Home

Alaska District

Run scraper

Alaska Department of Transportation and Public Facilities (AKDOT&PF) stated purpose is to construct a new high-capacity marine dock facility

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

Alaska Department of Transportation and Public Facilities (AKDOT&PF) stated purpose is to construct a new high-capacity marine dock facility, compliant with current seismic performance requirements and would provide additional upland area for safe passenger transfer and/or staging of cargo and materials. LOCATION: The project site is located within Section 17, T. 56 S., R. 73 W., Seward Meridian; USGS Quad Map Port Moller B-2; Latitude 55.3318º N., Longitude 160.5041º W.; near Sand Point, Alaska. PROPOSED WORK: The proposed project would involve the discharge of 650 cubic yards (cy) of core rock fill, 200 cy class A armor, and 100 cy of class B armor into 0.03 acres below the high tide line (HTL, approximate elevation +9.5 feet above the 0.0 foot contour) and the discharge of 9,000 cy of core rock fill, 1,900 cy class A armor, and 1,600 cy of class B armor into 0.81 acres below the mean high water mark (MHW, approximate elevation +6.5 feet above the 0.0 foot contour) to construct a new pile supported dock adjacent to the southwest end of the existing dock and would be approximately 70-ft wide and 220-ft long.

POA-2018-253, Sand Point Harbor_PNAlaska Department of Transportation and Public Facilities (AKDOT&PF) stated purpose is to construct a new high-capacity marine dock facility, compliant with current seismic performance requirements and would provide additional upland area for safe passenger transfer and/or staging of cargo and materials. LOCATION: The project site is located within Section 17, T. 56 S., R. 73 W., Seward Meridian; USGS Quad Map Port Moller B-2; Latitude 55.3318º N., Longitude 160.5041º W.; near Sand Point, Alaska. PROPOSED WORK: The proposed project would involve the discharge of 650 cubic yards (cy) of core rock fill, 200 cy class A armor, and 100 cy of class B armor into 0.03 acres below the high tide line (HTL, approximate elevation +9.5 feet above the 0.0 foot contour) and the discharge of 9,000 cy of core rock fill, 1,900 cy class A armor, and 1,600 cy of class B armor into 0.81 acres below the mean high water mark (MHW, approximate elevation +6.5 feet above the 0.0 foot contour) to construct a new pile supported dock adjacent to the southwest end of the existing dock and would be approximately 70-ft wide and 220-ft long. All comments should reach this office no later than the expiration date of this Public Notice to become part of the record and be considered in the decision. Please contact Andy Mitzel at (907) 753-2689, by fax at (907) 420-0813, or by email at andy.mitzel@usace.army.mil if further information is desired concerning this notice. POA-2018-253, Sand Point Harbor_PN POA-2018-253, Sandy Point Harbor_Drawings

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas