Home

Los Angeles District

Run scraper

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

Final EIR/EA 5 Year Planned Deviation to the Prado Dam Water Quality Plan & Sediment Mgmt Demonstration Project

The U.S. Army Corps of Engineers and the Orange County Water District have prepared the EA to evaluate the Planned Deviation and the implementation of the Sediment Management Project.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas