The applicant proposes to expand the existing Tulsa Whirlpool facility; currently a manufacturing facility.
The applicant proposes to expand the existing Tulsa Whirlpool facility; currently a manufacturing facility. The expansion would include the placement of fill material into approximately 2,123-lf of unnamed ephemeral streams which are tributaries to Bird Creek. Approximately 368 total cubic yards of clean fill would be placed into these waters. The filling would be conducted as part of the facilities’ foundation, parking, and stormwater system development. The filling would be completed with standard earth moving equipment (i.e., backhoe, bulldozer, trackhoe,
haul truck, and compactor).