The applicant is applying for an After-the-Fact Permit. The applicant has placed approximately 59 cubic yards of fill material in 350 linear feet of stream to impound water over 1

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The applicant is applying for an After-the-Fact Permit. The applicant has placed approximately 59 cubic yards of fill material in 350 linear feet of stream to impound water over 1,054 linear feet of stream to form a 7.05-surface acre pond. The proposed project includes construction of an earthen dam approximately 500 feet in length.

The applicant is applying for an After-the-Fact Permit. The applicant has placed approximately 59 cubic yards of fill material in 350 linear feet of stream to impound water over 1,054 linear feet of stream to form a 7.05-surface acre pond. The proposed project includes construction of an earthen dam approximately 500 feet in length.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas