The Los Angeles District, U. S. Army Corps of Engineers (Corps) is preparing an Environmental Assessment (EA) for proposed maintenance dredging of the Channel Islands and Port Hueneme Harbors in Ventura County, California. The proposed project would consist of a six-year program to dredge approximately 6.9 million cubic yards of sandy sediment from the Channel Islands and Port Hueneme Harbors. Placement of dredged materials is expected to be on Hueneme Beach and/or Silver Strand Beach.
The Los Angeles District, U. S. Army Corps of Engineers (Corps) is preparing an Environmental Assessment (EA) for proposed maintenance dredging of the Channel Islands and Port Hueneme Harbors in Ventura County, California. The proposed project would consist of a six-year program to dredge approximately 6.9 million cubic yards of sandy sediment from the Channel Islands and Port Hueneme Harbors. Placement of dredged materials is expected to be on Hueneme Beach and/or Silver Strand Beach. The project area encompasses approximately 3.3 miles of shoreline, extending from Channel Islands Harbor in the north to Hueneme Beach in the south. The area is located approximately 65 miles northwest of Los Angeles at the edge of the Oxnard Plain in Ventura County.
At Channel Islands Harbor, material would be dredged from the entrance channel, sand traps, entrance basin, and inner basin. The required dredging is planned to be accomplished in three biennial dredging cycles (at years 1, 3, and 5). Each dredging cycle is estimated to remove between approximately 800,000 and 2.2 million cubic yards of material. Project depth is -20 feet Mean Low Water (MLLW) at the Entrance Channel and Entrance Basin, and -35 feet MLLW at the sand trap.
At Port Hueneme Harbor, material would be dredged from the approach and entrance channels, and turning basin. The required dredging is planned to be accomplished once on the same schedule as the dredging of Channel Islands Harbor (i.e., during one of the three cycles). The dredging cycle would remove approximately 200,000 cubic yards of material. Project depth at Port Hueneme Harbor is -40 feet MLLW at the approach channel and -36 feet MLLW at the Entrance Channel and Turning Basin.
The Environmental Assessment is being prepared in compliance with the National Environmental Protection Act (NEPA) other Federal laws, regulations, Executive Orders, and Corps’ policies. The Corps is the lead Federal agency for the Proposed Action, as no other agency is involved in implementing the Proposed Action Comments received will be considered in determining whether an Environmental Impact Statement (EIS) will be required or whether a Finding of No Significant Impact (FONSI) can be issued.
All comments must be received by 5 p.m. on July 26, 2018.
If you have questions or would like additional information, please contact Ian Bordenave at (213)
452-3874. Comments should be sent to:
Mr. Ian Bordenave, Biological Sciences and Environmental Manager
U.S. Army Corps of Engineers, Los Angeles District
USACE-SPL-PDR-L
915 Wilshire Boulevard, Ste 930
Los Angeles, California 90017-3401
or by email at
ian.t.bordenave@usace.army.mil