You can copy from here when filling out the rest of the page.
The overall project purpose is the construction of a whitewater park that would mitigate the known hazard surrounding the existing Lake Frances Dam, while providing recreational opportunity and promoting economic development in northeastern Oklahoma, and maintaining the water surface elevation required for the operation of the City of Siloam Springs sole water intake facility/pump station located approximately 1,000 feet upstream of the Lake Frances Dam.
The application is for the placement of fill material in waters of the United States, for the proposed construction of the Lake Frances Whitewater Park. Approximately 2 acres of temporary fill and 1 acre of permanent fill would occur in the Illinois River and approximately 1.633 acres of permanent fill would occur in adjacent Palustrine areas, in order to accommodate the proposed project.
The proposed work involves a 1,200-foot bypass channel with an alignment that follows a low area in the overbank. Dam hazard mitigation consists of building grouted boulder steps downstream of the dam crest. These steps would eliminate the formation of overly retentive hydraulics and decrease the drowning hazards at the dam.