PUBLIC NOTICE: This is an application for a permit to permanently discharge fill material in a total of 2.22 acres of wetland associated with the construction of a new commercial facility located in the Village of Sturtevant in Racine County.

PROJECT DESCRIPTION AND PURPOSE:This is an application for a permit to permanently discharge fill material in a total of 2.22 acres of wetland associated with the construction of a new commercial facility located in the Village of Sturtevant in Racine County. The proposed project is for a Less than Load (LTL) freight carrier and includes the construction of a 138,000 square foot commercial freight warehouse with 209 loading dock doors, a 33,000 square foot maintenance building, a 5,500 square foot office building, and a total of 582 employee, tractor, and trailer parking spaces.

APPLICANT:

Stream's Edge Properties, LLC c/o Anthony Rocco

REFER TO:

MVP-2015-04002-ANM

Public Notice ISSUED: July 10, 2018 EXPIRES: August 10, 2018

SECTION: 404 - Clean Water Act

1. APPLICATION FOR PERMIT TO permanently discharge fill material in a total of 2.22 acres of wetland associated with the construction of a new commercial facility located in the Village of Sturtevant in Racine County. 2. SPECIFIC INFORMATION AGENT:

EMH&T c/o Russell Henestofel 5500 New Albany Road Columbus, OH 43219

APPLICANT:

Stream's Edge Properties, LLC c/o Anthony Rocco 6450 Poe Avenue Dayton, OH 45414

PROJECT LOCATION: The 33-acre project site is located in the southeast corner of Hwy 11 (Durand Avenue) and County Highway H (Herzog Road) in Section 28, Township 03, Range 22 East in Racine County, Wisconsin. See the attached drawings MVP-2015-04002-ANM Figures 1-2, for more information. DESCRIPTION OF PROJECT: The proposed project is for a Less than Load (LTL) freight carrier and includes the construction of a 138,000 square foot commercial freight warehouse with 209 loading dock doors, a 33,000 square foot maintenance building, a 5,500 square foot office building, and a total of 582 employee, tractor, and trailer parking spaces. QUANTITY, TYPE, AND AREA OF FILL: The proposed project is currently estimated to result in the filling and permanent loss of approximately 2.22 acres of wetland. The impacted wetland types include 0.25 acre of fresh wet meadow, 0.97 acre of shallow marsh, and 1.0 acre of hardwood swamp. ALTERNATIVES: Several other sites in the area were considered as alternative locations and were evaluated based on road and utility improvements and costs, freeway access, and wetland impact amounts. An alternative on-site design with a reduced footprint and less wetland impact was also evaluated. The smaller design includes a 67,500 square foot warehouse and 18,000 square foot maintenance building that would impact 0.96 acre of wetland. VEGETATION IN AFFECTED AREA: Two wetlands are located on the site (Wetland A and Wetland B). Wetland A is a 2.09-acre shallow marsh and hardwood swamp wetland dominated by black willow and narrow leaved cattail. Wetland B is a 0.25-acre fresh wet meadow wetland dominated by reed canary grass. SOURCE OF FILL MATERIAL: Any off-site fill utilized for the project would come from an existing commercial source and would be free of any known contaminants. SURROUNDING LAND USE: The land use in the surrounding area west of the project is currently agricultural fields. Land use to the east of the project is a mix of commercial and residential development.

Regulatory Branch (File No. MVP-2015-04002-ANM)

THE FOLLOWING POTENTIALLY TOXIC MATERIALS COULD BE USED AT THE PROJECT SITE: The project does not propose to use toxic materials, but fluid used in construction equipment may pose a slight risk. All equipment would be maintained and stored according to the Erosion & Sediment Control Plan provided by the contractor. THE FOLLOWING PRECAUTIONS TO PROTECT WATER QUALITY HAVE BEEN DESCRIBED BY THE APPLICANT: The proposed project would be conducted in compliance with the state's erosion control and stormwater best management practices to prevent sediment from leaving the site during and after construction. MITIGATION: The applicant proposes to fulfill federal compensatory mitigation requirements by debiting credits from an approved mitigation bank or through the Wisconsin Wetland Conservation Trust in-lieu fee wetland mitigation program. 3. FEDERALLY-LISTED THREATENED OR ENDANGERED WILDLIFE OR PLANTS OR THEIR CRITICAL HABITAT None were identified by the applicant. However, the proposed project is within the known or historic range of the following Federally-listed species: Northern Long-Eared Bat (Threatened)

Red Knot (Threatened)

Hibernates in caves and mines ­ swarming in surrounding wooded areas in autumn. Roosts and forages in upland forests during spring and summer.

Shorebird who prefers areas rich in small clams and mussels.

This application is being coordinated with the U.S. Fish and Wildlife Service. Any comments it may have concerning Federally-listed threatened or endangered wildlife or plants or their critical habitat will be considered in our final assessment of the described work. 4. JURISDICTION This application is being reviewed in accordance with the practices for documenting Corps jurisdiction under Sections 9 & 10 of the Rivers and Harbors Act of 1899 and Section 404 of the Clean Water Act identified in Regulatory Guidance Letter 16-01. 5. STATE SECTION 401 WATER QUALITY CERTIFICATION WATER QUALITY CERTIFICATION. This Public Notice has been sent to the Wisconsin Department of Natural Resources and is considered by the District Engineer to constitute valid notification to that agency for Section 401 water quality certification. A permit will not be granted until the Wisconsin Department of Natural Resources has issued or waived Section 401 certification.

Page 2 of 4

Regulatory Branch (File No. MVP-2015-04002-ANM) 6. HISTORICAL/ARCHAEOLOGICAL This public notice is being sent to the National Park Service and the State Archaeologist for their comments. The Corps will review information on known cultural resources and/or historic properties within and adjacent to the project area. The Corps will also consider the potential effects of the project on any properties that have yet to be identified. The results of this review and the Corps' determination of effect will be coordinated with the State Historic Preservation Officer independent of this public notice. Any adverse effects on historic properties will be resolved prior to the Corps authorization, or approval, of the work in connection with this project. The Wisconsin Historic Preservation Database was consulted and no listed properties are located within or adjacent to the project area. 7.

PUBLIC HEARING REQUESTS

Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for public hearings shall state, in detail, the reasons for holding a public hearing. A request may be denied if substantive reasons for holding a hearing are not provided or if there is otherwise no valid interest to be served. 8. PUBLIC INTEREST REVIEW The decision whether to issue a permit will be based on an evaluation of the probable impact, including cumulative impacts, of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered, including the cumulative effects. Among those are conservation, economics, aesthetics, general environmental concerns, wetlands, cultural values, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production and, in general, the needs and welfare of the people. Environmental and other documents will be available for review in the St. Paul District Office. The Corps of Engineers is soliciting comments from the public; Federal, State, and local agencies and officials; Indian tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. 10. COASTAL ZONE MANAGEMENT The Wisconsin Coastal Management Program (WCMP) in the Department of Administration is inviting public comment regarding this project. The WCMP may conduct a Federal consistency review to verify that the project will comply with State policies in Wisconsin's coastal zone. Further information may be obtained from the Federal Consistency Coordinator at: Wisconsin Coastal Management Program, P.O. Box 7868, Madison, WI 53707-7868; (608) 267-7982. Page 3 of 4

Regulatory Branch (File No. MVP-2015-04002-ANM) Any comments on whether or not this proposed project complies with the State enforceable policies should be received within 30 days by the Federal Consistency Coordinator. 9.

REPLIES/COMMENTS

Interested parties are invited to submit to this office written facts, arguments, or objections within 30 days of the date of this notice. These statements should bear upon the suitability of the location and the adequacy of the project and should, if appropriate, suggest any changes believed to be desirable. Comments received may be forwarded to the applicant.

Replies may be addressed to: U.S. Army Corps of Engineers Attn: April Marcangeli 250 N. Sunnyslope Road, Suite 296 Brookfield, Wisconsin 53005 Or, IF YOU HAVE QUESTIONS ABOUT THE PROJECT, call April Marcangeli at the Brookfield office of the Corps, telephone number 651-290-5731. To receive Public Notices by e-mail, go to: http://mvp-extstp/list_server/ and add your information in the New Registration Box.

Todd Vesperman Chief, Southeast Section

Enclosures: MVP-2015-04002-ANM Figures 1-2

Page 4 of 4

MVP-2015-04002-ANM Figure 1 of 2

Figure 1 - Project Location

Legend Municipality State Boundaries County Boundaries Major Roads Interstate Highway State Highway US Highway

County and Local Roads County HWY Local Road

Railroads Tribal Lands Rivers and Streams Intermittent Streams Lakes and Open water

Notes 0.8

NAD_1983_HARN_Wisconsin_TM

0

0.38

1: 23,760

0.8 Miles

DISCLAIMER: The information shown on these maps has been obtained from various sources, and are of varying age, reliability and resolution. These maps are not intended to be used for navigation, nor are these maps an authoritative source of information about legal land ownership or public access. No warranty, expressed or implied, is made regarding accuracy, applicability for a particular use, completeness, or legality of the information depicted on this map. For more information, see the DNR Legal Notices web page: http://dnr.wi.gov/legal/

MVP-2015-04002-ANM Figure 2 of 2

Durand Ave. - S.T.H. "11"

Existing Durand Ave. Centerline

A

24'

Man Gate

70'

Portable Snow Melter Area

24'

X

24 Tractor Spaces or 12 Trailer Spaces

X

24 Tractor Spaces or 12 Trailer Spaces

15 Trailer Spaces (Phase 2)

28 Tractor Spaces (Phase 2)

X

24'

X

24'

X

20 Tractor Spaces or 10 Trailer Spaces

Proposed Maintenance Building

20 Tractor Spaces or 10 Trailer Spaces

70' 70'

Portable Snow Melter Area (Phase 2)

Impacted Wetland (0.253 Acres)

Address: 10017 Durand Ave. 933,887.5 s.f. 21.44 ac.

X

7 Tractor/ Equipment Parking Spaces 14 Trailer Spaces

X X

70'

70'

12' Side Yard

5 Trailer Spaces

X X

Dual Sliding Gates

X

Portable Snow Melter Area (Phase 2)

X

6 Bay Maintenance Building Expansion (Phase 2)

Impacted Wetland (1.969 Acres)

70'

X

80± Door Terminal Expansion (Phase 2)

Proposed 129 Door Terminal Excluding Ramp, Propane & Trash

8' Chain Link Fence

X

X

UP

20' Easement per Doc. #2266139

20 Trailer Spaces

UP

95'

Terminal Office

UP

X

X

Address: 10017 Durand Ave. 467,118.1 s.f. 10.72 ac.

Parcel "A"

70'

X

8' Chain Link Fence

24'

X

Parcel "B"

45'

X

Proposed R/W

X

60'

X

12 Trailer Spaces (Phase 2)

11 Trailer Spaces (Phase 2)

X X

X

X

X

C.T.H. "H"

7 Trailer Spaces (Phase 2)

X

Man Gate

X

24'

Unplatted Lands

Asphalt Pad for Snow Melt

X

Unplatted Lands

X

Owner: BHR Properties, LLC.

X

81 Secured Parking Spaces

24'

X

X

20' Easement per Doc. #2266139

24'

Dual Sliding Gates

24'

24'

24'

24'

X

X

24'

10 Trailer Spaces

X

12' Side Yard

Existing Property Line

128 Employee Parking Spaces

X

X

X

Gate for Snow Removal

X

19 Trailer Spaces (Phase 2)

X

X

X

X

X

A

X

X

24' X

X

X

Man Gate

X

X

X

8' Chain Link Fence Dual Sliding Gates

24'

55 Employee Parking Spaces

X

Owner: M&M Investments of Union Grove, LLC. X

8' Chain Link Fence

Asphalt Pad for Snow Melt

Unplatted Lands

31 Maintenance Employee Parking Spaces

Owner: Tree of Life, LLC.

Asphalt Pad for Snow Melt

Owner: Wisconsin Electric

8' Chain Link Fence

Unplatted Lands

2 Trailer Spaces

Asphalt Pad for Snow Melt

16 Tractor/Equipment Parking Spaces

Existing Property Line

Proposed R/W North 350' of the NW 1/4 frontage per Doc. #1796372 - No access

Address: 10015 Durand Ave. 37,721.0 s.f. 0.87 ac.

X

Parcel "C"

Proposed R/W Right-In/Right-Out Curb Cut

Asphalt Pad for Snow Melt

Asphalt Pad for Snow Melt

X

20 Trailer Spaces

8' Chain Link Fence X

X

X

X

X

X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

Off-Site Wetland to Remain

Note: Displaying the potential proposed right-of-way and possible DOT roadway improvements hereon does not constitue agreement by the property owner or developer to dedicate any prop

X

X

X

X

X

X

X

X

X

X

X

20' Rear Yard

Full Access Curb Cut

X

Man Gate

X

8' Chain Link Fence

X

40' Ingress / Egress and public utility Easement per Doc. 2266140

X

20' Rear Yard

X

20 Trailer Spaces

Dayton Freight - Sturtevant WI

40' Ingress / Egress and Public Utility Easement per Doc. 2266140

Conceptual Site Layout Data April 5, 2018

Unplatted Lands

Unplatted Lands

Owner: Nelson

Lot 1 CSM #3002

Owner: Schaefer Trust

Owner: Village of Sturtevant

Existing Property Line

8' Chain Link Fence

Site Address, Parcel "A"

10017 Durand Avenue

Parcel ID, Parcel "A"

181-03-22-28-058-000

Site Address, Parcel "B"

10017 Durand Avenue

Parcel ID, Parcel "B"

181-03-22-28-054-000

Site Address, Parcel "C"

10015 Durand Avenue

Parcel ID, Parcel "C"

181-03-22-28-057-000

Zoning (Parcels "A," "B," and "C")

Industrial/Business Park District

Flood Insurance Rate Map (FIRM) Number Most Recent Effective Date of FIRM

55101C0208D May 2, 2012

Flood Zone

Zone X

X

Deciduous/Evergreen Trees Spaced 50' On Center

Proposed Right-of-Way Line

GRAPHIC SCALE

X

Continuous 4' Evergreen Hedge 0

30

60

120

Opening Day

Full-Build

Dock Doors Including Propane, Ramp & Trash Enclosure

132±

209±

Trailer Spaces (12'x55' Spaces)

134±

192±

0

28±

88±/44±

88±/44±

Employee Parking (9'x20' Spaces; 8'x20' Handicap Spaces)

146±

183±

Maintenance Employee Parking (9'x20' Spaces)

31±

31±

Secured Parking (9'x20' Spaces; 8'x20' Handicap Spaces)

81±

81±

Equipment/Tractor at Maintenance (12'x30' Spaces)

23±

23±

Dedicated Tractor Spaces (12'x55' Spaces) Tractor/Trailer Spaces (12'x55' Spaces)

1 inch = 60 feet

Proposed WisDOT Roadway Improvements

15'±

33'±

Varies (12'±)

24' Drive Lane

5.5'

SECTION A-A DETAIL Not to Scale DATE

DESCRIPTION

VILLAGE OF STURTEVANT, RACINE COUNTY, WISCONSIN

© COPYRIGHT 2015 RENIER CONSTRUCTION.

REVISIONS MARK

X

20 Trailer Spaces

X

17 Trailer Spaces

Date

CONCEPTUAL PLANNING DAYTON FREIGHT LINES, INC.

CONSTRUCTION

DURAND AVENUE FACILITY PREFERRED WETLAND IMPACT LAYOUT - FULL-BUILD

Job No.

April 5, 2018 Scale

2017-0055 Sheet

1" = 60'

1/1

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas