Home

Galveston District

Run scraper

HDFI Land Holdings Basford Bayou mitigation bank

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The purpose is to develop a mitigation bank to sell credits as compensatory mitigation.

Full Public NoticeProspectus (Part 1) Prospectus (Part 2) PROJECT DESCRIPTION: The purpose is to develop a mitigation bank to sell credits as compensatory mitigation. The goal of the bank will be achieved by re-establishing, rehabilitating, and enhancing estuarine wetlands by removing spoil deposited during the construction of the Highland Bayou Diversion Canal, and re-establishing native emergent wetland vegetation. The applicant’s plans are enclosed in 174 sheets.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas