LETTER OF PERMISSION: The proposed project would improve load serving reliability to an additional 15MW of load for Enbridge’s Ladysmith Pumping Station and other customers in the Ladysmith area. The existing 69 kV transmission system that serves these loads has over 50 miles of exposed line between breakers. By building a new 69 kV breaker station near Xcel Energy’s 161/69 kV line intersection located just north of Enbridge’s Ladysmith Pumping Station, it reduces the potential for fault exposure and improves reliability for these large customers.

PROJECT DESCRIPTION AND PURPOSE: The proposed project would improve load serving reliability to an additional 15MW of load for Enbridge’s Ladysmith Pumping Station and other customers in the Ladysmith area. The existing 69 kV transmission system that serves these loads has over 50 miles of exposed line between breakers. By building a new 69 kV breaker station near Xcel Energy’s 161/69 kV line intersection located just north of Enbridge’s Ladysmith Pumping Station, it reduces the potential for fault exposure and improves reliability for these large customers.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas