Home

Galveston District

Run scraper

McMoRan Oil & Gas decomsn pipeline 13444

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The applicant proposes to decommission, in place, approximately 5.2 miles of an 8-inch-diameter pipeline.

Full Public Notice Project Plans PROJECT DESCRIPTION: The applicant proposes to decommission, in place, approximately 5.2 miles of an 8-inch-diameter oil pipeline. Installation of the pipeline was authorized on 25 May 1979 under Department of the Army Permit No. 13444. The existing pipeline is to be cut, flushed, and capped.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas