: Village of Pleasant Prairie Corps Contact: Kendra Holman Address: Army Corps of Engineers 180 5th Street East, Suite 700 St. Paul, MN 55101-1678 E-Mail:Kendra.Holman@usace.army.mil Phone: (651) 290-5249 Primary County: Kenosha Section: 24 Township: 1N Range: 21E Information Complete On: March 29, 2018 Posting Expires On: June 30, 2018 Authorization Type: LOP-06-WI This application is being reviewed in accordance with the practices for documenting Corps jurisdiction under Sections 9 & 10 of the Rivers and Harbors Act of 1899 and Section 404 of the Clean Water Act identified in Regulatory Guidance Letter 08-02. Project PROJECT DESCRIPTION AND PURPOSE: The Village of Pleasant Prairie is seeking to prepare the project area for future entities to develop a 460 acre business park. The proposed project would provide the public infrastructure for a business park including roadways, utilities, and stormwater conveyance features. The project would include a new roadway, Goldbear Drive, would include two 12' lanes in each direction along with a 22' wide median, and a 110' wide right of way (ROW). Utilities are proposed to run under both Goldbear Drive and 128th Ave. A 10' wide Multiuse Path is also proposed outside of the south side of the Goldbear Drive ROW, which will provide pedestrian and bike access along the road and to the overall Prairie Highlands Park. The 10' path width is necessary to support both pedestrian and bike traffic both into and out of the park. Proposed public water, sanitary, and storm sewer lines would be located within the public roadways that provide utility services to the overall park. There are also a few locations along the perimeter of the park where public utilities would be installed or realigned. Along the north side of the overall site, along 128th Ave and Wilmot Road, public water main would be installed which would result in 0.2 acre of temporary wetland impacts. Along east side of the overall site, where the proposed Goldbear Drive would connect with 120th Ave / W. Frontage Rd, there would be 0.85 acre of permanent impacts to wetland 7 and 11. NAME, AREA AND TYPES OF WATERS (INCLUDING WETLANDS) SUBJECT TO LOSS: The proposed project would involve the permanent discharge of fill material into 0.85 acres of permanent impact of shallow marsh and wet meadow type wetland. There will be 0.2 acre of temporary impact to shallow marsh wetland. Page 1 of 2

ALTERNATIVES CONSIDERED: The proposed alternative (Alternative 1) is described above. The applicant also considered the following alternatives. Alternative 2: (Curve) This option provides a realignment of Goldbear Drive that includes an "S Curve" to connect to the existing access point onto 120th Avenue. This option does result in a reduction of the overall wetland impacts; however this alternative does not meet the current WisDOT geometry requirements for safety, and it would encroach on the Haribo site. Alternative 3: (Shift Road 400') This option provides a realignment of Goldbear Drive that includes an "S Curve" to completely avoid the existing wetlands. There would be a loss of onsite parking and removal/relocation of an access route to the Haribo site. This would also account for a loss of about 2.4 acres for the road and ROW dedication, as well as about another 1 acre of the stormwater outlot located directly east of the Haribo site along 120th Avenue would also be impacted. Additional pond volume would be displaced and need to be relocated elsewhere based on this alignment. Additional construction costs are also necessary for the relocation and adjustment of the current medial opening for the intersection of 120th Avenue. Alternative 4: (Shift Road 90') This option provides a realignment of Goldbear Drive that includes an "S Curve" to connect a new access point onto 120th Avenue slightly north of the existing access point. This will require approximately 0.45 acre of ROW dedication/property acquisition of the Haribo property. Additional construction costs are also necessary for the relocation and adjustment of the current median opening for the intersection of 120th Avenue. This alternative encroaches onto the Haribo site. COMPENSATORY MITIGATION: To compensate for permanent unavoidable adverse impacts to wetlands, the applicant proposes to purchase credits from a wetland bank. The proposed replacement ratio is 1.2:1 (1.2 credits for every 1 acre impacted). DRAWINGS: The attached figures include an overview of the proposed project, aquatic resource locations, and corresponding impacts. Drawings

See attached figures labeled MVP-2018-00152-KBH pages 1 of 2 through 2 of 2.

Page 2 of 2

1 of 2

Map Legend Study Area (453.73 Acres)

Copyright:© 2013 National Geographic Society, i-cubed Esri, HERE, DeLorme, MapmyIndia, © OpenStreetMap contributors, and the GIS user community

0

1,000

°

2,000

1 inch = 2,000 feet

August 21, 2017 1170246

Village of Pleasant Prairie Prairie Highland Corporate Park Village of Pleasant Prairie Kenosha County, Wisconsin

Document Path: H:\1170246\GIS\Wetland Figures\Figure 1 - Topographic Map.mxd

MVP-2018-00152-KBH

Figure 1 Topographic/ Site Location Map

2 of 2

0

www.pinnacle-engr.com

MVP-2018-00152-KBH

500'

1" = 250'

WETLAND IMPACTS KEY ROADWAY WETLAND IMPACTS -0.85 AC

1" = 250'

ARA

12-12-17

C-1 C-1

COPYRIGHT 2017

PLEASANT PRAIRIE, WI

WETLAND IMPACTS

SHEET

WETLAND IMPACTS

ENGINEERING I NATURAL RESOURCES I SURVEYING

REVISIONS

SCALE

PINNACLE ENGINEERING GROUP

WISCONSIN OFFICE: 15850 W. BLUEMOUND ROAD BROOKFIELD, WI 53005 (262) 754-8888 CHICAGO I MILWAUKEE : NATIONWIDE

PRAIRIE HIGHLANDS CORPORATE PARK

START DATE

w w w . p i n n a c l e - e n g r . c o m

PEG PM

PLAN I DESIGN I DELIVER

PEG JOB No. 897.00-WI

FOR REVIEW ONLY

TEMPORARY UTILITY WETLAND IMPACTS -0.20 AC

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas