The applicant proposes to construct new and modify existing features at the Mustang Beach Airport.

Full Public Notice Proposed Project Plans Proposed Mitigation Plan PROJECT DESCRIPTION: The applicant proposes to: 1) construct a taxiway turnaround on the northwest end of the existing runway; 2) extend the existing runway and parallel taxiway to the southeast; 3) construct an apron north of the extended runway; and, 4) relocate an existing drainage ditch to the north of the proposed runway extension.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas