Home

Alaska District

Run scraper

Sarah Kenshalo

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

Sarah Kenshalo, with ConocoPhillips Alaska, Inc., PO Box 100360, Anchorage, Alaska 99501, (907) 265-1550, email: Sarah.M.Kenshalo@conocophillips.com, states that the project purpose is to develop a new gravel material cell at Mine Site E. Work being proposed includes mechanized land clearing for the development of a material site and placement of 12,600 cubic yards of mineral overburden for the construction of thermal berms along three sides of the material site to prevent permafrost thawing, this is proposed within 24.1 acres of palustrine wetlands to support continued maintenance of existing roads and pads throughout the Kuparuk River Unit. The new cell within Mine Site E would be called Cell 5. Access would be through the existing infrastructure of Mine Site E, the Mine Site E road and cell 2 of Mine Site E. The project site is located within Section 24 T. 13 N., R. 9 E., Umiat Meridian; USGS Quad Map Beechey Point B-5; Latitude 70.4645º N., Longitude 149.6982º W.; Milne Point Unit, 35 miles northwest of Prudhoe Bay, Alaska. Please contact Mary Romero at (907) 753-2773, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at mary.r.romero@usace.army.mil if further information is desired concerning this notice.

Sarah Kenshalo, with ConocoPhillips Alaska, Inc., PO Box 100360, Anchorage, Alaska 99501, (907) 265-1550, email: Sarah.M.Kenshalo@conocophillips.com, states that the project purpose is to develop a new gravel material cell at Mine Site E. Work being proposed includes mechanized land clearing for the development of a material site and placement of 12,600 cubic yards of mineral overburden for the construction of thermal berms along three sides of the material site to prevent permafrost thawing, this is proposed within 24.1 acres of palustrine wetlands to support continued maintenance of existing roads and pads throughout the Kuparuk River Unit. The new cell within Mine Site E would be called Cell 5. Access would be through the existing infrastructure of Mine Site E, the Mine Site E road and cell 2 of Mine Site E. The project site is located within Section 24 T. 13 N., R. 9 E., Umiat Meridian; USGS Quad Map Beechey Point B-5; Latitude 70.4645º N., Longitude 149.6982º W.; Milne Point Unit, 35 miles northwest of Prudhoe Bay, Alaska. Please contact Mary Romero at (907) 753-2773, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at mary.r.romero@usace.army.mil if further information is desired concerning this notice. POA-1983-00478-M8, Ugnuravik River_PN and Drawings POA-1983-00478, Mine site E Expansion Wetland Mitigation Plan

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas