You can copy from here when filling out the rest of the page.
The applicant proposes to decommission, in place, approximately 5.2 miles of an 8-inch-diameter pipeline.
Full Public Notice Project Plans
PROJECT DESCRIPTION: The applicant proposes to decommission, in place, approximately 5.2 miles of an 8-inch-diameter oil pipeline. Installation of the pipeline was authorized on 25 May 1979 under Department of the Army Permit No. 13444. The existing pipeline is to be cut, flushed, and capped.