You can copy from here when filling out the rest of the page.
LETTER OF PERMISSION: The proposed project would improve load serving reliability to an additional 15MW of load for Enbridge’s Ladysmith Pumping Station and other customers in the Ladysmith area. The existing 69 kV transmission system that serves these loads has over 50 miles of exposed line between breakers. By building a new 69 kV breaker station near Xcel Energy’s 161/69 kV line intersection located just north of Enbridge’s Ladysmith Pumping Station, it reduces the potential for fault exposure and improves reliability for these large customers.
PROJECT DESCRIPTION AND PURPOSE: The proposed project would improve load serving reliability to an additional 15MW of load for Enbridge’s Ladysmith Pumping Station and other customers in the Ladysmith area. The existing 69 kV transmission system that serves these loads has over 50 miles of exposed line between breakers. By building a new 69 kV breaker station near Xcel Energy’s 161/69 kV line intersection located just north of Enbridge’s Ladysmith Pumping Station, it reduces the potential for fault exposure and improves reliability for these large customers.