PUBLIC NOTICE: The applicant has applied for a Department of the Army permit to discharge dredged or fill material into waters of the United States in association with construction of a headquarters expansion and related support amenities on a 64.3 acre parcel of land owned by Sargento Foods Inc.
PROJECT DESCRIPTION AND PURPOSE:The applicant has applied for a Department of the Army permit to discharge dredged or fill material into waters of the United States in association with construction of a headquarters expansion and related support amenities on a 64.3 acre parcel of land owned by Sargento Foods Inc.Support amenities include two new 3-story office buildings, an additional parking lot, re-location of Persnickety Place, and an additional stormwater pond.
Public Notice
APPLICANT:
Sargento Foods Inc.
REFER TO:
2010-2909-RJH
ISSUED: July 13, 2018
EXPIRES: August 13, 2018
SECTION: 404 - Clean Water Act
1. APPLICATION FOR PERMIT TO discharge dredged and fill material into 2.44 acres of
wetlands adjacent to the Mullet River for the purpose of expanding a commercial development
in the City of Plymouth, Sheboygan County, Wisconsin.
2. SPECIFIC INFORMATION
APPLICANT
Sargento Foods Inc.
1 Persnickety Place
Plymouth, Wisconsin 53073
AGENT
Stantec Consulting Services, Inc.
12075 Corporate Parkway Suite 200
Mequon, Wisconsin 53092-2649
PROJECT LOCATION: The project site is located in Section 16, Township 14 North, Range 21
East; Sheboygan County, Wisconsin. Latitude 43.771191, Longitude -87.997450.
DESCRIPTION OF PROJECT:
The applicant has applied for a Department of the Army permit to discharge dredged or fill
material into waters of the United States in association with construction of a headquarters
expansion and related support amenities on a 64.3 acre parcel of land owned by Sargento
Foods Inc. Support amenities include two new 3-story office buildings, an additional parking lot,
re-location of Persnickety Place, and an additional stormwater pond
The proposed project site was historically used as a sand and gravel borrow area and farmland.
Currently the project site consists of commercial buildings, parking lots, storm water ponds, and
wetland communities. Nearly all upland areas have been utilized for commercial expansion.
A Storm Water Management Plan, including the use of infiltration basins has been developed to
meet construction and post-construction storm water management requirements. To avoid
secondary wetland impacts, adequate separation would be provided between storm water
management areas, wetlands, and groundwater throughout the project site.
The directly affected wetlands include 1.86 acres of hardwood swamp, 0.11 acre fresh wet
meadow, and 0.47 acre of shrub- carr.
SURROUNDING LAND USE:
The project area is bordered on the north by agricultural field, to the east by a railroad and
residential development, to the west by County Highway C and agricultural field, and to the
south by commercial development and floodplain forest.
Regulatory Branch (2010-2909-RJH)
PROJECT ALTERNATIVES:
During project planning, the applicant identified and evaluated 2 on-site design alternatives, and
a No Build alternative. The following alternatives have been submitted:
Alternative 1:
This alternative was developed in 2013 as the original plan. Persnickety Place would be
relocated through wetlands and around the perimeter of the facilities. Additional office parking for
the new facility is proposed near the existing warehouse parking. Two 3-story office buildings
are proposed, each with a 20,000 square foot footprint. Stormwater areas are proposed within
the parking areas and between the parking and the perimeter roadway, with a possible
stormwater pond in the upland. Permanent wetland impacts total 4.44 acres with this alternative.
Alternative 2: (Applicants preferred Alternative)
Similar to Alternative 1, major project components are still proposed; the perimeter road would
be relocated, two new buildings would be constructed, new parking stalls would be created,
and a stormwater treatment facility would be constructed. This alternative proposes two 3-story
office buildings, each with an 18,000 square foot footprint. A stormwater area would be
constructed in an upland area in the southeast corner of the property. Approximately 0.1 acres
of temporary wetland impact would be needed to install and connect stormwater conveyance
infrastructure to the proposed stormwater pond in the southeast corner of the Property.
Permanent wetland impacts total 2.44 acres with this alternative.
No-Action Alternative:
Under the No-Action alternative considered by the applicant, the relocation of
Persnickety Place would not occur and expansion through the development of new
buildings at the facility would not occur. Also, additional parking for anticipated future
employees would not be built. This alternative would result in no wetland impacts.
MITIGATION:
To offset unavoidable adverse impact to jurisdictional wetlands, the applicant has proposed to
purchase wetland mitigation bank credits, if no bank credits are available then Sargento would
purchase credits through the Wisconsin In-Lieu Fee program.
Page 2 of 5
Regulatory Branch (2010-2909-RJH)
3. FEDERALLY-LISTED THREATENED OR ENDANGERED WILDLIFE OR PLANTS OR
THEIR CRITICAL HABITAT
None were identified by the applicant and are known to exist in the permit area. However,
Sheboygan County is within the known or historic range of the following Federally-listed
threatened (T) and endangered (E) species:
Species
Northern long-eared bat (T)
Habitat
Hibernates in caves and mines - swarming in
surrounding wooded areas in autumn. During
summer, roosts and forages in upland forests.
Pitcher's thistle (T)
Stabilized dunes, and blowout areas
This application is being coordinated with the U.S. Fish and Wildlife Service. Any comments it
may have concerning Federally-listed threatened or endangered wildlife or plants or their critical
habitat will be considered in our final assessment of the described work.
4. JURISDICTION
This application is being reviewed in accordance with the practices for documenting Corps
jurisdiction under Sections 9 & 10 of the Rivers and Harbors Act of 1899 and Section 404 of the
Clean Water Act identified in Regulatory Guidance Letter 08-02.
5. STATE SECTION 401 WATER QUALITY CERTIFICATION
WATER QUALITY CERTIFICATION. This Public Notice has been sent to the Wisconsin
Department of Natural Resources and is considered by the District Engineer to constitute valid
notification to that agency for Section 401 water quality certification. A permit would not be
granted until the Wisconsin Department of Natural Resources has issued or waived Section 401
certification.
6. HISTORICAL/ARCHAEOLOGICAL
The Corps will review information on known cultural resources and/or historic properties within
and adjacent to the project area. The Corps will also consider the potential effects of the project
on any properties that have yet to be identified. The results of this review and the Corps'
determination of effect will be coordinated with the State Historic Preservation Officer
independent of this public notice. Any adverse effects on historic properties will be resolved
prior to the Corps authorization, or approval, of the work in connection with this project.
7.
PUBLIC HEARING REQUESTS
Any person may request, in writing, within the comment period specified in this notice, that a
public hearing be held to consider this application. Requests for public hearings shall state, in
detail, the reasons for holding a public hearing. A request may be denied if substantive reasons
for holding a hearing are not provided or if there is otherwise no valid interest to be served.
Page 3 of 5
Regulatory Branch (2010-2909-RJH)
8. PUBLIC INTEREST REVIEW
The decision whether to issue a permit would be based on an evaluation of the probable impact,
including cumulative impacts, of the proposed activity on the public interest. That decision
would reflect the national concern for both protection and utilization of important resources. The
benefit which reasonably may be expected to accrue from the proposal must be balanced
against its reasonably foreseeable detriments. All factors which may be relevant to the proposal
would be considered, including the cumulative effects. Among those are conservation,
economics, aesthetics, general environmental concerns, wetlands, cultural values, fish and
wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and
accretion, recreation, water supply and conservation, water quality, energy needs, safety, food
and fiber production and, in general, the needs and welfare of the people. Environmental and
other documents would be available for review in the St. Paul District Office.
The Corps of Engineers is soliciting comments from the public; Federal, State, and local
agencies and officials; Indian tribes; and other interested parties in order to consider and
evaluate the impacts of this proposed activity. Any comments received would be considered by
the Corps of Engineers to determine whether to issue, modify, condition, or deny a permit for
this proposal. To make this decision, comments are used to assess impacts on endangered
species, historic properties, water quality, general environmental effects, and the other public
interest factors listed above. Comments are used in the preparation of an Environmental
Assessment and/or an Environmental Impact Statement pursuant to the National Environmental
Policy Act. Comments are also used to determine the need for a public hearing and to
determine the overall public interest of the proposed activity.
9.
COASTAL ZONE MANAGEMENT
The Wisconsin Coastal Management Program (WCMP) in the Department of Administration is
inviting public comment regarding this project. The WCMP may conduct a Federal consistency
review to verify that the project would comply with State policies in Wisconsin's coastal zone.
Further information may be obtained from the Federal Consistency Coordinator at: Wisconsin
Coastal Management Program, P.O. Box 7868, Madison, WI 53707-7868; (608) 267-7982.
Any comments on whether or not this proposed project complies with the State enforceable
policies should be received within 30 days by the Federal Consistency Coordinator.
10. REPLIES/COMMENTS
Interested parties are invited to submit to this office written facts, arguments, or objections within
30 days of the date of this notice. These statements should bear upon the suitability of the
location and the adequacy of the project and should, if appropriate, suggest any changes
believed to be desirable. Comments received may be forwarded to the applicant.
Page 4 of 5
Regulatory Branch (2010-2909-RJH)
Replies may be addressed to:
U.S. Army Corps of Engineers
Attn: Ryan Huber
211 North Broadway, Suite 221
Green Bay, Wisconsin 54303
Or, IF YOU HAVE QUESTIONS ABOUT THE PROJECT, call Ryan Huber at the Green Bay
office of the Corps, telephone number 651-290-5859.
Todd Vesperman
Chief, Northeast Section
Enclosures
Page 5 of 5
SARGENTO FOODS INC.
PERSNICKETY PLACE
PLYMOUTH, WI
SITE MASTER PLAN
SARGENTO FOODS INC.
PERSNICKETY PLACE
PLYMOUTH, WI
PROJECT:
OWNER:
Alternative 8
PRELIMINARY
SHEET DATES:
MAY 16, 2013
SEPTEMBER 27, 2013
SEPTEMBER 30, 2013
OCTOBER 4, 2013
OCTOBER 10, 2013
NOVEMBER 18, 2013
·
·
2012 c EXCEL ENGINEERING, INC.
·
·
·
JOB NUMBER:
1215220
SHEET