Home

Tulsa District

Run scraper

The application is for an After-the-Fact Permit for the unauthorized discharge of fill material into Sycamore Creek to facilitate the construction of a dam

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The application is for an After-the-Fact Permit for the unauthorized discharge of fill material into Sycamore Creek to facilitate the construction of a dam, including a principle and emergency spillway, resulting in the creation of Halter Lake.

The applicant’s proposal is to leave the previously unauthorized earthen dam in place. The proposal includes the placement of approximately 2,300 cys of earthen fill material into Sycamore Creek and will result in the permanent inundation of approximately 4,600 linear feet of Sycamore Creek. The applicant used native earthen material and conventional earthwork methods and equipment to complete the construction.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas