Home

Alaska District

Run scraper

Anne Bailey

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

Anne Bailey, with Aleutians East Borough, 3380 C St., Ste. 205, Anchorage, AK 99503, states that the project's purpose is to provide vessel mooring in an existing harbor by installing floating docks which will provide local and regional economic benefits by alleviating moorage demand and improving safety for residents, the commercial and subsistence fishing fleets, and transient vessels, especially during the frequent Aleutian storms. Work being proposed includes the discharge of up to 60 cubic yards (CY) of clean fill and rock riprap into 360 square feet (sf) of tidal waters below the high tide line ( HTL), (approximate elevation +9.5 feet above the 0.0 foot contour) for the installation . The applicant is also proposing to install up to 88 new galvanized steel pipe piles (24-inch diameter or less) below the mean high water mark (MHW, approximate elevation +6.5 feet above the 0.0 foot contour). The project site is located within Section 17, T. 56 S., R. 73 W., Seward Meridian; USGS Quad Map Port Moller B-2; Latitude 55.329828º N., Longitude 160.504203º W.; at the southwest end of Boat Harbor Road, in Sand Point, Alaska. Please contact Andy Mitzel at (907) 753-2689, by fax at (907) 420-0813, or by email at andy.mitzel@usace.army.mil if further information is desired concerning this notice.

Anne Bailey, with Aleutians East Borough, 3380 C St., Ste. 205, Anchorage, AK 99503, states that the project's purpose is to provide vessel mooring in an existing harbor by installing floating docks which will provide local and regional economic benefits by alleviating moorage demand and improving safety for residents, the commercial and subsistence fishing fleets, and transient vessels, especially during the frequent Aleutian storms. Work being proposed includes the discharge of up to 60 cubic yards (CY) of clean fill and rock riprap into 360 square feet (sf) of tidal waters below the high tide line ( HTL), (approximate elevation +9.5 feet above the 0.0 foot contour) for the installation . The applicant is also proposing to install up to 88 new galvanized steel pipe piles (24-inch diameter or less) below the mean high water mark (MHW, approximate elevation +6.5 feet above the 0.0 foot contour). The project site is located within Section 17, T. 56 S., R. 73 W., Seward Meridian; USGS Quad Map Port Moller B-2; Latitude 55.329828º N., Longitude 160.504203º W.; at the southwest end of Boat Harbor Road, in Sand Point, Alaska. Please contact Andy Mitzel at (907) 753-2689, by fax at (907) 420-0813, or by email at andy.mitzel@usace.army.mil if further information is desired concerning this notice. POA-2006-2015-M4_PN and Drawings

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas