LOCK AND FLOODWALL STRUCTURE IN THE HOUMA NAVIGATION CANAL IN LAFOURCHE PARISH
NAME OF APPLICANT: Terrebonne Levee and Conservation District; c/o APTIM, 2503 Petroleum Drive, Houma, Louisiana 70363.
LOCATION OF WORK: Within the Terrebonne Basin, in the West- Central Louisiana Coastal hydrologic unit (HUC 08090302), located in the Houma Navigation Canal (HNC), approximately 4 miles southwest of Dulac, Louisiana, in Lafourche Parish.
CHARACTER OF WORK
: The applicant proposes to dredge an area, construct an
aggregate road for access, and construct a lock structure that provides 110 of clear
width and an 800 foot long lock chamber, floodgate with integral sluice gates, a closure
wall that consists of a pile-supported T-wall floodwall to connect this project to existing
adjacent levees, an operations area, maintenance building, boat ramp, boat shed, and
other appurtenant facilities to maintain and operate the structures. The existing
floodgate and floodwalls will be removed or incorporated into the proposed flood gate
and lock complex. A total of 21.4 acres of brackish marsh will be impacted by
construction of the lock structure. Approximately 1,383,000 cubic yards of material will
be dredged from the HNC and the proposed marina canal. All dredged material will be
deposited beneficially in 245 acres of open water in the nearby area, as shown in the
enclosed disposal plan. Approximately, 37,600 cubic yards of hauled-in dirt will be used
for the levee tie-in and as backfill for utilities, while approximately 236,000 cubic yards
of rip-rap and 2,400 cubic yards of concrete will be used for the levee tie-in and bank
line stabilization/scour protection. Approximately 19,500 cubic yards of limestone and
6,000 cubic yards of asphalt will be used for the access road.
According to the applicant, the project footprint has been minimized to the maximum extent practicable. The alignment and design have been altered such that wetland impacts were reduced from 130 acres to 21.4 acres. Other alignments evaluated resulted in additional wetland impacts.
JOINT PUBLIC NOTICE
July 23, 2018
United States Army Corps of Engineers
New Orleans District
Regulatory Branch
7400 Leake Avenue
New Orleans, Louisiana 70118
State of Louisiana
Department of Environmental Quality
Water Permits Division
Post Office Box 4313
Baton Rouge, Louisiana 70821-4313
(504) 862-2675
Project Manager
Jamie Crowe
Jamie.M.Crowe@usace.army.mil
Permit Application Number
MVN 2015-01590 CO
(225) 219-3225
Project Manager
Elizabeth Hill
WQC Application Number
WQC 170719-01
Interested parties are hereby notified that a permit application has been received by
the New Orleans District of the U.S. Army Corps of Engineers pursuant to:
[ X ] Section 10 of the Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC
403); and/or [X] Section 404 of the Clean Water Act (86 Stat. 816; 33 USC 1344).
Application has also been made to the Louisiana Department of Environmental
Quality, Office of Environmental Services, for a Water Quality Certification (WQC) in
accordance with statutory authority contained in LRS30:2047 A(3), and provisions of
Section 401 of the Clean Water Act (P.L.95-17).
LOCK AND FLOODWALL STRUCTURE IN THE HOUMA NAVIGATION CANAL IN
LAFOURCHE PARISH
NAME OF APPLICANT: Terrebonne Levee and Conservation District; c/o APTIM,
2503 Petroleum Drive, Houma, Louisiana 70363.
LOCATION OF WORK: Within the Terrebonne Basin, in the West- Central Louisiana
Coastal hydrologic unit (HUC 08090302), located in the Houma Navigation Canal
(HNC), approximately 4 miles southwest of Dulac, Louisiana, in Lafourche Parish.
CHARACTER OF WORK: The applicant proposes to dredge an area, construct an
aggregate road for access, and construct a lock structure that provides 110 of clear
width and an 800 foot long lock chamber, floodgate with integral sluice gates, a closure
wall that consists of a pile-supported T-wall floodwall to connect this project to existing
adjacent levees, an operations area, maintenance building, boat ramp, boat shed, and
other appurtenant facilities to maintain and operate the structures. The existing
floodgate and floodwalls will be removed or incorporated into the proposed flood gate
and lock complex. A total of 21.4 acres of brackish marsh will be impacted by
construction of the lock structure. Approximately 1,383,000 cubic yards of material will
be dredged from the HNC and the proposed marina canal. All dredged material will be
deposited beneficially in 245 acres of open water in the nearby area, as shown in the
enclosed disposal plan. Approximately, 37,600 cubic yards of hauled-in dirt will be used
for the levee tie-in and as backfill for utilities, while approximately 236,000 cubic yards
of rip-rap and 2,400 cubic yards of concrete will be used for the levee tie-in and bank
line stabilization/scour protection. Approximately 19,500 cubic yards of limestone and
6,000 cubic yards of asphalt will be used for the access road.
According to the applicant, the project footprint has been minimized to the
maximum extent practicable. The alignment and design have been altered such that
wetland impacts were reduced from 130 acres to 21.4 acres. Other alignments
evaluated resulted in additional wetland impacts.
The comment period for the Department of the Army Permit and the Louisiana
Department of Environmental Quality WQC will close 20 days from the date of this joint
public notice. Written comments, including suggestions for modifications or objections
to the proposed work, stating reasons thereof, are being solicited from anyone having
interest in this permit and/or this WQC request and must be mailed, so as to be
received before or by the last day of the comment period. Letters concerning the Corps
of Engineers permit application must reference the applicant's name and the Permit
Application Number, and be mailed to the Corps of Engineers at the address above,
ATTENTION: REGULATORY BRANCH. The application for this proposed project is on
file with the Louisiana Department of Environmental Quality and may be examined
weekdays between 8:00 a.m. and 4:30 p.m. Copies may be obtained upon payment of
costs of reproduction. Individuals or parties may request an extension of time in which
to comment on the proposed work by writing or e-mailing the Corps of Engineers
Project Manager listed above. Any request must be specific and substantively
supportive of the requested extension, and received by this office prior to the end of the
initial comment period. The Section Chief will review the request and the requestor will
be promptly notified of the decision to grant or deny the request. If granted, the time
extension will be continuous to the initial comment period and, inclusive of the initial
comment period, will not exceed a total of 30 calendar days. Letters concerning the
Water Quality Certification must reference the applicant's name and the WQC
Application number and be mailed to the Louisiana Department of Environmental
Quality at the address above.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the
probable impacts, including cumulative impacts of the proposed activity on the public
interest. That decision will reflect the national concern for both protection and utilization
of important resources. The benefit which reasonably may be expected to accrue from
the proposal must be balanced against its reasonably foreseeable detriments. All
factors which may be relevant to the proposal will be considered including the
cumulative effects thereof; among those are conservation, economics, aesthetics,
general environmental concerns, wetlands, historic properties, fish and wildlife values,
flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion,
recreation, water supply and conservation, water quality, energy needs, safety, food and
fiber production, mineral needs, considerations of property ownership and, in general,
the needs and welfare of the people.
The U.S. Army Corps of Engineers is soliciting comments from the public, federal,
state, and local agencies and officials, Indian Tribes, and other interested parties in
order to consider and evaluate the impacts of this proposed activity. Any comments
received will be considered by the U.S. Army Corps of Engineers to determine whether
to make, modify, condition, or deny a permit for this proposal. To make this decision,
comments are used to assess impacts on endangered species, historic properties,
water quality, general environmental effects, and other public interest factors listed
above. Comments are used in the preparation of an Environmental Assessment and/or
an Environmental Impact Statement pursuant to the National Environmental Policy Act.
Comments are also used to determine the need for a public hearing and to determine
the overall public interest of the proposed activity.
The New Orleans District is unaware of properties listed on the National Register of
Historic Places near the proposed work. The possibility exists that the proposed work
may damage or destroy presently unknown archeological, scientific, prehistorical,
historical sites, or data. Copies of this notice are being sent to the State Archeologist
and State Historic Preservation Officer.
Our initial finding is that the proposed work would not affect any species, nor affect
any habitat designated as critical to the survival and recovery of such species, listed as
endangered by the U.S. Department of Commerce.
The New Orleans District has determined that the proposed project is located in
waters known to be utilized by the west Indian manatee (Trichechus manatus) and
determined that the proposed activity is not likely to adversely affect the species,
provided the Standard Manatee Conditions for In-Water Activities are included in any
authorization from this office. This determination is based on the Standard Local
Operating Procedure for Endangered Species of Louisiana (SLOPES), dated October
22, 2014, between the U.S. Army Corps of Engineers and U.S. Fish and Wildlife
Service, Ecological Services Office.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of
the Magnuson-Stevens Fishery Conservation and Management Act. The applicant's
proposal would result in the destruction or alteration of 21.4 acres of EFH utilized by
various life stages of red drum and penaeid shrimp. Our initial determination is that the
proposed action would not have a substantial adverse impact on EFH or federally
managed fisheries in the Gulf of Mexico. Our final determination relative to project
impacts and the need for mitigation measures is subject to review by and coordination
with the National Marine Fisheries Service.
If the proposed work involves deposits of dredged or fill material into navigable
waters, the evaluation of the probable impacts will include the application of guidelines
established by the Administrator of the Environmental Protection Agency. Also, a
certification that the proposed activity will not violate applicable water quality standards
will be required from the Department of Environmental Quality, Office of Environmental
Services, before a permit is issued.
Any person may request, in writing, within the comment period specified in this
notice, that a public hearing be held to consider this application. Requests for public
hearings shall state, with particularity, the reasons for holding a public hearing. You are
requested to communicate the information contained in this notice to any other parties
whom you deem likely to have interest in the matter.
The applicant has certified that the proposed activity described in the application
complies with and will be conducted in a manner that is consistent with the Louisiana
Coastal Resources Program. The Department of the Army permit will not be issued
unless the applicant received approval or a waiver of the Coastal Use Permit by the
Department of Natural Resources.
You are requested to communicate the information contained in this notice to any
other parties whom you deem likely to have interest in the matter.
John M. Herman
Chief, Central Evaluation Section
Regulatory Branch
Enclosure
PROJECT LOCATION:
LAT. N 29° 19' 47.29"
LONG. W 90° 43' 46.27"
" FOR REVIEW ONLY " This document is not to be used for construction, bidding, conveyance or sales. Jeffery Pena, Lic# 29388
TERREBONNE LEVEE & CONSERVATION DISTRICT
HOUMA NAVIGATION CANAL LOCK COMPLEX
TERREBONNE PARISH, LA.
T20S, R17E, SECTS 16 & 21
VICINITY MAP
Date:
Drawn By:
June 2017
Scale:
Sheet No.:
PMC
Approved By:
1"=32,000'
01
File No.:
CDL
154607
Revision No.:
1
2
3
4
Revisions:
Date:
Notes:
08/01/2017
DNR Appl. Checklist Revs.
10/04/2017
DNR Requested Info.
10/26/2017
USACE & DNR Reqstd Info
01/30/2018
Disposal Areas
APTIM Environmental
& Infrastructure, Inc.
SHEET #
SHEET TITLE
SHEET #
SHEET TITLE
01
VICINITY MAP
25
UTILITIES POTABLE WATER AND SEWER SERVICE PLAN
02
INDEX SHEET
26
UTILITIES POTABLE WATER PLAN VIEW
03
OVERALL PLAN
27
UTILITIES POTABLE WATER PLAN VIEW
04
LOCK COMPLEX SITE PLAN
28
UTILITIES POTABLE WATER PLAN VIEW
EXISTING SITE PLAN
29
UTILITIES POTABLE WATER PLAN VIEW
05
LOCK COMPLEX PROFILE
30
UTILITIES POTABLE WATER AND SEWER SERVICE DETAILS
06
LEVEE TIE-IN PLAN VIEW
31
SCOUR PROTECTION PLAN VIEW
07
LEVEE TIE-IN TYPICAL TIE-IN PLAN AND PROFILE
32
SCOUR PROTECTION CROSS SECTIONS
08
LEVEE TIE-IN TYPICAL LEVEE CROSS SECTION
33
SCOUR PROTECTION CROSS SECTIONS
09
OPERATIONS CENTER PLAN VIEW
34
TYPICAL LOCK CHAMBER BRACED WALL PLAN LAYOUT
10
OPERATIONS CENTER TYPICAL EMBANKMENT CROSS SECTION
35
TYPICAL LOCK CHAMBER BRACED WALL SECTION
11
OPERATIONS CENTER BOAT LIFT PLAN AND PROFILE
36
GUIDE WALL DETAILS
12
OPERATIONS CENTER MAINTENANCE BUILDING ELEVATIONS
37
FLOODGATE JACKET PLAN AND SECTION
13
OPERATIONS CENTER BOAT LAUNCH PLAN AND PROFILE
38
FLOODGATE JACKET CHANNEL SIDE ELEVATION
14
OPERATIONS CENTER BOAT LAUNCH DETAILS
39
GUIDE WALL OVERALL PLAN
15
DREDGE PLAN PHASE 1
40
NOSE PIER DETAILS
16
DREDGE PLAN PHASE 2
41
DOLPHIN PLAN AND ELEVATION FLOOD SIDE
17
DREDGE PLAN CROSS-SECTIONS
42
DOLPHIN PLAN AND ELEVATION PROTECTED SIDE
18
DREDGE PLAN CROSS-SECTIONS
43
MARINA ACCESS CANAL
19
DREDGE PLAN CROSS-SECTIONS
44
DREDGE DISPOSAL AREA PLAN
20
DREDGE PLAN CROSS-SECTIONS
45
DREDGE DISPOSAL AREA SECTIONS
21
FOUR POINT ROAD OVERALL PLAN
46
FLOODGATE PLAN @ EL. 5.0
22
FOUR POINT ROAD TYPICAL SECTIONS
47
FLOODGATE ELEVATION VIEW
23
G-1 ACCESS ROAD OVERALL PLAN
48
GENERAL NOTES
24
G-1 ACCESS ROAD DETAILS
49
OPERATION PLAN
04 A
" FOR REVIEW ONLY " This document is not to be used for construction, bidding, conveyance or sales. Jeffery Pena, Lic# 29388
TERREBONNE LEVEE & CONSERVATION DISTRICT
HOUMA NAVIGATION CANAL LOCK COMPLEX
TERREBONNE PARISH, LA.
T20S, R17E, SECTS 16 & 21
INDEX SHEET
Date:
Drawn By:
June 2017
Scale:
Sheet No.:
PMC
Approved By:
N.T.S.
02
File No.:
CDL
154607
Revision No.:
1
2
3
4
Revisions:
Date:
Notes:
08/01/2017
DNR Appl. Checklist Revs.
10/04/2017
DNR Requested Info.
10/26/2017
USACE & DNR Reqstd Info
01/30/2018
Disposal Areas
APTIM Environmental
& Infrastructure, Inc.
372.91'
651.09'
3380.63'
4757.89'
" FOR PERMITTING ONLY " This document is not to be used for construction, bidding, conveyance or sales. Jeffery Pena, Lic# 29388
TERREBONNE LEVEE & CONSERVATION DISTRICT
HOUMA NAVIGATION CANAL LOCK COMPLEX
TERREBONNE PARISH, LA.
T20S, R17E, SECTS 16 & 21
OVERALL PLAN
Date:
Drawn By:
June 2017
Scale:
Sheet No.:
LDE
Approved By:
1"=800'
3
File No.:
CDL
154607
Revision No.:
1
2
3
4
Revisions:
Date:
Notes:
08/01/2017
DNR Appl. Checklist Revs.
10/04/2017
DNR Requested Info.
10/26/2017
USACE and DNR Rqstd Info.
Disposal Areas
01/30/2018
APTIM Environmental
& Infrastructure, Inc.
SITE PLAN
SCALE: 1" = 300'
" FOR REVIEW ONLY " This document is not to be used for construction, bidding, conveyance or sales. Jeffery Pena, Lic# 29388
TERREBONNE LEVEE & CONSERVATION DISTRICT
HOUMA NAVIGATION CANAL LOCK COMPLEX
TERREBONNE PARISH, LA.
T20S, R17E, SECTS 16 & 21
LOCK COMPLEX
SITE PLAN
Date:
Drawn By:
June 2017
Scale:
Sheet No.:
PMC
Approved By:
1" = 300'
04
File No.:
CDL
154607
Revision No.:
1
2
3
4
Revisions:
Date:
Notes:
08/01/2017
DNR Appl. Checklist Revs.
10/04/2017
DNR Requested Info.
10/26/2017
USACE & DNR Reqstd Info
01/30/2018
Disposal Areas
APTIM Environmental
& Infrastructure, Inc.
SITE PLAN
SCALE: 1" = 300'
" FOR REVIEW ONLY " This document is not to be used for construction, bidding, conveyance or sales. Jeffery Pena, Lic# 29388
TERREBONNE LEVEE & CONSERVATION DISTRICT
HOUMA NAVIGATION CANAL LOCK COMPLEX
TERREBONNE PARISH, LA.
T20S, R17E, SECTS 16 & 21
EXISTING SITE PLAN
Date:
Drawn By:
June 2017
Scale:
Sheet No.:
PMC
Approved By:
1" = 300'
04 A
File No.:
CDL
154607
Revision No.:
1
2
3
4
Revisions:
Date:
Notes:
08/01/2017
DNR Appl. Checklist Revs.
10/04/2017
DNR Requested Info.
10/26/2017
USACE & DNR Reqstd Info
01/30/2018
Disposal Areas
APTIM Environmental
& Infrastructure, Inc.
FLOODWALL PROFILE - SECTION D
D
31 05
" FOR REVIEW ONLY " This document is not to be used for construction, bidding, conveyance or sales. Jeffery Pena, Lic# 29388
TERREBONNE LEVEE & CONSERVATION DISTRICT
HOUMA NAVIGATION CANAL LOCK COMPLEX
TERREBONNE PARISH, LA.
T20S, R17E, SECTS 16 & 21
LOCK COMPLEX PROFILE
Date:
Drawn By:
June 2017
Scale:
(H) 1"=160'
(V) 1"=32'
Sheet No.:
PMC
Approved By:
05
File No.:
CDL
154607
Revision No.:
1
2
3
4
Revisions:
Date:
Notes:
08/01/2017
DNR Appl. Checklist Revs.
10/04/2017
DNR Requested Info.
10/26/2017
USACE & DNR Reqstd Info
01/30/2018
Disposal Areas
APTIM Environmental
& Infrastructure, Inc.
EXISTING REACH F LEVEE
PROPOSED OPERATIONS AREA
PROPOSED OPERATIONS AREA
ACCESS ROAD
PROPOSED
REACH F
TIE-IN
13.5'
24.0'
24.0'
1:3
1:20
66.0'
PROPOSED
REACH
G TIE-IN
1:3
1:3
40.0'
1:3
1:20
1:3
66.0'
1:3
EL. -10.0
EL. -10.0
1:3
PROPOSED
REACH F
ACCESS
13.5'
1:3
1:3
40.0'
EXISTING
REACH G LEVEE
1:3
PROPOSED
REACH G
ACCESS
A
06 08
NOTE:
DETAILS FOR REACH F ACCESS
TYPICAL TO REACH G ACCESS
" FOR REVIEW ONLY " This document is not to be used for construction, bidding, conveyance or sales. Jeffery Pena, Lic# 29388
TERREBONNE LEVEE & CONSERVATION DISTRICT
HOUMA NAVIGATION CANAL LOCK COMPLEX
TERREBONNE PARISH, LA.
T20S, R17E, SECTS 16 & 21
LEVEE TIE-IN
PLAN VIEW
Date:
Drawn By:
June 2017
Scale:
Sheet No.:
PMC
Approved By:
1"=200'
06
File No.:
CDL
154607
Revision No.:
1
2
3
4
Revisions:
Date:
Notes:
08/01/2017
DNR Appl. Checklist Revs.
10/04/2017
DNR Requested Info.
USACE and DNR Rqstd Info.
10/26/2017
Disposal Areas
01/30/2018
APTIM Environmental
& Infrastructure, Inc.
LEVEE TOE
LEVEE TOE
BERM EL. +4.0
BERM EL. +4.0
EXISTING LEVEE
PROPOSED LEVEE TIE-IN
PROPOSED RIP-RAP
BERM EL. +7.0
BERM EL. +7.0
1:3
BERM EL. +7.0'
219.0'
5.0'
CROWN OF LEVEE EL. +15.0
CROWN OF LEVEE EL. +12.0
24.0'
CROWN OF LEVEE EL. +11.0
5.0'
CROWN OF LEVEE EL. +12.0
10.0'
CROWN OF LEVEE EL. +11.0
5.0'
BRACED FLOOD WALL
SHEET PILE
CROWN OF LEVEE EL. +15.0
1:20
EXISTING
LEVEE
66.0'
BERM EL. +7.0
PROPOSED
LEVEE TIE-IN
TYPICAL REACH G & F TIE-IN PLAN VIEW
1:3
12.0'
SCALE: 1" = 60'
BERM EL. +4.0
BERM EL. +4.0
LEVEE TOE
LEVEE TOE
30.0'
20.0'
30.0'
30.0'
60.0'
30.0'
EL. + 23.5
60.0'
NEW SHEET
PILE WALL
TRANSITION
EXISTING
LEVEE
1
AVG. EL. + 11.0
20
1
20
T-WALL
BRACED FLOOD WALL
EL. + 19.0
TOP OF LEVEE EL. +15.0
EL. + 12.0
1:3
4
1:3
1:3
1
EL. + 7.0
1:20
BERM
EL. + 4.0
TYPICAL REACH G & F TIE-IN PROFILE VIEW
SCALE: HORIZ. 1" = 60'
VERT. 1" = 15'
1:3
NATURAL GROUND
" FOR REVIEW ONLY " This document is not to be used for construction, bidding, conveyance or sales. Jeffery Pena, Lic# 29388
TERREBONNE LEVEE & CONSERVATION DISTRICT
HOUMA NAVIGATION CANAL LOCK COMPLEX
TERREBONNE PARISH, LA.
T20S, R17E, SECTS 16 & 21
LEVEE TIE-IN
TYPICAL PLAN & PROFILE
Date:
Drawn By:
June 2017
Scale:
Sheet No.:
PMC
Approved By:
VARIES
07
File No.:
CDL
154607
Revision No.:
1
2
3
4
Revisions:
Date:
Notes:
DNR Appl. Checklist Revs.
08/01/2017
DNR Requested Info.
10/04/2017
USACE and DNR Rqstd Info.
10/26/2017
Disposal Areas
01/30/2018
APTIM Environmental
& Infrastructure, Inc.
FLOOD SIDE
PROTECTED SIDE
10.0'
66.0'
12.0'
24.0'
1
1
ELEV. = +4.0
ELEV. = +15.0
3
3
1
ELEV. = +7.0
20
20
BERM
BERM
1
3
AVG. ELEV. = +0.55'
1
NATURAL GROUND
REACH F & G
Reach F and G Levee Access
20
20
DISTANCE VARIES
10
0
1
-10
0
3
ELEV. = -10.0
-10
40.0'
-20
-30
10
-60
-40
-20
-20
0
SECTION
20
40
60
-30
A
06 08
SCALE: 1" = 40'-0"
" FOR PERMITTING ONLY " This document is not to be used for construction, bidding, conveyance or sales. Jeffery Pena, Lic# 29388
TERREBONNE LEVEE & CONSERVATION DISTRICT
HOUMA NAVIGATION CANAL LOCK COMPLEX
TERREBONNE PARISH, LA.
T20S, R17E, SECTS 16 & 21
LEVEE TIE-IN
TYPICAL CROSS-SECTION
Date:
Drawn By:
June 2017
Scale:
Horiz. 1" = 60'
Vert. 1" = 15'
Sheet No.:
PMC
Approved By:
08
File No.:
CDL
154607
Revision No.:
1
2
3
4
Revisions:
Date:
Notes:
08/01/2017
DNR Appl. Checklist Revs.
10/04/2017
DNR Requested Info.
10/26/2017
USACE and DNR Rqstd Info.
01/30/2018
Disposal Areas
APTIM Environmental
& Infrastructure, Inc.
BAYOU
PLAT
500.0'
24.0'
50' x 45' 2 BAY BOAT LIFT
ACCESS
BRIDGE
A
STEEL TIE ROD
MARSH TO BE
DREDGED
STEEL SHEETPILE
BULKHEAD
09 10
3:1
BOAT
RAMP /
LAUNCH
SE
PROPO
FENCE
341.4'
D TIE-IN
LIMESTONE SURFACE
(APRROX. 2.80 AC.)
LEVEE
3:1
1
3:
304.5'
3:1
3:1
PROPOSED
RIPRAP
A
09 10
GATE
24
.0
'
ESS RO
AD
E
.0
1
EXISTI
N
MARSH
24
3:
G ACC
NG LEV
E
EXISTI
3:1
245.0'
STEEL SHEETPILE
ANCHOR (AZ 36-700N)
MAINTENANCE
BUILDING
GATE
EL. +8.00
-14% GRADE
3:1
'
24
.0
'
3:
RO
AD
1
PR
OP
O
SE
D
AC
CE
SS
PROPOSED
RIPRAP
" FOR REVIEW ONLY " This document is not to be used for construction, bidding, conveyance or sales. Jeffery Pena, Lic# 29388
TERREBONNE LEVEE & CONSERVATION DISTRICT
HOUMA NAVIGATION CANAL LOCK COMPLEX
TERREBONNE PARISH, LA.
T20S, R17E, SECTS 16 & 21
OPERATIONS CENTER
PLAN VIEW
Date:
Drawn By:
June 2017
Scale:
Sheet No.:
PMC
Approved By:
1"=100'
09
File No.:
CDL
154607
Revision No.:
1
2
3
4
Revisions:
Date:
Notes:
08/01/2017
DNR Appl. Checklist Revs.
10/04/2017
DNR Requested Info.
USACE and DNR Rqstd Info.
10/26/2017
Disposal Areas
01/30/2018
APTIM Environmental
& Infrastructure, Inc.
HNC SIDE
LAND SIDE
60.0' MININUM
3.0'
±135'
SECTION
A
09 10
TYPICAL CROSS-SECTION OPERATIONS AREA
" FOR REVIEW ONLY " This document is not to be used for construction, bidding, conveyance or sales. Jeffery Pena, Lic# 29388
TERREBONNE LEVEE & CONSERVATION DISTRICT
HOUMA NAVIGATION CANAL LOCK COMPLEX
TERREBONNE PARISH, LA.
T20S, R17E, SECTS 16 & 21
OPERATIONS CENTER TYPICAL
EMBANKMENT & BULKHEAD
CROSS SECTION
Date:
Drawn By:
June 2017
Scale:
(H) 1" = 15-0"'
(V) 1" = 2'-9"
Sheet No.:
PMC
Approved By:
10
File No.:
CDL
MHW = EL. +3.0'
MLW = EL. 0.0'
154607
Revision No.:
1
2
3
4
Revisions:
Date:
Notes:
08/01/2017
DNR Appl. Checklist Revs.
10/04/2017
DNR Requested Info.
10/26/2017
USACE & DNR Reqstd Info
01/30/2018
Disposal Areas
APTIM Environmental
& Infrastructure, Inc.
12"
3"
PROFILE VIEW
PLAN VIEW
SCALE: 1" = 15'
SCALE: 1" = 15'
" FOR REVIEW ONLY " This document is not to be used for construction, bidding, conveyance or sales. Jeffery Pena, Lic# 29388
TERREBONNE LEVEE & CONSERVATION DISTRICT
HOUMA NAVIGATION CANAL LOCK COMPLEX
TERREBONNE PARISH, LA.
T20S, R17E, SECTS 16 & 21
OPERATIONS CENTER BOAT LIFT
PLAN AND PROFILE
Date:
Drawn By:
June 2017
Scale:
Sheet No.:
PMC
Approved By:
1" = 15'
11
File No.:
CDL
154607
Revision No.:
1
2
3
4
Revisions:
Date:
Notes:
08/01/2017
DNR Appl. Checklist Revs.
10/04/2017
DNR Requested Info.
10/26/2017
USACE & DNR Reqstd Info
01/30/2018
Disposal Areas
APTIM Environmental
& Infrastructure, Inc.
1
12
12
1
SIDE ELEVATION
SCALE: 1" = 12'
FRONT ELEVATION
SCALE: 1" = 12'
" FOR REVIEW ONLY " This document is not to be used for construction, bidding, conveyance or sales. Jeffery Pena, Lic# 29388
TERREBONNE LEVEE & CONSERVATION DISTRICT
HOUMA NAVIGATION CANAL LOCK COMPLEX
TERREBONNE PARISH, LA.
T20S, R17E, SECTS 16 & 21
OPERATIONS CENTER MAINTENANCE
BUILDING ELEVATIONS
Date:
Drawn By:
June 2017
Scale:
Sheet No.:
PMC
Approved By:
1" = 12'
12
File No.:
CDL
154607
Revision No.:
1
2
3
4
Revisions:
Date:
Notes:
08/01/2017
DNR Appl. Checklist Revs.
10/04/2017
DNR Requested Info.
10/26/2017
USACE & DNR Reqstd Info
01/30/2018
Disposal Areas
APTIM Environmental
& Infrastructure, Inc.
BOAT LAUNCH RAMP - PLAN VIEW
SCALE: 1" = 15'
BOAT LAUNCH RAMP - PROFILE VIEW
SCALE: 1" = 15'
" FOR REVIEW ONLY " This document is not to be used for construction, bidding, conveyance or sales. Jeffery Pena, Lic# 29388
TERREBONNE LEVEE & CONSERVATION DISTRICT
HOUMA NAVIGATION CANAL LOCK COMPLEX
TERREBONNE PARISH, LA.
T20S, R17E, SECTS 16 & 21
OPERATIONS CENTER BOAT LAUNCH
PLAN AND PROFILE
Date:
Drawn By:
June 2017
Scale:
Sheet No.:
PMC
Approved By:
1" = 15'
13
File No.:
CDL
154607
Revision No.:
1
2
3
4
Revisions:
Date:
Notes:
08/01/2017
DNR Appl. Checklist Revs.
10/04/2017
DNR Requested Info.
10/26/2017
USACE & DNR Reqstd Info
01/30/2018
Disposal Areas
APTIM Environmental
& Infrastructure, Inc.
FLOATING PIER - ELEVATION
SCALE: 1" = 15'
TYPICAL RAMP SECTION
V-GROOVE DETAIL
SCALE: 1" = 5'
BOARDING FLOATING SYSTEM
SCALE: N.T.S.
SCALE: 1" = 10'
TYPICAL RAMP SURFACE DETAILS
SCALE: 1" = 10'
" FOR REVIEW ONLY " This document is not to be used for construction, bidding, conveyance or sales. Jeffery Pena, Lic# 29388
TERREBONNE LEVEE & CONSERVATION DISTRICT
HOUMA NAVIGATION CANAL LOCK COMPLEX
TERREBONNE PARISH, LA.
T20S, R17E, SECTS 16 & 21
OPERATIONS CENTER
BOAT LAUNCH DETAILS
Date:
Drawn By:
June 2017
Scale:
Sheet No.:
PMC
Approved By:
VARIES
14
File No.:
CDL
154607
Revision No.:
1
2
3
4
Revisions:
Date:
Notes:
08/01/2017
DNR Appl. Checklist Revs.
10/04/2017
DNR Requested Info.
10/26/2017
USACE & DNR Reqstd Info
01/30/2018
Disposal Areas
APTIM Environmental
& Infrastructure, Inc.
PROPOSED R.O.W.
PROPOSED
DREDGING LIMITS
PROPOSED
DREDGING LIMITS
PROPOSED
DREDGING LIMITS
(SEE SHEET 19 FOR SECTIONS)
(SEE SHEET 18 FOR SECTIONS)
(SEE SHEET 17 FOR SECTIONS)
LEGEND:
EL. -8.0
EL. -18.0
EL. -26.0
" FOR REVIEW ONLY " This document is not to be used for construction, bidding, conveyance or sales. Jeffery Pena, Lic# 29388
TERREBONNE LEVEE & CONSERVATION DISTRICT
HOUMA NAVIGATION CANAL LOCK COMPLEX
TERREBONNE PARISH, LA.
T20S, R17E, SECTS 16 & 21
DREDGE PLAN
OVERALL PLAN
Date:
Drawn By:
June 2017
Scale:
Sheet No.:
LDE
Approved By:
1"=900'
15
File No.:
CDL
154607
Revision No.:
1
2
3
4
Revisions:
Date:
Notes:
08/01/2017
DNR Appl. Checklist Revs.
10/04/2017
DNR Requested Info.
10/26/2017
USACE & DNR Rqstd Info.
01/30/2018
Disposal Areas
APTIM Environmental
& Infrastructure, Inc.
1:3
1:50
1:3
1:3
EL. 0.0
1:3
1:3
EL. -8.0
EL. -8.0
EL. -18.0
EL. -18.0
EL. -26.0
1:3
1:3
1:3
1:3
EL. -8.0
EL. -18.0
EL. -26.0
1:3
1:3
EL. -40.0
PHASE 2 DREDGING TO EL. -40.0
TO ALLOW FOR INSTALLATION OF
THE FLOAT-IN INLAND SIDE
SECTOR GATE
1:3
1:3
1:3
EL. -26.0
1:3
1:3
1:3
1:3
1:3
EL. -8.0
EL. -18.0
1:3
EL. -8.0
EL. -18.0
1:3
1:3
EL. -26.0
1:3
1:3
EL. 0.0
1:3
DREDGING
LIMITS
EL. 0.0
(SEE SHEET 20 FOR SECTION)
EL. -26.0
1:3
LEGEND:
PHASE I EL. -8.0
LEVEE
TIE-IN
EL. -26.0
EL. 0.0
(SEE SHEET 20 FOR SECTION)
PHASE I EL. -18.0
PHASE I EL. -26.0
DREDGING
LIMITS
PHASE II EL. -26.0
PHASE II EL. -40.0
1:4
" FOR REVIEW ONLY " This document is not to be used for construction, bidding, conveyance or sales. Jeffery Pena, Lic# 29388
TERREBONNE LEVEE & CONSERVATION DISTRICT
HOUMA NAVIGATION CANAL LOCK COMPLEX
TERREBONNE PARISH, LA.
T20S, R17E, SECTS 16 & 21
PROPOSED LOCK CHAMBER
DREDGE PLAN
Date:
Drawn By:
June 2017
Scale:
Sheet No.:
LDE
Approved By:
1"=300'
16
File No.:
CDL
154607
Revision No.:
1
2
3
4
Revisions:
Date:
Notes:
08/01/2017
DNR Appl. Checklist Revs.
10/04/2017
DNR Requested Info.
10/26/2017
USACE & DNR Rqstd Info.
01/30/2018
Disposal Areas
APTIM Environmental
& Infrastructure, Inc.
404.07'
348.30'
225.76'
MHW = EL. +3.0'
MLW = EL. 0.0'
" FOR REVIEW ONLY " This document is not to be used for construction, bidding, conveyance or sales. Jeffery Pena, Lic# 29388
TERREBONNE LEVEE & CONSERVATION DISTRICT
HOUMA NAVIGATION CANAL LOCK COMPLEX
TERREBONNE PARISH, LA.
T20S, R17E, SECTS 16 & 21
DREDGE PLAN
CROSS SECTIONS
Date:
Drawn By:
June 2017
Scale:
(H) 1"=250'
(V) 1"=50'
Sheet No.:
LDE
Approved By:
17
File No.:
CDL
154607
Revision No.:
1
2
3
4
Revisions:
Date:
Notes:
08/01/2017
DNR Appl. Checklist Revs.
10/04/2017
DNR Requested Info.
10/26/2017
USACE & DNR Rqstd Info.
01/30/2018
Disposal Areas
APTIM Environmental
& Infrastructure, Inc.
216.54'
399.32'
77.34'
531.88'
408.48'
MHW = EL. +3.0'
MLW = EL. 0.0'
" FOR REVIEW ONLY " This document is not to be used for construction, bidding, conveyance or sales. Jeffery Pena, Lic# 29388
TERREBONNE LEVEE & CONSERVATION DISTRICT
HOUMA NAVIGATION CANAL LOCK COMPLEX
TERREBONNE PARISH, LA.
T20S, R17E, SECTS 16 & 21
DREDGE PLAN
CROSS SECTIONS
Date:
Drawn By:
June 2017
Scale:
(H) 1"=250'
(V) 1"=50'
Sheet No.:
LDE
Approved By:
18
File No.:
CDL
154607
Revision No.:
1
2
3
4
Revisions:
Date:
Notes:
08/01/2017
DNR Appl. Checklist Revs.
10/04/2017
DNR Requested Info.
10/26/2017
USACE & DNR Rqstd Info.
01/30/2018
Disposal Areas
APTIM Environmental
& Infrastructure, Inc.
139.80'
194.40'
313.02'
MHW = EL. +3.0'
MLW = EL. 0.0'
" FOR REVIEW ONLY " This document is not to be used for construction, bidding, conveyance or sales. Jeffery Pena, Lic# 29388
TERREBONNE LEVEE & CONSERVATION DISTRICT
HOUMA NAVIGATION CANAL LOCK COMPLEX
TERREBONNE PARISH, LA.
T20S, R17E, SECTS 16 & 21
DREDGE PLAN
CROSS SECTIONS
Date:
Drawn By:
June 2017
Scale:
(H) 1"=250'
(V) 1"=50'
Sheet No.:
LDE
Approved By:
19
File No.:
CDL
154607
Revision No.:
1
2
3
4
Revisions:
Date:
Notes:
08/01/2017
DNR Appl. Checklist Revs.
10/04/2017
DNR Requested Info.
10/26/2017
USACE & DNR Rqstd Info.
01/30/2018
Disposal Areas
APTIM Environmental
& Infrastructure, Inc.
273.00'
489.88'
423.96'
114.16'
494.98'
107.50'
MHW = EL. +3.0'
MLW = EL. 0.0'
408.48'
" FOR REVIEW ONLY " This document is not to be used for construction, bidding, conveyance or sales. Jeffery Pena, Lic# 29388
TERREBONNE LEVEE & CONSERVATION DISTRICT
HOUMA NAVIGATION CANAL LOCK COMPLEX
TERREBONNE PARISH, LA.
T20S, R17E, SECTS 16 & 21
DREDGE PLAN
CROSS SECTIONS
Date:
Drawn By:
June 2017
Scale:
(H) 1"=250'
(V) 1"=50'
Sheet No.:
LDE
Approved By:
20
File No.:
CDL
154607
Revision No.:
1
2
3
4
Revisions:
Date:
Notes:
08/01/2017
DNR Appl. Checklist Revs.
10/04/2017
DNR Requested Info.
10/26/2017
USACE & DNR Rqstd Info.
01/30/2018
Disposal Areas
APTIM Environmental
& Infrastructure, Inc.
NOTE:
EXISTING FOUR POINT ROAD TO BE OVERLAID WITH 2.5" ASPHALT
4
1
2
3
TYPICAL SECTION
(N.T.S.)
EXISTING ASPHALT ROAD
LEGEND
1.
1.5" SUPERPAVE ASPHALTIC CONCRETE (WEARING COURSE, PG64-22)
2.
1" BINDER
3.
COLD PLANE REMOVAL OF EXISTING ASPHALT PAVEMENT 1" IN DEPTH
4.
EXISTING ASPHALTIC CONCRETE SURFACE TO REMAIN
5.
EXISTING BASE COURSE TO REMAIN & PATCH AS DIRECTED BY ENGINEER (SEE DETAIL THIS SHEET)
SECTION A-A
PATCHING DETAIL
(NTS)
TYPICAL DRIVE TURNOUT
" FOR PERMITTING ONLY " This document is not to be used for construction, bidding, conveyance or sales. Jeffery Pena, Lic# 29388
TERREBONNE LEVEE & CONSERVATION DISTRICT
HOUMA NAVIGATION CANAL LOCK COMPLEX
TERREBONNE PARISH, LA.
T20S, R17E, SECTS 16 & 21
FOUR POINT ROAD
TYPICAL SECTIONS
Date:
Drawn By:
June 2017
Scale:
Sheet No.:
PMC
Approved By:
N.T.S.
22
File No.:
CDL
(EXISTING)
154607
Revision No.:
1
2
3
4
Revisions:
Date:
Notes:
08/01/2017
DNR Appl. Checklist Revs.
10/04/2017
DNR Requested Info.
10/26/2017
USACE & DNR Rqstd Info.
01/30/2018
Disposal Areas
APTIM Environmental
& Infrastructure, Inc.
END G1 AGGREGATE
ACCESS ROAD
N: 305882.42
E: 3478591.83
LAT. 29° 20' 22.6"
LONG. 90° 42' 45.6"
BEGIN G1 AGGREGATE
ACCESS ROAD
N: 302678.97
E: 3474036.95
LAT. 29° 19' 51.2"
LONG. 90° 43' 37.3"
" FOR REVIEW ONLY " This document is not to be used for construction, bidding, conveyance or sales. Jeffery Pena, Lic# 29388
TERREBONNE LEVEE & CONSERVATION DISTRICT
HOUMA NAVIGATION CANAL LOCK COMPLEX
TERREBONNE PARISH, LA.
T20S, R17E, SECTS 16 & 21
G-1 ACCESS ROAD
OVERALL PLAN
Date:
Drawn By:
June 2017
Scale:
Sheet No.:
PMC
Approved By:
1"=600'
23
File No.:
CDL
154607
Revision No.:
1
2
3
4
Revisions:
Date:
Notes:
08/01/2017
DNR Appl. Checklist Revs.
10/04/2017
DNR Requested Info.
10/26/2017
USACE & DNR Rqstd Info.
01/30/2018
Disposal Areas
APTIM Environmental
& Infrastructure, Inc.
TYPICAL SECTION
EXISTING G-1 ACCESS ROAD WITH PROPOSED 12" LIMESTONE OVERLAY
(N.T.S.)
" FOR REVIEW ONLY " This document is not to be used for construction, bidding, conveyance or sales. Jeffery Pena, Lic# 29388
TERREBONNE LEVEE & CONSERVATION DISTRICT
HOUMA NAVIGATION CANAL LOCK COMPLEX
TERREBONNE PARISH, LA.
T20S, R17E, SECTS 16 & 21
G-1 ACCESS ROAD
DETAILS
Date:
Drawn By:
June 2017
Scale:
Sheet No.:
PMC
Approved By:
N.T.S.
24
File No.:
CDL
154607
Revision No.:
1
2
3
4
Revisions:
Date:
Notes:
08/01/2017
DNR Appl. Checklist Revs.
10/04/2017
DNR Requested Info.
10/26/2017
USACE & DNR Rqstd Info.
01/30/2018
Disposal Areas
APTIM Environmental
& Infrastructure, Inc.
MATCHLINE (SHEET 26)
NOTE:
ALL UTILITIES WILL BE CONSTRUCTED
WITHIN THE EXISTING RIGHT OF WAY
" FOR PERMITTING ONLY " This document is not to be used for construction, bidding, conveyance or sales. Jeffery Pena, Lic# 29388
TERREBONNE LEVEE & CONSERVATION DISTRICT
HOUMA NAVIGATION CANAL LOCK COMPLEX
TERREBONNE PARISH, LA.
T20S, R17E, SECTS 16 & 21
UTILITIES
POTABLE WATER AND
SEWER SERVICE PLAN
Date:
Drawn By:
June 2017
Scale:
Sheet No.:
PMC
Approved By:
1"=150'
25
File No.:
CDL
154607
Revision No.:
1
2
3
4
Revisions:
Date:
Notes:
08/01/2017
DNR Appl. Checklist Revs.
10/04/2017
DNR Requested Info.
10/26/2017
USACE & DNR Rqstd Info.
01/30/2018
Disposal Areas
APTIM Environmental
& Infrastructure, Inc.
MATCHLINE (SHEET 27)
MATCHLINE (SHEET 25)
NOTE:
ALL UTILITIES WILL BE CONSTRUCTED
WITHIN THE EXISTING RIGHT OF WAY
" FOR PERMITTING ONLY " This document is not to be used for construction, bidding, conveyance or sales. Jeffery Pena, Lic# 29388
TERREBONNE LEVEE & CONSERVATION DISTRICT
HOUMA NAVIGATION CANAL LOCK COMPLEX
TERREBONNE PARISH, LA.
T20S, R17E, SECTS 16 & 21
UTILITIES
POTABLE WATER PLAN VIEW
Date:
Drawn By:
June 2017
Scale:
Sheet No.:
PMC
Approved By:
1"=150'
26
File No.:
CDL
154607
Revision No.:
1
2
3
4
Revisions:
Date:
Notes:
08/01/2017
DNR Appl. Checklist Revs.
10/04/2017
DNR Requested Info.
10/26/2017
USACE & DNR Rqstd Info.
01/30/2018
Disposal Areas
APTIM Environmental
& Infrastructure, Inc.
E
IN
HL
TC
MA
(S
MATCHLINE (SHEET 26)
)
28
ET
HE
NOTE:
ALL UTILITIES WILL BE CONSTRUCTED
WITHIN THE EXISTING RIGHT OF WAY
" FOR PERMITTING ONLY " This document is not to be used for construction, bidding, conveyance or sales. Jeffery Pena, Lic# 29388
TERREBONNE LEVEE & CONSERVATION DISTRICT
HOUMA NAVIGATION CANAL LOCK COMPLEX
TERREBONNE PARISH, LA.
T20S, R17E, SECTS 16 & 21
UTILITIES
POTABLE WATER PLAN VIEW
Date:
Drawn By:
June 2017
Scale:
Sheet No.:
PMC
Approved By:
1"=150'
27
File No.:
CDL
154607
Revision No.:
1
2
3
4
Revisions:
Date:
Notes:
08/01/2017
DNR Appl. Checklist Revs.
10/04/2017
DNR Requested Info.
10/26/2017
USACE & DNR Rqstd Info.
01/30/2018
Disposal Areas
APTIM Environmental
& Infrastructure, Inc.
NOTE:
ALL UTILITIES WILL BE CONSTRUCTED
WITHIN THE EXISTING RIGHT OF WAY
" FOR PERMITTING ONLY " This document is not to be used for construction, bidding, conveyance or sales. Jeffery Pena, Lic# 29388
TERREBONNE LEVEE & CONSERVATION DISTRICT
HOUMA NAVIGATION CANAL LOCK COMPLEX
TERREBONNE PARISH, LA.
T20S, R17E, SECTS 16 & 21
UTILITIES
POTABLE WATER PLAN VIEW
Date:
Drawn By:
June 2017
Scale:
Sheet No.:
PMC
Approved By:
1"=150'
28
File No.:
CDL
154607
Revision No.:
1
2
3
4
Revisions:
Date:
Notes:
08/01/2017
DNR Appl. Checklist Revs.
10/04/2017
DNR Requested Info.
10/26/2017
USACE & DNR Rqstd Info.
01/30/2018
Disposal Areas
APTIM Environmental
& Infrastructure, Inc.
NOTE:
ALL UTILITIES WILL BE CONSTRUCTED
WITHIN THE EXISTING RIGHT OF WAY
" FOR PERMITTING ONLY " This document is not to be used for construction, bidding, conveyance or sales. Jeffery Pena, Lic# 29388
TERREBONNE LEVEE & CONSERVATION DISTRICT
HOUMA NAVIGATION CANAL LOCK COMPLEX
TERREBONNE PARISH, LA.
T20S, R17E, SECTS 16 & 21
UTILITIES
POTABLE WATER PLAN VIEW
Date:
Drawn By:
June 2017
Scale:
Sheet No.:
PMC
Approved By:
1"=150'
29
File No.:
CDL
154607
Revision No.:
1
2
3
4
Revisions:
Date:
Notes:
08/01/2017
DNR Appl. Checklist Revs.
10/04/2017
DNR Requested Info.
10/26/2017
USACE & DNR Rqstd Info.
01/30/2018
Disposal Areas
APTIM Environmental
& Infrastructure, Inc.
NOTE:
ALL UTILITIES WILL BE CONSTRUCTED
WITHIN THE EXISTING RIGHT OF WAY
" FOR PERMITTING ONLY " This document is not to be used for construction, bidding, conveyance or sales. Jeffery Pena, Lic# 29388
TERREBONNE LEVEE & CONSERVATION DISTRICT
HOUMA NAVIGATION CANAL LOCK COMPLEX
TERREBONNE PARISH, LA.
T20S, R17E, SECTS 16 & 21
UTILITIES
POTABLE WATER AND
SEWER SERVICE DETAILS
Date:
Drawn By:
June 2017
Scale:
Sheet No.:
PMC
Approved By:
N.T.S.
30
File No.:
CDL
154607
Revision No.:
1
2
3
4
Revisions:
Date:
Notes:
08/01/2017
DNR Appl. Checklist Revs.
10/04/2017
DNR Requested Info.
10/26/2017
USACE & DNR Rqstd Info.
01/30/2018
Disposal Areas
APTIM Environmental
& Infrastructure, Inc.
EN
T
NM
AL
IG
JE
CT
PR
O
PLACE RIPRAP
ALONG SLOPE
DREDGING
LIMITS
PLACE RIPRAP IN
-26.0 FT GRADE
FOOTPRINT
DREDGING
LIMITS
PLACE RIPRAP
ALONG SLOPE
PLACE
RIPRAP
BEHIND
FLOODWALL
PLACE
RIPRAP
ALONG
SLOPE
SHORELINE TO BE
ARMORED WITH
RIPRAP BERM
PLACE RIPRAP IN
-26.0 FT GRADE
FOOTPRINT
PLACE
RIPRAP
ALONG
SLOPE
" FOR REVIEW ONLY " This document is not to be used for construction, bidding, conveyance or sales. Jeffery Pena, Lic# 29388
TERREBONNE LEVEE & CONSERVATION DISTRICT
HOUMA NAVIGATION CANAL LOCK COMPLEX
TERREBONNE PARISH, LA.
T20S, R17E, SECTS 16 & 21
SCOUR PROTECTION
PLAN VIEW
Date:
Drawn By:
June 2017
Scale:
Sheet No.:
PMC
Approved By:
1" = 600'
31
File No.:
CDL
* GEOTEXTILE FABRIC, (CLASS D)
TO BE PLACED BENEATH RIPRAP,
(CLASS 250)
154607
Revision No.:
1
2
3
4
Revisions:
Date:
Notes:
08/01/2017
DNR Appl. Checklist Revs.
10/04/2017
DNR Requested Info.
10/26/2017
USACE & DNR Rqstd Info.
01/30/2018
Disposal Areas
APTIM Environmental
& Infrastructure, Inc.
43.58'
305.37'
519.41'
SECTION STA. 527+10
A
31 32
78.40'
305.37'
521.40'
SECTION STA. 523+12
B
31 32
" FOR REVIEW ONLY " This document is not to be used for construction, bidding, conveyance or sales. Jeffery Pena, Lic# 29388
TERREBONNE LEVEE & CONSERVATION DISTRICT
HOUMA NAVIGATION CANAL LOCK COMPLEX
TERREBONNE PARISH, LA.
SCOUR PROTECTION
CROSS SECTIONS
Date:
Drawn By:
June 2017
Scale:
Horiz. 1" = 200'
Vert. 1" = 40'
Sheet No.:
PMC
Approved By:
32
File No.:
CDL
154607
Revision No.:
1
2
3
4
Revisions:
Date:
Notes:
08/01/2017
DNR Appl. Checklist Revs.
10/04/2017
DNR Requested Info.
10/26/2017
USACE & DNR Rqstd Info.
01/30/2018
Disposal Areas
APTIM Environmental
& Infrastructure, Inc.
176.05'
174.64'
457.35'
SECTION STA. 519+10
C
31 33
304.22'
526.28'
SECTION STA. 511+11
E
31 33
" FOR REVIEW ONLY " This document is not to be used for construction, bidding, conveyance or sales. Jeffery Pena, Lic# 29388
TERREBONNE LEVEE & CONSERVATION DISTRICT
HOUMA NAVIGATION CANAL LOCK COMPLEX
TERREBONNE PARISH, LA.
SCOUR PROTECTION
CROSS SECTIONS
Date:
Drawn By:
June 2017
Scale:
Horiz. 1" = 200'
Vert. 1" = 40'
Sheet No.:
PMC
Approved By:
33
File No.:
CDL
154607
Revision No.:
1
2
3
4
Revisions:
Date:
Notes:
08/01/2017
DNR Appl. Checklist Revs.
10/04/2017
DNR Requested Info.
10/26/2017
USACE & DNR Rqstd Info.
01/30/2018
Disposal Areas
APTIM Environmental
& Infrastructure, Inc.
A
34 35
PLAN LAYOUT
SCALE: 1" = 100'
" FOR REVIEW ONLY " This document is not to be used for construction, bidding, conveyance or sales. Jeffery Pena, Lic# 29388
TERREBONNE LEVEE & CONSERVATION DISTRICT
HOUMA NAVIGATION CANAL LOCK COMPLEX
TERREBONNE PARISH, LA.
T20S, R17E, SECTS 16 & 21
TYPICAL LOCK CHAMBER
BRACED WALL PLAN LAYOUT
Date:
Drawn By:
June 2017
Scale:
Sheet No.:
PMC
Approved By:
1" = 100'
34
File No.:
CDL
154607
Revision No.:
1
2
3
4
Revisions:
Date:
Notes:
08/01/2017
DNR Appl. Checklist Revs.
10/04/2017
DNR Requested Info.
10/26/2017
USACE & DNR Reqstd Info
01/30/2018
Disposal Areas
APTIM Environmental
& Infrastructure, Inc.
SECTION
A
34 35
SCALE: 1" = 12'
" FOR REVIEW ONLY " This document is not to be used for construction, bidding, conveyance or sales. Jeffery Pena, Lic# 29388
TERREBONNE LEVEE & CONSERVATION DISTRICT
HOUMA NAVIGATION CANAL LOCK COMPLEX
TERREBONNE PARISH, LA.
T20S, R17E, SECTS 16 & 21
TYPICAL LOCK CHAMBER
BRACED WALL SECTION
Date:
Drawn By:
June 2017
Scale:
Sheet No.:
PMC
Approved By:
1" = 12'
35
File No.:
CDL
154607
Revision No.:
1
2
3
4
Revisions:
Date:
Notes:
08/01/2017
DNR Appl. Checklist Revs.
10/04/2017
DNR Requested Info.
10/26/2017
USACE & DNR Reqstd Info
01/30/2018
Disposal Areas
APTIM Environmental
& Infrastructure, Inc.
B
A
C
SECTION
B
SCALE: 3/32" = 1'-0"
SECTION
PLAN - LOCK CHAMBER GUIDE WALLS
A
SCALE: 1" = 10'
SCALE: 1" = 20'
SECTION
C
SCALE: 3/32" = 1'-0"
WALKWAY SECTION
NOTE:
SCALE: 1" = 5'
CHANNEL SIDE ELEVATION
" FOR REVIEW ONLY " This document is not to be used for construction, bidding, conveyance or sales. Jeffery Pena, Lic# 29388
SCALE: 3/32" = 1'-0"
TERREBONNE LEVEE & CONSERVATION DISTRICT
HOUMA NAVIGATION CANAL LOCK COMPLEX
TERREBONNE PARISH, LA.
T20S, R17E, SECTS 16 & 21
TYPICAL GUIDE WALL
DETAILS
Date:
Drawn By:
June 2017
Scale:
Sheet No.:
PMC
Approved By:
VARIES
36
File No.:
CDL
154607
Revision No.:
1
2
3
4
Revisions:
Date:
Notes:
08/01/2017
DNR Appl. Checklist Revs.
10/04/2017
DNR Requested Info.
10/26/2017
USACE & DNR Reqstd Info
01/30/2018
Disposal Areas
APTIM Environmental
& Infrastructure, Inc.
A
PLAN VIEW
SCALE: 1" = 25'
SECTION
A
SCALE: 1" = 20'
" FOR REVIEW ONLY " This document is not to be used for construction, bidding, conveyance or sales. Jeffery Pena, Lic# 29388
TERREBONNE LEVEE & CONSERVATION DISTRICT
HOUMA NAVIGATION CANAL LOCK COMPLEX
TERREBONNE PARISH, LA.
T20S, R17E, SECTS 16 & 21
FLOODGATE JACKET
PLAN AND SECTION
Date:
Drawn By:
June 2017
Scale:
Sheet No.:
PMC
Approved By:
VARIES
37
File No.:
CDL
154607
Revision No.:
1
2
3
4
Revisions:
Date:
Notes:
08/01/2017
DNR Appl. Checklist Revs.
10/04/2017
DNR Requested Info.
10/26/2017
USACE & DNR Reqstd Info
01/30/2018
Disposal Areas
APTIM Environmental
& Infrastructure, Inc.
PROTECTED SIDE
FLOOD SIDE
ELEVATION (CHANNEL SIDE)
SCALE: 1" = 25'
" FOR REVIEW ONLY " This document is not to be used for construction, bidding, conveyance or sales. Jeffery Pena, Lic# 29388
TERREBONNE LEVEE & CONSERVATION DISTRICT
HOUMA NAVIGATION CANAL LOCK COMPLEX
TERREBONNE PARISH, LA.
T20S, R17E, SECTS 16 & 21
FLOODGATE JACKET
CHANNEL SIDE ELEVATION
Date:
Drawn By:
June 2017
Scale:
Sheet No.:
PMC
Approved By:
1" = 25'
38
File No.:
CDL
154607
Revision No.:
1
2
3
4
Revisions:
Date:
Notes:
08/01/2017
DNR Appl. Checklist Revs.
10/04/2017
DNR Requested Info.
10/26/2017
USACE & DNR Reqstd Info
01/30/2018
Disposal Areas
APTIM Environmental
& Infrastructure, Inc.
LOCK GUIDE WALL PLAN
SCALE: 1" = 300'
" FOR REVIEW ONLY " This document is not to be used for construction, bidding, conveyance or sales. Jeffery Pena, Lic# 29388
TERREBONNE LEVEE & CONSERVATION DISTRICT
HOUMA NAVIGATION CANAL LOCK COMPLEX
TERREBONNE PARISH, LA.
T20S, R17E, SECTS 16 & 21
GUIDE WALL OVERALL PLAN
Date:
Drawn By:
June 2017
Scale:
Sheet No.:
PMC
Approved By:
1" = 300'
39
File No.:
CDL
154607
Revision No.:
1
2
3
4
Revisions:
Date:
Notes:
08/01/2017
DNR Appl. Checklist Revs.
10/04/2017
DNR Requested Info.
10/26/2017
USACE & DNR Reqstd Info
01/30/2018
Disposal Areas
APTIM Environmental
& Infrastructure, Inc.
" FOR REVIEW ONLY " This document is not to be used for construction, bidding, conveyance or sales. Jeffery Pena, Lic# 29388
TERREBONNE LEVEE & CONSERVATION DISTRICT
HOUMA NAVIGATION CANAL LOCK COMPLEX
TERREBONNE PARISH, LA.
T20S, R17E, SECTS 16 & 21
NOSE PIER DETAILS
Date:
Drawn By:
June 2017
Scale:
Sheet No.:
PMC
Approved By:
N.T.S.
40
File No.:
CDL
154607
Revision No.:
1
2
3
4
Revisions:
Date:
Notes:
08/01/2017
DNR Appl. Checklist Revs.
10/04/2017
DNR Requested Info.
10/26/2017
USACE & DNR Reqstd Info
01/30/2018
Disposal Areas
APTIM Environmental
& Infrastructure, Inc.
MHW EL. 3.0'
MLW EL. 0.0'
" FOR REVIEW ONLY " This document is not to be used for construction, bidding, conveyance or sales. Jeffery Pena, Lic# 29388
TERREBONNE LEVEE & CONSERVATION DISTRICT
HOUMA NAVIGATION CANAL LOCK COMPLEX
TERREBONNE PARISH, LA.
T20S, R17E, SECTS 16 & 21
DOLPHIN PLAN AND ELEVATION
FLOOD SIDE +24.7
Date:
Drawn By:
June 2017
Scale:
Sheet No.:
PMC
Approved By:
N.T.S
41
File No.:
CDL
154607
Revision No.:
1
2
3
4
Revisions:
Date:
Notes:
08/01/2017
DNR Appl. Checklist Revs.
10/04/2017
DNR Requested Info.
10/26/2017
USACE & DNR Reqstd Info
01/30/2018
Disposal Areas
APTIM Environmental
& Infrastructure, Inc.
MHW EL. 3.0'
MLW EL. 0.0'
" FOR REVIEW ONLY " This document is not to be used for construction, bidding, conveyance or sales. Jeffery Pena, Lic# 29388
TERREBONNE LEVEE & CONSERVATION DISTRICT
HOUMA NAVIGATION CANAL LOCK COMPLEX
TERREBONNE PARISH, LA.
T20S, R17E, SECTS 16 & 21
DOLPHIN PLAN AND ELEVATION
PROTECTED SIDE +10.0'
Date:
Drawn By:
June 2017
Scale:
Sheet No.:
PMC
Approved By:
N.T.S.
42
File No.:
CDL
154607
Revision No.:
1
2
3
4
Revisions:
Date:
Notes:
08/01/2017
DNR Appl. Checklist Revs.
10/04/2017
DNR Requested Info.
10/26/2017
USACE & DNR Reqstd Info
01/30/2018
Disposal Areas
APTIM Environmental
& Infrastructure, Inc.
DREDGE PIPELINE
A
DREDGE PIPELINE
±68 ACRES
409,500 C.Y. BENEFICIAL SPOIL PLACEMENT
PROPOSED
HNC LOCK
COMPLEX
B
±71 ACRES
424,000 C.Y. BENEFICIAL SPOIL PLACEMENT
UNDERWATER P/L CROSSING
DREDGE PIPELINE
APPROX. 26,500 FEET
±106 ACRES
544,500 C.Y. BENEFICIAL SPOIL PLACEMENT
DREDGE PIPELINE
C
±50 ACRES
BENEFICIAL SPOIL PLACEMENT IF NEEDED
" FOR PERMITTING ONLY " This document is not to be used for construction, bidding, conveyance or sales. Jeffery Pena, Lic# 29388
TERREBONNE LEVEE & CONSERVATION DISTRICT
HOUMA NAVIGATION CANAL LOCK COMPLEX
TERREBONNE PARISH, LA.
T20S, R17E, SECTS 16 & 21
DREDGE DISPOSAL AREA
PLAN
Date:
Drawn By:
June 2017
Scale:
Sheet No.:
LDE
Approved By:
1"=2,600'
44
File No.:
CDL
154607
Revision No.:
1
2
3
4
Revisions:
Date:
Notes:
08/01/2017
DNR Appl. Checklist Revs.
10/04/2017
DNR Requested Info.
10/26/2017
DNR Requested Info.
01/30/2018
Disposal Areas
APTIM Environmental
& Infrastructure, Inc.
B
A
SECTION THRU AREAS "A" & "B"
Scale: 1" = 20' HORIZONTAL
1" = 4' VERTICAL
C
SECTION THRU AREA "C"
Scale: 1" = 20' HORIZONTAL
1" = 4' VERTICAL
TEMPORARY PIPELINE INSTALATION DETAIL
SCALE: N.T.S.
" FOR PERMITTING ONLY " This document is not to be used for construction, bidding, conveyance or sales. Jeffery Pena, Lic# 29388
TERREBONNE LEVEE & CONSERVATION DISTRICT
HOUMA NAVIGATION CANAL LOCK COMPLEX
TERREBONNE PARISH, LA.
T20S, R17E, SECTS 16 & 21
DREDGE DISPOSAL AREA
SECTIONS
Date:
Drawn By:
June 2017
Scale:
Sheet No.:
LDE
Approved By:
1"=20'
45
File No.:
CDL
154607
Revision No.:
1
2
3
4
Revisions:
Date:
Notes:
08/01/2017
DNR Appl. Checklist Revs.
10/04/2017
DNR Requested Info.
10/26/2017
USACE & DNR Req Info.
01/30/2018
Disposal Areas
APTIM Environmental
& Infrastructure, Inc.
BUBBA DOVE FLOODGATE - PLAN VIEW @ EL. 5.0
SCALE: 1/32" = 1'-0"
" FOR REVIEW ONLY " This document is not to be used for construction, bidding, conveyance or sales. Jeffery Pena, Lic# 29388
TERREBONNE LEVEE & CONSERVATION DISTRICT
HOUMA NAVIGATION CANAL LOCK COMPLEX
TERREBONNE PARISH, LA.
T20S, R17E, SECTS 16 & 21
FLOODGATE PLAN
@ EL. 5.0
Date:
Drawn By:
January 30, 2018
Scale:
Sheet No.:
PMC
Approved By:
AS SHOWN
46
File No.:
CDL
154607
Revision No.:
1
2
3
4
Revisions:
Date:
Notes:
08/01/2017
DNR Appl. Checklist Revs.
10/04/2017
DNR Requested Info.
10/26/2017
USACE & DNR Reqstd Info
01/30/2018
Disposal Areas
APTIM Environmental
& Infrastructure, Inc.
BUBBA DOVE FLOODGATE - ELEVATION VIEW
SCALE: 1/32" = 1'-0"
" FOR REVIEW ONLY " This document is not to be used for construction, bidding, conveyance or sales. Jeffery Pena, Lic# 29388
TERREBONNE LEVEE & CONSERVATION DISTRICT
HOUMA NAVIGATION CANAL LOCK COMPLEX
TERREBONNE PARISH, LA.
T20S, R17E, SECTS 16 & 21
FLOODGATE ELEVATION VIEW
Date:
Drawn By:
January 30, 2018
Scale:
Sheet No.:
PMC
Approved By:
1"=40,000'
47
File No.:
CDL
154607
Revision No.:
1
2
3
4
Revisions:
Date:
Notes:
08/01/2017
DNR Appl. Checklist Revs.
10/04/2017
DNR Requested Info.
10/26/2017
USACE & DNR Reqstd Info
01/30/2018
Disposal Areas
APTIM Environmental
& Infrastructure, Inc.
GENERAL NOTES:
Approximately 1,378,000 cubic yards of material will be dredged from the HNC and used to create a marsh platform, shown on Sheet 44.
Approximately 28,500 cubic yards of hauled in material will be used for the levee tie-in along with approximately 16,000 cubic yards of rip
rap.
Approximately 220,000 cubic yards of rip rap and 2,400 cubic yards of concrete will be used for bankline stabilization and scour
protection.
Approximately 500 cubic yards of hauled in material, 19,500 cubic yards of limestone, and 6,000 cubic yards of asphalt will be used for
the access roads.
Approximately 8,600 cubic yards of hauled in material will be used to backfill the utility locations.
Approximately 5,000 cubic yards of dredged material from marina access canal.
Approximately 19.2 acres of wetlands will be impacted by this activity.
The existing 250' floodgate and floodwalls constructed under permit # MVN 2009-00559-WJJ and P 2009 0205
will be removed or incorporated into the proposed floodgate and lock complex.
The Dredge Material will be used beneficially to create approximately 245 Acres of Marsh Habitat with a 50 acre overflow area if needed
Areas A and B will have partial containment.
" FOR REVIEW ONLY " This document is not to be used for construction, bidding, conveyance or sales. Jeffery Pena, Lic# 29388
TERREBONNE LEVEE & CONSERVATION DISTRICT
HOUMA NAVIGATION CANAL LOCK COMPLEX
TERREBONNE PARISH, LA.
T20S, R17E, SECTS 16 & 21
GENERAL NOTES
Date:
Drawn By:
June 2017
Scale:
Sheet No.:
PMC
Approved By:
N.T.S.
48
File No.:
CDL
154607
Revision No.:
1
2
3
4
Revisions:
Date:
Notes:
08/01/2017
DNR Appl. Checklist Revs.
10/04/2017
DNR Requested Info.
10/26/2017
USACE & DNR Reqstd Info
01/30/2018
Disposal Areas
APTIM Environmental
& Infrastructure, Inc.
FLOOD CONTROL:
Based on the Flood Closure Criteria from the Final RPEIS dated May 2013, the HNC Lock and Floodgate will be closed once a watch has been
issued by the National Hurricane Center AND the stage measured at the gate location reaches +2.5 ft NAVD88. The gates can only be reopened
once the watch has been discontinued AND the stages on the differential between the interior water level and exterior water level is equal to or
less than the +1.0 feet as measured on the upstream and downstream staff gage AND the channel has been cleared of obstructions.
SALINITY CONTROL:
The HNC Lock and floodgate would be closed for salinity only if:
1. Flows in the Atchafalaya River are below 100,000 cfs as measured at Simmesport gage (USGS 07381490) or
2. If a gage on the outside of the Lock Complex exceeds a salinity value that has been correlated with preventing exceedance of the maximum
allowable chloride level of 250 ppm. The structure should be closed for at least 12 hours and fluctuations in chloride levels should be
monitored and recorded hourly.
The HNC Lock complex may be opened when all of the following criteria have been met:
1. After monitoring chloride levels over the 12 hour period at the new gage on the outside of the Lock complex drops below the salinity
closure trigger.
" FOR REVIEW ONLY " This document is not to be used for construction, bidding, conveyance or sales. Jeffery Pena, Lic# 29388
TERREBONNE LEVEE & CONSERVATION DISTRICT
HOUMA NAVIGATION CANAL LOCK COMPLEX
TERREBONNE PARISH, LA.
T20S, R17E, SECTS 16 & 21
OPERATION PLAN
Date:
Drawn By:
June 2017
Scale:
Sheet No.:
PMC
Approved By:
N.T.S.
49
File No.:
CDL
154607
Revision No.:
1
2
3
4
Revisions:
Date:
Notes:
08/01/2017
DNR Appl. Checklist Revs.
10/04/2017
DNR Requested Info.
10/26/2017
USACE & DNR Reqstd Info
01/30/2018
Disposal Areas
APTIM Environmental
& Infrastructure, Inc.
iDocs Document No.; Issue Statement; Ver. 0; 19Feb2018
Legend
Marsh Creation Areas Impacts
ROW
Brackish Marsh - Dredge Area (17.6)
Brackish Marsh - Fill Area (1.6)
Brackish Marsh - Marsh Creation Area (2.2)
Non-Wetland - Fill (19)
Water - Dredge Area (68.8)
Water - Fill (0.5)
REFERENCE:
TERREBONNE LEVEE AND
CONSERVATION DISTRICT
o
V:\CAD\154607 HNC Lock\GIS\GIS_Documents\Project_Maps\WetlandImpact_102617.mxd; Analyst: charlotte.liner; Date: 2/19/2018 12:49:06 PM
Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community
600 300 0
600
1,200
Feet
HNC LOCK COMPLEX
FIGURE
NUMBER
1
HABITAT IMPACT MAP
2509 PETROLEUM DRIVE
HOUMA, LA 70363
www.APTIM.com