This notice announces a prospectus has been submitted for the development of the Stitches Stream Mitigation Project pursuant to 33 CFR 332, Compensatory Mitigation for Losses of Aquatic Resources (Federal Register: April 10, 2008, effective June 9, 2008).

Public Notice No. 18-28 Nashville District Application No. LRN-2018-00503 Date: July 5, 2018; Expires: August 5, 2018

Please address comments to: Nashville District Corps of Engineers, Regulatory Division

3701 Bell Road, Nashville, TN 37214-2660 SUBJECT: This notice announces a prospectus has been submitted for the development of the Stitches Stream Mitigation Project pursuant to 33 CFR 332, Compensatory Mitigation for Losses of Aquatic Resources (Federal Register: April 10, 2008, effective June 9, 2008).

BANK SPONSOR: Tennessee Stream Mitigation Program

5000 Linbar Drive, Suite 275

Nashville, Tennessee 37211

LOCATION: The proposed stream mitigation project encompasses 102 acres that is located 4.3 miles northeast of Red Boiling Springs (approximately 1.5 miles from Kentucky/Tennessee state line) in Macon County, Tennessee (Latitude N 36.597756, Longitude W -85.806990). The proposed mitigation

project would incorporate approximately 7 miles (37,000 +/- linear feet) of intermittent and perennial stream channels along several unnamed tributaries to East Fork Barren River, which is a major tributary of the Barren River.

PURPOSE: The Stitches Stream Mitigation Plan is proposed to provide compensatory stream mitigation for permitted impacts within the East Lower Cumberland Service Area in accordance with TSMP’s approved In-Lieu Fee (ILF) Instrument.

GENERAL INFORMATION: An ILF program involves the restoration, establishment, reestablishment, enhancement, rehabilitation and/or preservation of aquatic resources through funds paid to a governmental or non-profit natural resources management entity to satisfy compensatory mitigation requirements for DA permits. Similar to a mitigation bank, an ILF program sells compensatory mitigation credits to permittees whose obligation to provide compensatory mitigation is then transferred to the ILF program sponsor. The operation and use of an ILF program are governed by an ILF program instrument.

A group of federal and state regulatory and resource agency representatives known as the Interagency Review Team (IRT) would oversee the establishment and management of the mitigation site. The IRT is chaired by the US Army Corps of Engineers, Nashville District (USACE). The primary role of the IRT is to facilitate the establishment of the ILF program through the development of an ILF Instrument. The IRT also reviews ILF mitigation proposals and provides comments to the Corps.

In Tennessee, the approval of the use of the ILF program for specific projects is the decision of the Corps pursuant to Section 10 of the Rivers and Harbors Act of 1899 and/or Section 404 of the Clean Water Act (CWA) and/or the Tennessee Department of Environmental Conservation (TDEC) pursuant to Section 401 of the CWA and/or applicable state of Tennessee statute(s) and regulation(s). The Corps and TDEC provide no guarantee that any particular individual or general permit proposing to use the ILF program for compensation mitigation would be authorized.

PROJECT DESCRIPTION: The existing streams are degraded due to channelization, impoundment, channel modifications, and habitat alterations are present throughout the site. Prior land uses included unrestricted cattle access and agricultural/farming activities. None of the stream reaches in the proposed area have been assessed by TDEC. The principal tributary in the proposed project area drains into Line Creek, downstream of the project boundaries. The overall goal of the mitigation bank is to restore, to the greatest extent possible, the ecological function of the highly degraded aquatic resources within the mitigation bank site. The proposed project would consist of the rehabilitation, re-establishment, enhancement, and riparian buffer planting of approximately 37,000

linear feet of unnamed tributaries to Line Creek utilizing natural channel design techniques to provide a functional lift capable of restoring natural channel hydrology, hydraulic, geomorphic, physiochemical, and biological characteristics. Project goals include: (1) re-establishment of headwater streams on destroyed channels, 2) headwater stream restoration, 3) headwater stream enhancement and 4) headwater stream preservation. Of the approximately 37,000 linear feet in the project area, 6,942 linear feet would be reestablished, 20,805 linear feet would be restored, 6,848 linear feet would be restored, and 2,848 linear feet would be preserved. Details are contained in the Stitches Stream Mitigation Project Prospectus dated June 22, 2018.

The plan can be viewed at: http://www.lrn.usace.army.mil/Media/PublicNotices.aspx. Information in the mitigation plan would serve as the basis for deriving and releasing credits for the ILF program.

HISTORIC AND CULTURAL RESOURCES: A review of the Tennessee Historical Commission Web Service Database indicated no publicly visible sites were found to occur on the project site. A search of the National Register returned no findings of historic properties currently listed on the National Register of Historic Places within the project area. A Phase I environmental assessment was conducted for the project area (report dated 29-Jan-2018). The Phase I assessment determined that there were no recognized hazardous environmental conditions found in the project area. The Corps invites responses to this public notice from American Indian tribes or tribal governments; federal, state, and local agencies; historical and archeological societies; and other parties likely to have knowledge of or concerns regarding historic properties and cultural significance at or near the project area. Through examination of the site plan, USACE will evaluate the design plans along with any substantive comments from this public notice to determine the potential of impacts to historic and cultural resources for Section 106 compliance. If the Corps determines that consultation is required, the Corps would consult with the Tennessee Historic Commission (SHPO) and American Indian Tribes in accordance with Section 106 of the National Historic Preservation Act, as appropriate.

ENDANGERED/THREATENED SPECIES REVIEW: A review of the United States Fish and Wildlife Service (USFWS) website, http://ecos.fws.gov/ipac identified the following federally-listed species that are known to or believed to occur in Macon County, Tennessee:

Species Nomenclature

Federal Status

Mammals

Gray bat (Myotis grisescens)

Endangered

Indiana bat (Myotis sodalis)

Endangered

Northern long-eared bat (Myotis septentrionalis)

Threatened

Freshwater Mussels

Spectaclecase (Cumberlandia monodonta)

Endangered

Dromedary pearlymussel (Dromus dromus)

Endangered

Cumberlandian combshell (Epioblasma brevidens)

Endangered

Yellow blossom (Epioblasma florentina florentina)

Endangered

Tubercled blossom (Epioblasma torulosa torulosa)

Endangered

Pink mucket (Lampsilis abrupta)

Endangered

Ring pink (Obovaria retusa)

Endangered

Orangefoot pimpleback (Plethobasus cooperianus)

Endangered

White wartyback (Plethobasus cicatricosis)

Endangered

Rough pigtoe (Pleurobema plenum)

Endangered

Appalachian monkeyface (Quadrula sparsa)

Endangered

A copy of this notice is being furnished to USFWS for their review. After receipt of any comments, the USACE will evaluate the potential effects to proposed and/or listed species and their designated critical habitat, and initiate consultation with the U.S. Fish & Wildlife Service, if required.

COMMENT PERIOD: Written statements received in this office within 30 days from the date of this notice will become a part of the record and will be considered in the determination. Any response to this notice should be directed to the Nashville District Corps of Engineers, Regulatory Division, Attention: Mr. Mark G. McIntosh at the above address or by email: mark.g.mcintosh@usace.army.mil.

\s\

Joshua W. Frost

Chief, Technical Services Branch Regulatory Division

U.S. Army Corps of Engineers

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas