Fieldwood Energy pipe decmsn Well A Galveston Block 151 and Platform A, High Island Block 179;

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The applicant proposes to decommission-in-place 6-inch bulk gas Pipeline Segment Number 12084.

Full Public Notice Project Plans PROJECT DESCRIPTION: The applicant proposes to decommission-in-place 6-inch bulk gas Pipeline Segment Number 12084. In accordance with the Bureau of Safety and Environmental Enforcement (BSEE) 30 CFR 250.1750 pipeline decommissioning requirements, the applicant proposes to: 1) disconnect from previously serviced Well A, Galveston Block 151 and Platform A, High Island Block 179; 2) flush by pigging and filling with seawater to equalize the line pressure; 3) remove pipeline end risers and plug; and 4) confirm depth of cover at the pipeline ends and cover endpoints with protective sand/cement bags. Jetting will be used to expose pipeline riser endpoints and allow pipe “cold cuts.” There will be no dredged or fill materials involved in these operations. No structures will be installed. The applicant’s plans are enclosed in 6 sheets.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas