Home

New Orleans District

Run scraper

MVN-2008-00302-CG

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

CONTINUATION OF SAND MINING OPERATIONS IN THE MISSISSIPPI RIVER IN ASCENSION PARISH

NAME OF APPLICANT: South Louisiana Fill Materials, LLC, c/o Leonard McCauley of Pangaea Conservation & Compliance, LLC, Post Office Box 40345, Baton Rouge, LA 70832. LOCATION OF WORK: On the Mississippi River, left descending bank at river mile 172.5, west of Darrow, Louisiana, in Ascension Parish, within the Mississippi River Basin in hydrologic unit (HUC 08070100), as shown on the attached drawings (Latitude 30.116920 N, Longitude -90.950711 W). CHARACTER OF WORK: The entire project location has historically been an active sand mining operation area and was previously authorized as two separate sites. The northern portion was authorized as MVN-2008-00302-CU on March 6, 2009 to the current applicant and extended for time on September 14, 2015. The southern portion was authorized as MVN-2013-01904-CL on April 21, 2014 to B&K Equipment Services, Inc. and transferred to the current applicant on August 10, 2017. The two sites have been merged into an approx. 135-acre mining operation facility under management of South Louisiana Fill Materials, LLC. The applicant now requests Department of the Army authorization to continue use of the newly adjoined sand mining facility and to modify the site to include adjustments to the locations of stockpile areas and borrow pits, the removal of some of the existing levees, the installation of a new culvert and drainage ditch, an increase to the height of a portion of an existing road, and the installation of a barge loading area onsite as shown in the attached drawings. In order to accomplish this project, approx. 52,378 cubic yards will be excavated or mined on-site and placed to accomplish the site modifications. A total of approx. 101,000 cubic yards of material will be excavated from the on-site borrow pits and/or hydraulically dredged from a maximum of approx. 42.8 acres of traditionally navigable waters, per month as part of the continued sand mining operations. The applicant proposes to avoid additional direct impacts and minimize secondary impacts by remaining within the footprint of the existing mining operation facility, avoiding all wetlands and utilizing best management practices during the construction phase of the project and the project.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas