PERMIT MODIFICATION TO ADDRESS PERMIT NON-COMPLIANCE FOR A RECREATIONAL DOCK ON BAYOU GRAND CAILLOU
TERREBONNE PARISH
NAME OF APPLICANT: GARY GARBER, c/o Delta Coast Consultants, LLC, Attn: Alan Jolly, 4924 Louisiana Highway 311, Houma, Louisiana70364.
LOCATION OF WORK: Bayou Grand Caillou, located at 8177 Shrimpers Row, Dulac, Louisiana, (29.373677, -90.717805), in Terrebonne Parish, as shown on the enclosed drawings, within Hydrologic Unit Code 08090302, West Central Louisiana Coastal, Louisiana.
CHARACTER OF WORK: The applicant has requested Department of the Army authorization to install and maintain a 68-ft long by 90-ft wide recreational dock with boat slip, with a recreational boil room and elevated bathroom in Bayou Grand Caillou. The structure extends 65’ 4” channelward where Bayou Grand Caillou’s width is approximately 325 feet wide. The original permit, issued on March 21, 2011, authorized the applicant to install and maintain a dock, rip-rap and appurtenant facilities. The applicant constructed an additional walkway to create a 12-ft wide boat slip, an elevated bathroom with sewer connections and additional decking channelward. The permitted rip-rap for erosion control was not required, and therefore, not installed. The applicant constructed the structure and was found to be non-compliant with the permit conditions. No dredging or fill was required and no special aquatic sites were affected by this project.
DEPARTMENT OF THE ARMY
CORPS OF ENGINEERS, NEW ORLEANS DISTRICT
7400 LEAKE AVE
NEW ORLEANS LA 70118-3651
July 23, 2018
Operations Division
Central Evaluation Section
Project Manager
Dirreen Arnold
(504) 862-2301
Dirreen.S.Arnold@usace.army .mil
SUBJECT: MVN 2010-00936 CA
PUBLIC NOTICE
Interested parties are hereby notified that a permit application has been received
by the New Orleans District of the US Army Corps of Engineers pursuant to: [X] Section
10 of the Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or
[ ] Section 404 of the Clean Water Act (86 Stat. 816; 33 USC 1344).
PERMIT MODIFICATION TO ADDRESS PERMIT NON-COMPLIANCE FOR A
RECREATIONAL DOCK ON BAYOU GRAND CAILLOU
TERREBONNE PARISH
NAME OF APPLICANT: GARY GARBER, c/o Delta Coast Consultants, LLC, Attn:
Alan Jolly, 4924 Louisiana Highway 311, Houma, Louisiana 70364
LOCATION OF WORK: Bayou Grand Caillou, located at 8177 Shrimpers Row, Dulac,
Louisiana, (29.373677, -90.717805), in Terrebonne Parish, as shown on the enclosed
drawings, within Hydrologic Unit Code 08090302, West Central Louisiana Coastal,
Louisiana.
CHARACTER OF WORK: The applicant has requested Department of the Army
authorization to install and maintain a 68-ft long by 90-ft wide recreational dock with
boat slip, with a recreational boil room and elevated bathroom in Bayou Grand Caillou.
The structure extends 65' 4" channelward where Bayou Grand Caillou's width is
approximately 325 feet wide. The original permit, issued on March 21, 2011, authorized
the applicant to install and maintain a dock, rip-rap and appurtenant facilities. The
applicant constructed an additional walkway to create a 12-ft wide boat slip, an elevated
bathroom with sewer connections and additional decking channelward. The permitted
rip-rap for erosion control was not required, and therefore, not installed. The applicant
constructed the structure and was found to be non-compliant with the permit conditions.
No dredging or fill was required and no special aquatic sites were affected by this
project.
-2-
The comment period for the Department of the Army Permit will close 15 days
from the date of this public notice. Written comments, including suggestions for
modifications or objections to the proposed work, stating reasons thereof, are being
solicited from anyone having interest in this permit must be mailed so as to be received
before or by the last day of the comment period. Letters concerning the Corps of
Engineers permit application must reference the applicant's name and the Permit
Application Number, and be mailed to the Corps of Engineers at the address above,
ATTENTION: REGULATORY BRANCH. Individuals or parties may request an
extension of time in which to comment on the proposed work by writing or e-mailing the
Corps of Engineers Project Manager listed above. Any request must be specific and
substantively supportive of the requested extension, and received by this office prior to
the end of the initial comment period. The Section Chief will review the request and the
requestor will be promptly notified of the decision to grant or deny the request. If
granted, the time extension will be continuous to the initial comment period and,
inclusive of the initial comment period, will not exceed a total of 30 calendar days.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the
probable impacts, including cumulative impacts of the proposed activity on the public
interest. That decision will reflect the national concern for both protection and utilization
of important resources. The benefit which reasonably may be expected to accrue from
the proposal must be balanced against its reasonably foreseeable detriments. All
factors which may be relevant to the proposal will be considered including the
cumulative effects thereof; among those are conservation, economics, aesthetics,
general environmental concerns, wetlands, historic properties, fish and wildlife values,
flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion,
recreation, water supply and conservation, water quality, energy needs, safety, food and
fiber production, mineral needs, considerations of property ownership and, in general,
the needs and welfare of the people.
The U.S. Army Corps of Engineers is soliciting comments from the public, federal,
state, and local agencies and officials, Indian Tribes, and other interested parties in
order to consider and evaluate the impacts of this proposed activity. Any comments
received will be considered by the U.S. Army Corps of Engineers to determine whether
to make, modify, condition, or deny a permit for this proposal. To make this decision,
comments are used to assess impacts on endangered species, historic properties,
water quality, general environmental effects, and other public interest factors listed
above. Comments are used in the preparation of an Environmental Assessment and/or
an Environmental Impact Statement pursuant to the National Environmental Policy Act.
Comments are also used to determine the need for a public hearing and to determine
the overall public interest of the proposed activity.
-3-
The New Orleans District is unaware of properties listed on the National Register
of Historic Places near the proposed work. The possibility exists that the proposed work
may damage or destroy presently unknown archeological, scientific, pre-historical,
historical sites, or data. Issuance of this public notice solicits input from the State
Archeologist and State Historic Preservation Officer regarding potential impacts to
cultural resources.
Our initial finding is that the proposed work would not affect any species, nor affect
any habitat designated as critical to the survival and recovery of such species, listed as
endangered by the U.S. Department of Commerce.
The New Orleans District has determined that the proposed project is located
within waters known to be occupied by the endangered West Indian Manatee
(Trichechus manatus) and determined with the inclusion of the Standard Manatee
Conditions for In-Water Activities the proposed activity is not likely to adversely affect
the species based on the Standard Local Operating Procedure for Endangered Species
in Louisiana (SLOPES), dated October 22, 2014, between the U.S. Army Corps of
Engineers, New Orleans and U.S. Fish and Wildlife Service, Ecological Services Office.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of
the Magnuson-Stevens Fishery Conservation and Management Act. The applicant's
proposal may result in the destruction or alteration of N/A acres of EFH utilized by
various life stages of red drum and penaeid shrimp. Our initial determination is that the
proposed action would not have a substantial adverse impact on EFH or federally
managed fisheries in the Gulf of Mexico. Our final determination relative to project
impacts and the need for mitigation measures is subject to review by and coordination
with the National Marine Fisheries Service.
If the proposed work involves deposits of dredged or fill material into navigable
waters, the evaluation of the probable impacts will include the application of guidelines
established by the Administrator of the Environmental Protection Agency. Also, a
certification that the proposed activity will not violate applicable water quality standards
will be required from the Department of Environmental Quality, before a permit is
issued.
Any person may request, in writing, within the comment period specified in this
notice, that a public hearing be held to consider this application. Requests for public
hearings shall state, with particularity, the reasons for holding a public hearing.
-4-
The applicant has certified that the proposed activity described in the application
complies with and will be conducted in a manner that is consistent with the Louisiana
Coastal Resources Program. The Department of the Army permit will not be issued
unless the applicant received approval or a waiver of the Coastal Use Permit by the
Department of Natural Resources.
You are requested to communicate the information contained in this notice to any
other parties whom you deem likely to have interest in the matter.
JOHN M. HERMAN
Chief, Central Evaluation Section
Regulatory Branch
Enclosure
DELT
CO ST
CONSULT NTS, LLC
4924 HWY 311 - HOUMA, LA 70360
www.deltacoastllc.com FAX: 985-262-4567
PHONE: 985-655-3100
DELT
CO ST
CONSULT NTS, LLC
4924 HWY 311 - HOUMA, LA 70360
www.deltacoastllc.com FAX: 985-262-4567
PHONE: 985-655-3100