View full public noticeThe applicant is proposing to widen a 7.62-mile section of Farm-to-Market

View full public notice The applicant is proposing to widen a 7.62-mile section of Farm-to-Market (“FM”) 60 from State Highway (“SH”) 36 to 0.8 miles southwest of FM 2039 in Burleson County, Texas. A 2.3-mile section of the road widening project from County Road (“CR”) 426 to CR 231 is proposed new location roadway and will be located southeast of the existing FM 60 right-of-way ("ROW"). he planned improvements will upgrade the existing two-lane roadway to a four-lane divided facility with paved shoulders including a depressed median throughout the project. The roadway alignment would deviate from its existing location to bypass the Centerline community and to straighten the curve at Lone Oak Baptist Church. Two (2) new bridges will be constructed over the Davidson Creek floodplain. The first bridge will be approximately 650 feet long and the second bridge will be approximately 950 feet long.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas