You can copy from here when filling out the rest of the page.
The applicant, Phillips 66 Holdings, has requested Department of the Army (DA) authorization to Demolish existing structures (dock, pier, moorings and pipes), dredge (deepening) by clam-shell bucket and blasting to a depth of 40 feet with 2 feet of overdredge, construction of new pier, dock, piping and dolphins at Berth A and Berth C-D within Waters of the United States to expand the facility to meet energy demands, in the Arthur Kill at 4601 Tremley Point Road, Linden, NJ 07036 (Latitude: 40.603035° Longitude -74.203852°)
The applicant, Phillips 66 Holdings, has requested Department of the Army (DA) authorization to Demolish existing structures (dock, pier, moorings and pipes), dredge (deepening) by clam-shell bucket and blasting to a depth of 40 feet with 2 feet of overdredge, construction of new pier, dock, piping and dolphins at Berth A and Berth C-D within Waters of the United States to expand the facility to meet energy demands, in the Arthur Kill at 4601 Tremley Point Road, Linden, NJ 07036 (Latitude: 40.603035° Longitude -74.203852°)